O'Chiese First Nation plans to replace and repair culvert and road assets damaged by the 2020 spring flooding. The proposed project will replace a damaged culvert, located at 8-2-45-11-W5M, with a new culvert of appropriate size for the drainage area. The project will also repair the road crossing the culvert to pre-flood condition and add erosion control.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the O'Chiese Culvert 2 Replacement Project | - | August 27, 2021 |
1 | O'Chiese Culvert 2 Replacement Project:Public Comment Period on Intent to Make a Determination | - | April 15, 2021 |
Contacts
Indigenous Services CanadaStacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca
-
Location
- O'Chiese First Nation (Alberta)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Start Date
2021-04-15 -
Proponent
O'Chiese First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81535
Nearby assessments
...within 200 kilometres-
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
Sunchild 202 Reserve oil and gas development
Sunchild Reserve 202 -
Sunchild Gas Distribution Line
Sunchild -
O'Chiese Indian Reserve Pipeline
Sunchild Indian Reserve -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
Edson Mainline Expansion Project
Drayton Valley -
Sunchild First Nation Lagoon and Residential Access Road Project
Sunchild First Nation -
Sunchild First Nation Subdivision Planning
Sunchild First Nation -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202 -
Edson Mainline Expansion Project
Drayton Valley -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
Stoney Big Horn AORHS and Health Center Project
Stoney Nakoda Nation -
Big Horn Fire Hall
Big Horn Reserve -
Genesee Generating Station Expansion Project
Near Warburg -
Robb Trend Coal Mine Expansion Project
Robb -
Clearwater Peat Harvesting Project
Caroline -
Sundance 7 Generating Station Project
Wabamun -
Edson Mainline Expansion Project
Rocky Mountain House -
Pigeon Lake Recreation Centre Water and Sewer Line Replacement Project
Pigeon Lake -
Paul First Nation Culvert Replacement Project
Paul First Nation -
Paul First Nation Gas Station Project
Paul First Nation -
Cascade Power Plant Project
Yellowhead County -
Paul First Nation 2-unit Housing Project
Paul First Nation -
Highway 947 Extension Project
Edson -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Parks Canada Agency Brazeau Lake Bridge Replacement
Jasper National Park of Canada -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation -
Pasa Tibi Village Elder's Living Facility
Alexis Nakota Sioux Nation -
Rapid Housing Initiative 3 - Hill Plain
Alexis Nakota Sioux Nation -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation -
Replacement of the Carvel Weather Radar
1529 Parkland Hwy, Carvel, Alberta, T0E 0H0 -
Xplornet Telecommunications Tower Project
Alberta Beach -
Alexander First Nation Campground Project
Alexander First Nation -
Ya Ha Tinda Ranch Solar Array
Banff National Park -
Waheeba Solar Energy Project
Alexis First Nation -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Remediation of a Royal Canadian Mounted Police Property in Stony Plain, Alberta
Town of Stony Plain -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
Storage Tank Decommissioning and Relocation at Multiple Locations - 3rd Canadian Division Support Base, Southern Alberta
Cormack Armoury - Red Deer -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
Construction and Rehabilitation to Existing Parking Lots, Parkade and Roadways at the Edmonton International Airport
Edmonton International Airport -
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Enoch Cree Nation Traditional Lands Development Project
Enoch Cree Nation -
GroHERE at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport (Alberta) -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
Shell Service Station at Edmonton International Airport
Edmonton International Airport -
Coalspur Vista Coal Underground Mine and Expansion Activities Project
10 kilometres east of Hinton -
RHI 20 Unit Subdivision
Enoch Cree Nation -
Montana First Nation Emergency Road Repairs
Montana First Nation -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Parking lot replacement at RCMP Detachment in Innisfail, Alberta
