Wharf Reconstruction, Trout River, Newfoundland
DFO, Small Craft Harbour intends to complete a wharf reconstruction project in Trout River, Newfoundland. The scope of work for this project involves the demolition and removal of the existing timber crib wharf. This wharf will be replaced with a new steel sheet pile wharf. The new wharf will measure approximately 51.50m in length. The work includes the removal of an existing concrete deck, as well as the removal and replacement of an existing area of asphalt adjacent to the wharf site.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Fisheries and Oceans Canada- Small Craft Harbours (DFO-SCH) intends to make a determination regarding whether carrying out the wharf reconstruction, at the Small Craft Harbours site in Trout River is likely to cause significant adverse environmental effects. To help inform this determination, DFO-SCH is inviting public comments in respect to that determination for 30 days following the posting of this notice. Written comments must be submitted by August 28, 2021 to: Fisheries and Oceans Canada Paul Curran, Regional Engineer 10 Barters Hill St. John's, Newfoundland and Labrador A1C 5X1 Telephone: 709-772-6660 Email: paul.curran@dfo-mpo.gc.ca.
Contacts
Fisheries and Oceans CanadaPaul Curran, Regional Engineer
10 Barters Hill
St. John's, Newfoundland and Labrador A1C 5X1
Telephone: 709-772-6660
Email: paul.curran@dfo-mpo.gc.ca
-
Location
- Trout River (Newfoundland and Labrador)
-
Nature of Activity
- Ports and Harbours
-
Assessment Status
Completed -
Start Date
2021-07-28 -
Proponent
DFO, Small Craft Harbours -
Authorities
- Fisheries and Oceans Canada
-
Assessment Type
Project on federal lands -
Reference Number
82842
Nearby assessments
..within 200 kilometres-
Trout River Gulch Public and Commercial Snowmobile Corridor
Gros Morne National Park -
Harbour Development, Norris Point, Newfoundland
Norris Point (Neddys Harbour) -
Shoreline Protection, Rocky Harbour, NL
The DFO-SCH project site is located in Rocky Harbour, Newfoundland. -
Transmission Main from Chlorine Building to West Link Road
Rocky Harbour -
Environment and Climate Change Canada climate station relocation, Gros Morne National Park
Gros Morne National Park -
Lomond River fishway replacement
Lomond River -
Western Brook Bridge Replacement
Gros Morne National Park -
Summer guided activities by business license holders for Gros Morne National Park
Gros Morne National Park -
Lark Harbour Search and Rescue Wharf Extension
Main Road, Lark Harbour -
Visitor Centre Recapitalization in Gros Morne National Park
Gros Morne National Park -
Wharf Replacement, Frenchmans Cove, Newfoundland
Frenchmans Cove -
Slipway Construction, Lourdes, Newfoundland
Lourdes -
Wharf Reconstruction, Westport, NL
Westport, Newfoundland -
Wharf Reconstruction, Cape St. George, Newfoundland
Cape St. George -
Valentine Gold Project
Valentine Lake -
Marginal Wharf Reconstruction, Port aux Choix, NL
Port aux Choix, Newfoundland -
Launchway Improvements, Port Au Choix, NL
Port aux Choix, Newfoundland -
Point Rousse Port Facility Project
Baie Verte -
Completion work by the BCNHST, to bring the new transfer facilities for hydrocarbons up to standard - Tête-à-la-Baleine Wharf
Tête-à-la-Baleine Wharf -
Breakwater Construction, Barr'd Harbour, NL
Barr'd Harbour, Newfoundland -
DFO-SCH Floating Dock Installation, Roberts Arm, NL
Roberts Arm -
Marginal Wharf Construction, Lushes Bight, NL
The DFO-SCH project site is located in Lushes Bight, Newfoundland. -
Demolition of the Rappel Tower at Canadian Forces Base Beaumont Hamel Armoury, Grand Falls - Windsor, Newfoundland and Labrador
Beaumont Hamel Armoury is located off Memorial Avenue, on the western side of the Town of Grand Falls-Windsor -
Cape Ray Gold Project
Channel-Port aux Basques -
Stabilization of four stormwater outfalls, Unamen Shipu
Unamen Shipu