Parks Canada Agency Backcountry Meadows Prescribed Burn
This project will be assessed with a basic impact assessment.
Jasper National Park Fire Operations is proposing to burn 24 locations throughout the park. These units are predominantly meadows which have had fire excluded from the area and has resulted in tree species to encroach the various meadows.
Fourteen units were previously assessed in accordance with the Canadian Environmental Assessment Act, but 10 units will need to be assessed under a Basic Impact Assessment (BIA) in accordance with the Parks Canada Directive on Impact Assessment, 2019 to further eliminate, control or minimize potential adverse effects. These 10 units are Adolphus, Aztec Meadows, Brazeau Meadows, Caribou Inn, Dean Meadows, Kane Meadows, Rock Creek, Topaz, Willow Creek II and Wolf Pass. Together these units are 3.8 km2.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New project being assessed by Parks Canada - Public comments invited from September 22 to October 22, 2021 | - | September 22, 2021 |
List all records
Contacts
Jasper National ParkBox 10
Jasper, Alberta T0E 1E0
Telephone: 780-852-6141
Email: evaluationdimpactjasper-jasperimpactassessment@pc.gc.ca
-
Location
- Jasper National Park (Alberta)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
In progress -
Start Date
2021-09-22 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
83030
Nearby assessments
..within 200 kilometres-
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Trail 1a Jasper National Park
Jasper National Park -
Pine Bungalows Master Plan 2021
Jasper National Park -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
JTA - Hochimini Trail Realignment
Jasper National Park -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Coalspur Vista Coal Underground Mine and Expansion Activities Project
10 kilometres east of Hinton -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Robb Trend Coal Mine Expansion Project
Robb -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
Edson -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Ruddock Creek Mine Project
Avola -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
Highway 947 Extension Project
-
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
Sunchild Gas Distribution Line
Sunchild -
Sunchild First Nation Subdivision Planning
Sunchild First Nation -
O'Chiese Indian Reserve Pipeline
Sunchild Indian Reserve -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
Hazard Spruce Tree Removal
Glacier National Park -
Sunchild 202 Reserve oil and gas development
Sunchild Reserve 202 -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
Margaret Creek Fish Barrier Creation
Banff National Park -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Harper Creek Mine Project
Vavenby -
CP Rail Mountain Subdivision, Mile 3.8 Boulder Creek Bridge Rehab and Bedload Removal
Yoko National Park -
BC Hydro Field Energy Storage Facility Temporary Generator
Yoko National Park -
Lake Louise Community Fire Guard
Banff National Park