Innisfail -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
Enoch Cree Nation Housing Development Project
Enoch Cree Nation -
Samson Cree Nation 3 Mile Lagoon Drainage Improvements
Samson Cree Nation -
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Alexander Wastewater Treatment Plant
Alexander First Nation -
Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot
Banff National Park of Canada -
Wildfire Risk Reduction Project 2023-2026- FireSmart work at several facilities in the Lake Louise, Yoho, and Kootenay Field Unit
Banff National Park of Canada -
Alexander Public Works and Fire hall Building Project
Alexander First Nation -
Alexander First Nation: BF 77352 Replacement and Twp. Rd 562 Improvements
Alexander First Nation -
Moraine Power Generation Project
Whitecourt -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
Alexander First Nation Waste Transfer/Diversion Station Rehabilitation
Alexander First Nation -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Margaret Creek Fish Barrier Creation
Banff National Park -
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
PCA Clearwater Prescribe Burn
Banff National Park of Canada -
Trans Mountain Expansion Project
Edmonton -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Base Line Terminal Project
Edmonton -
Concept Design and Performance Specification for Edmonton Waveguide Bridge and Foundation Piers - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
Construct Transition Centre - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Construct Land Vehicle Crew Training System Facility- 3rd Canadian Division Support Base Edmonton
3 Canadian Division Support Base (CDSB) Edmonton -
Badger Lake Non-Native Trout Removal
Banff National Park -
1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Highway 947 Extension Project
-
Fortis Line Rebuild at Lake Louise Ski Area
Banff National Park -
Lake Louise Heliport
Kootenay/Yoho/Lake Louise National Parks -
Lake Louise Community Fire Guard
Banff National Park -
Lake Louise Inn Generator and Exit Stairs
Banff National Park -
Mountaineer Lodge Staff Accommodation - 221 Hector Road
Banff National Park -
Village of Lake Louise Utilities Selected System Upgrades
Banff National Park -
Fairmont Chateau Lake Louise Cooling Unit Installation
Banff National Park -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
Jacques Lake Realignment
Jasper National Park of Canada -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Ross Lake Fire Guard
Yoho National Park of Canada -
Chateau Lake Louise New Parking Lot Construction
Banff National Park of Canada -
Deer Lodge Redevelopment
Banff National Park -
Fairmont Chateau Lake Louise Pool Demolition
Banff National Park -
Trail 8c Realignment
Jasper National Park of Canada -
Chateau Lake Louise Pool Rebuild
Banff National Park -
Small-scale habitat enhancement for bears near Lake Louise, Alberta
Banff National Park -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Fortis Line Install at CP Mile 108
Banff National Park -
Trail 1a Jasper National Park
Jasper National Park -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
Emerald Canoes Dock Replacement
Yoho National Park of Canada -
Protection Mountain Fire Guard
Banff National Park -
Pine Bungalows Master Plan 2021
Jasper National Park -
Abbot Pass Hut National Historic Site Removal
Yoko National Park, Detailed Impact Assessment -
Parks Canada Agency Connaught East Waterway Restructure
Jasper National Park -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
Mt. Stephen Trail Reroute
Yoho National Park of Canada -
Wildfire Risk Reduction Maintenance Activities - Yoho, Kootenay, and Banff National Parks (2023-2034)
Yoho National Park of Canada -
New Fibre Installation
Cassimayooks (Mayook) 5, Tobacco Plains 2, Yoho National Park Of Canada - Site 5 -
Moraine Lake Lodge Duplex Cabins
Banff National Park -
Parks Canada Agency Snaring River Bridge Rehabilitation
Jasper National Park of Canada -
JTA - Hochimini Trail Realignment
Jasper National Park -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Stoney Morley Broadband Tower Installation (Tower 12)
Stoney Nakoda Nation -
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
