Anaham Meadows Upper Diversion Repair
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
In April 2018, flows in Anaham Creek were unusually high (due to snow-melt), and the T'letinqox Government (TG) reported that some of the recently rehabilitated drainage infrastructure along the creek and diversion channel was damaged. Based on information provided by the TG and subsequent site investigations by KCB, the scope of repairs is expected to include the following:
1. The eroded left bank of Anaham Creek just upstream of the Upper Diversion structure will be graded to a minimum 2H:1V slope and a filter layer placed to provide erosion protection.
2. Erosion of the banks downstream of the Upper Diversion structure will be repaired to re-establish the separation of the diversion channel and Anaham Creek by placing fill and erosion protection between the channel and creek. All the embankments downstream of the Upper Diversion will be built up wherever erosion and/or back-cutting has occurred, by placing appropriate fill, filter layers/cloth, and riprap.
3. The anchors connecting the downstream steel columns of the walkway structure to the concrete piers will be reset at the two cracked locations, by:
(a) Removing the old anchors and any compromised concrete;
(b) Setting new anchors in their correct locations, to fit the current position of the steel column bases;
(c) Setting the new anchors in new concrete, anchored to the old concrete by steel reinforcing bars, appropriately embedded into the old and new concrete; and
(d) Fixing the steel walkway columns to the new anchors.
4. The creek-side gates of the Upper Diversion structure will be repaired following a mechanical investigation.
5. The diversion channel will be excavated to have a uniformly sloped gradient from the Upper Diversion to the road crossing culvert.
6. A washed out culvert upstream of the Upper Diversion will be repaired by adding an additional culvert and armouring the road and downstream embankment to prevent future erosion or washouts.
7. Further erosion at the downstream road crossing will be mitigated by armouring the road at the crossing.
8. The right bank at the irrigation point will be rehabilitated by placing and compacting fill material, the irrigation point will be moved to the road crossing culvert, and a channel will be excavated to connect the irrigation point to the rest of the meadow.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Contacts
Rachelle OrmondIndigenous Services Canada
Rachelle Ormond, Senior Engineer
Suite 600, 1138 Melville St
Vancouver, British Columbia V6E 4S3
Telephone: 604-363-0081
Email: rachelle.ormond3@canada.ca
-
Location
- T'letinqox Government IR2 and IR2A (British Columbia)
-
Nature of Activity
- Dams and reservoirs
-
Assessment Status
Completed -
Start Date
2021-09-16 -
Proponent
T'letinqox Government -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83011
Nearby assessments
...within 200 kilometres-
Yunesit'in - Arena Roof and Changeroom Project
Stone IR#1 -
Management of the Douglas-Fir Beetle (Dendroctonus pseudotsugae) Timber Harvest Lot 7741
Management of the Douglas-Fir Beetle (Dendroctonus pseudotsugae) Timber Harvest Lot 7741 -
Management of the Douglas-Fir Beetle (Dendroctonus pseudotsugae) Timber Harvest
Lot 7741 -
New Fibre Installation
Michelle Gardens IR 36 -
Telus Communications Inc., new radiocommunications tower (BC112314) at Redstone Flat I.R. No. 1.
BC112314 - Redstone -
Telus Communications Inc., new radiocommunications tower (BC105333) on Toosey I.R. No. 1, near Riske Creek, BC.
BC105333 - Toosey I.R. No. 1 -
Construction of a Cattle Exclusion Snake Fence - 3rd Canadian Division Support Base
3rd Canadian Division Support Base -
New Telus Communications Inc. Telecommunication Tower Project in Alkali Lake I.R. No. 1 on Esk'etemc Nation Lands
Alkali Lake I.R. No. 1 on Esk'etemc Nation Lands -
Prosperity Gold-Copper Mine Project (EA Completed)
Fish Lake -
New Prosperity Gold-Copper Mine Project
Fish Lake -
Esk'Etemc First Nation Road and Drainage Improvements (Alkali Lake)
Alkali Lake 1; Swan Lake 3; and Alkali Lake 4A -
Williams Lake First Nation Community Playground Project
Williams Lake First Nation Community Playground Project -
Timber Harvesting on Pete Suckers IR 13
Pete Suckers IR 13 -
Xeni Gwet'in Tanakut Waterline Extension
Xeni Gwet'in Lohbiee IR3 and Tanakut IR4 -
New Fibre Installation
James Louie 3A Reserve (Williams Lake First Nation) -
New Telus Communications Inc. Telecommunication Tower Project in Dog Creek 1 Reserve on Stswecem'c Xget'tem Nation Lands
Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
New Telus Communications Inc. Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Lhtako Dene Nation - George Longe Memorial Park Development
Quesnel 1 -
New Fibre Installation
Canoe Creek IR#2 -
New Fibre Installation
Towdystan IR#3 -
Spanish Mountain Gold Project
70 kilometres northeast of Williams Lake -
Spanish Mountain Gold Mine Project
70 kilometres northeast of Williams Lake -
New Fibre Installation
Fishtrap 19 IR -
Ulkatcho First Nation: Gas Station and Apartment, Phase I and II
Anahim Lake -
AIB reservoir Construction
Ashcroft -
Blackwater Gold Project
Vanderhoof -
N'Quatqua Multi-Use Facility Project
N'Quatqua Multi-Use Facility Project -
N'Quatqua Watermain Extension and Phase 1 Subdivision
N'Quatqua IR#1 -
N'Quatqua-Wastewater and Sludge Management
07991 - NEQUATQUE 1-75805CLSRBC / 75667CLSRBC -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
Cayoose Creek Water System Connection to Village of Lilloet
Cayoose Creek IR 1 -
Klinaklini Hydroelectric Project
Klinaklini River -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4