New Stoplog Lifter Latchford Dam
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Project Description:
- This project involves Goods Acquisition for a new stoplog lifter for the Latchford Dam.
- The supplier's scope includes design, fabrication, delivery, installation, and removal of existing stoplog lifter.
- All design and fabrication works will be completed within the supplier's shop.
- The delivery will involve access to site by the delivery vehicle (likely a flat bed) and by a crane. A crane is necessary to unload the stoplog lifter from the delivery vehicle onto the dam's operational deck.
- Road access for vehicles is available on both shores, which is typically used by mobile crane to perform dam operation during maintenance of existing stoplog lifter.
- Once the stoplog lifter is installed, a series of testing will be completed, which involves normal dam operations and stoplogs handling. Coordination with Water Management Engineers is planned.
- After the acceptance tests are completed, the existing stoplog lifter will be decommissioned and removed from site, using similar (if not same) equipment that was used for delivery.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
May, 11, 2023– The authority issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination | - | May 11, 2023 |
1 | New Stoplog Lifter Latchford Dam | - | October 13, 2022 |
Contacts
Environment, Health and SafetyPublic Services and Procurement Canada
2720 Riverside Drive
Ottawa, Ontario K1A 0M2
Email: TPSGC.RCNLVEEListedeControle-NCRECMPChecklist.PWGSC@tpsgc-pwgsc.gc.ca
-
Location
- Latchford Dam (Ontario)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2022-10-13 -
Proponent
PSPC -
Authorities
- Public Services and Procurement Canada
-
Assessment Type
Project on federal lands -
Reference Number
84032
Nearby assessments
...within 200 kilometres-
Latchford Dam - Public Safety Fencing
Latchford Dam -
Permanent Waterway Barriers for Latchford Dam
Latchford Dam -
Haileybury Bin Wall Repairs - Summer 2021
Haileybury -
Widjikiwe Gas Bar
Timiskaming -
Temagami First Nation Outdoor Cultural Spaces
Bear Island -
Marina Construction Project
Kebaowek -
Timiskaming Dam-Bridge of Quebec Replacement Project
Temiscaming -
Timiskaming Drinking Water Treatment System Replacement Project
Timiskaming Dam -
Upper Beaver Gold Project
19 kilometres (km) east of Kirkland Lake -
New Fibre Installation
Wahnapitae Indian Reserve No. 11 -
Wahnapitae First Nation - Landfill Closure and Waste Transfer Station Construction
Wahnapitae First Nation -
Wahnapitae First Nation - Prevention and Wellness Centre
Wahnapitae First Nation -
Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing
Wahnapitae First Nation -
Wahnapitae New Subdivision Lot Servicing and Pre-Construction Activities
Wahnapitae First Nation -
Matachewan New Housing Construction Project
Matachewan First Nation -
Construction of six prefabricated housing units
Algonquins of Barrière Lake -
Mnogin Constructed Wetland to Support Sustainable Water Treatment
Mnogin Constructed Wetland to Support Sustainable Water Treatment -
Short Range Development Road Upgrades and Bridge Replacement - 22 Wing North Bay
22 Wing North Bay -
VLA Water Plant Replacement
Nipissing -
Wasamac Gold Mine Project
Wasamac -
Wahnapitae First Nation
Wahnapitae First Nation -
Nipissing First Nation - Upgrades and Expansion of Garden Village Water Treatment Plant
Nipissing First Nation -
Nipissing First Nation - New Road Development: Yellek to Duchesnay
Nipissing First Nation - New Road Development: Yellek to Duchesnay -
Manston Crescent Municipal Upgrades, Canadian Forces Base North Bay, Ontario
Manston Crescent is located on the north end of Canadian Forces Base, 22 Wing, in North Bay -
Underground Complex Substation Replacement, North Bay, ON
Approximately 1.8 km south of 22 Wing's Main Base -
Chippewa Barracks Perimeter Security Fence, Fort Chippewa Barracks, 540 Chippewa St W, in North Bay Ontario
Fort Chippewa Barracks, 540 Chippewa St W, in North Bay -
Kipawa Rare Earths Project
Kipawa -
Energy East Project
North Bay -
Gazoduq Project
Near Ramore -
Hard Surface Replacement
1050 Notre Dame Avenue, Sudbury, Ontario -
Foundation Rehabilitation
19 Lisgar Street, Sudbury, Ontario -
Sagamok Anishnawbek Water Infrastructure
Sagamok First Nation Reserve -
Portage Dam Concrete Storage Pad
Portage Dam -
French River Dams - Bearing Repairs
French River Dams -
Roof Replacement - French River Dams Office
French River Dam -
French River Boathouse, Wharf, and Workshop
French River Dam Office -
French River Septic Replacement
French River Dam Office -
Dokis First Nation Hydro Line Servicing
Dokis First Nation -
Dokis First Nation - Lagoon Expansion
Dokis First Nation Reserve -
Atikameksheng By-Pass Road Construction
Naughton -
Atikameksheng Anishnawbek Septic & Watermain Upgrade
Naughton -
Atikameksheng Anishnawbek On Reserve New Housing
Atikameksheng Anishnawbek First Nation -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
-
Victoria Mine Project
Southwest of Sudbury -
Côté Gold Mine Project
Gogama -
Marban Gold Mine Project
Val-d'Or -
Century Gold Project
Timmins -
Replacement of the Very high-frequency Omni-directional range (VOR) at Val d'Or airport (YVO).
Val d'Or -
Replacement of the Britt Weather Radar
8 Station Road, Britt, Ontario, P0G 1A0 -
Dumont Nickel Mine Project
Amos -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
Henvey, Mason, Mowat -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
-
Magnetawan First Nation - Water Treatment Plant and Storage Upgrades
Magnetawan First Nation -
Magnetawan First Nation - Wastewater System Upgrades
Magnetawan First Nation -
Magnetawan First Nation Underground Storage Tank Removal - Band Office
Magnetawan First Nation -
Akasaba West Copper-Gold Mine Project
Val-d'Or -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
Wallbridge -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
-
Construction of second road access leading to the community
Indian reserve of the Abitibiwinni First Nation -
Expansion of the Rodeway Inn in Pikogan
Abitibiwinni First Nation -
North American Lithium Spodumene Mine Project
La Corne, near Barraute -
Longspur (Lang Lake) - Wharf Reconstruction
Longspur (Lang Lake) -
Novador Gold Mine Project
Val d'Or