Mannix Pit 10 Year Gravel Extraction and Reclamation Expansion
Banff National Park of Canada -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
PCA Castle Mountain Campground Utilities Upgrade
Banff National Park -
Town of Banff Affordable Housing Apartments, 338-342 Banff Avenue
Banff National Park -
Fortis Alberta 610013030 Castle Junction 551L Rebuild
Banff National Park of Canada -
BC Hydro Field Energy Storage Facility Temporary Generator
Yoko National Park -
Johnston Canyon Railing Extension
Banff National Park -
CP Rail Mountain Subdivision, Mile 3.8 Boulder Creek Bridge Rehab and Bedload Removal
Yoko National Park -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve, Morley, AB 6318 Forestry Trunk Road
Morley, AB 6318 Forestry Trunk Road -
Cascade Pit Gravel Crushing
Banff National Park -
PCA Forty Mile Prescribe Fire
Banff National Park -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve,
Morley, AB -
Parks Canada HWY 93S Boom Creek Culvert Replacement
Banff National Park -
Banff Air Strip Structure Removal
Banff National Park -
Moraine Lake Lodge Staff Accommodation
Banff National Park -
Fairholme II Prescribed Fire
Banff National Park -
FortisAlberta Cascade 177S Substation Maintenance
Banff National Park -
Town of Banff Water Withdrawal, Distribution and Treatment System
Banff National Park -
AltaLink 54L Transmission Rebuild
Banff National Park -
100 Falcon Street-New carpentry shop
Banff National Park -
ATCO Gas Installation of 5 Cathode Test Stations in the Town of Banff
Banff National Park -
Eagle Crescent Mountain View BBQ Housing
Banff National Park -
Town of Banff 36 Unit Apartment, 418-420 Cougar Street
Banff National Park of Canada -
Tunnel Mountain Campground Winter Use
Banff National Park -
Otter Hotel Development (Inns of Banff)
Banff National Park of Canada -
Town of Banff 435 Squirrel Street Shaw Cable
Banff National Park -
Addition of three residential units to the existing apartment housing
Banff National Park of Canada -
435 Squirrel Street CP Rail Transformer Installation
Banff National Park -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
ToB - Moose Street Sidewalk Upgrade
Banff National Park of Canada -
Town of Banff 425 Muskrat St New 8 Unit Residential Dwelling
Banff National Park -
Shaw Cable Installation at 327 Railway Ave
Banff National Park -
Kootenay National Park (KNP) Avalanche Mitigations, Whymper Remote Avalanche Control Systems (RACS)
Kootenay National Park -
Telus Roehampton CP Rail Yard Mobility
Banff National Park -
Banff Lodging Company-413 Beaver Street Redevelopment
Banff National Park -
Town of Banff 311 and 317 Squirrel Street Redevelopment
Banff National Park -
Banff Community High School Sidewalk Expansion
Banff National Park of Canada -
ToB 23DP45 Banff Community High School Exterior Renovations
Banff National Park of Canada -
Developing a backyard cabin into Bed and Breakfast
Banff National Park of Canada -
Town of Banff 347 Grizzly Street New Garage and Accessory Dwelling
Banff National Park -
ToB 23DP31 328 Muskrat Street Development
Banff National Park of Canada -
Town of Banff Atco gas valve replacements, Wolf Street
Banff National Park -
Town of Banff Bow River Bridge Old Pump Station Building Demolition
Banff National Park -
19DP86 - 220 Otter Street Demo and New Building
Banff National Park -
Town of Banff Bear Street Reconstruction
Banff National Park -
206 Otter Street Single Detached Dwelling Residential Addition
Banff National Park -
Bow Valley Credit Union- New Mixed Use Building Construction, 212 Banff Ave. Town of Banff
Banff National Park -
Shaw Cable Conduit Installation in Town of Banff
Banff National Park of Canada -
Town of Banff 135 Lynx Street New Accessory Dwelling
Banff National Park -
Fortis Transformer Replacement
Banff National Park -
Town of Banff, New Family home construction, 129 Kootenay Ave
Banff National Park -
514 Buffalo Street, Crandell Peck Cabin Addition, Studio North
Banff National Park of Canada -
Town of Banff Atco gas valve replacement
Banff National Park -
Town of Banff Recreation Grounds Redevelopment and New Pedestrian Bridge
Banff National Park -
Town of Banff Bow River Sewer Siphon Liner Installation and In-Water Riffle Construction
Banff National Park -
Town of Banff Bow River Bridge 2023 Rehabilitation Works
Banff National Park of Canada -
ATCO Town of Banff Compressed Natural Gas Connection
Banff National Park -
Town of Banff Jasper Way to Cave Ave Commuter Trail
Banff National Park -
115 Spray Avenue Garage with Suite
Banff National Park -
Town of Banff - Construction of Single Detached Home with Accessory Dwelling, 119 Spray Avenue
Banff National Park -
Stoney Phase 17 Housing Project
Wesley First Nation -
Stoney Morley Rapid Housing Project
Morley -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Yoho Administration Building Parking Lot Expansion
Yoho National Park -
Banff Trail Riders-3 Mile BBQ Redevelopment
Banff National Park -
FortisAlberta Sunshine Cable Replacement - Phase 2
Banff National Park -
CCI Wireless o/a Corridor Communications Inc. Radiocommunication Antenna Addition on the Stony No. 142-143-144 Reserve, Morley, AB
Morley, Eagle Hill Rd -
Redwater Facility Rail Yard Project
Near Redwater -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Pursuit Night Rise Program
Banff National Park of Canada -
Stoney Nakoda Nation Broadband Tower installation - Tower 14 Project
Stoney Nakoda Nation -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve,
Ozada, AB -
Stoney Phase 18 Housing Project
Wesley First Nation -
Stoney Nation Continuing Care Facility
Stoney Nakoda First Nation -
Stoney North Morley Sanitary Servicing
Stoney First Nation -
Wesley First Nation Solar Panels Project
Morley and Bighorn -
Chiniki First Nation - Rapid Housing 3
Chiniki First Nation -
Culvert Replacement with Larger Diameter
Elk Island National Park -
CCI Wireless o/a Corridor Communications Inc. Radiocommunication Antenna Addition on the Stony No. 142-143-144 Reserve, Morley, AB
Morley AB, 133X -
CCI Wireless o/a Corridor Communications Inc. Radiocommunication Antenna Addition on the Stony No. 142-143-144 Reserve, Morley, AB
Morley AB, 133X -
Highway 93S km 20 Bank Stabilization
Kootenay National Park -
CCI Wireless o/a Corridor Communications Inc. Radiocommunication Antenna Addition on the Stony No. 142-143-144 Reserve, Morley, AB
Morley AB, Stoney 142 -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Stoney Phase 18 Housing Project
Chiniki First Nation -
Parks Canada Meadow Restoration Prescribe Fire Plan
Banff National Park -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve,
Seebe, AB -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Parks Canada National Fire Cache Facility Construction
Banff National Park of Canada -
Canalta 530 Banff Ave Redevelopment
Banff National Park -
Sunshine Village Ski Area - Parking Lot Reconfiguration and Improvements
Banff National Park -
FortisAlberta Pole Replacement - Town of Banff (610013803)
Banff National Park -
Stoney Nakoda Broadband Tower installation - Repeater Towers
Stoney Nakoda Nation -
Sunshine Village Ski Resort Bourgeau Parking Lot Parkade
Banff National Park -
Sunshine Village West End Parking Reconfiguration
Banff National Park of Canada -
Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve,
Cochrane, AB -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Stoney Nakoda Tri Services Project
Stoney Nakoda Nation -
Enbridge Northern Gateway Project
Bruderheim -
ATCO Gas Cascade Mall Banff
Banff National Park -
ToB 22DP57 216-218 Muskrat Street Redevelopment
Banff National Park of Canada -
Town of Banff 222 Otter Street Redevelopment
Banff National Park -
Town of Banff 217 Otter Street Redevelopment
Banff National Park of Canada -
Town of Banff 220 Otter Street-Duplex with Accessory Dwelling
Banff National Park of Canada -
Town of Banff 525 Buffalo Street Development
Banff National Park -
Private owner build, new duplex within the Town of Banff
Banff National Park -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Sunshine Village Ski Resort Ski Out Widening Tree Removals
Banff National Park of Canada -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
PCA Backcountry Shelter Redevelopment-Bryant and Egypt
Banff National Park -
Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
Jasper National Park -
Sunshine Village Ski Resort Ski Out Widening Tree Removal 2023
Banff National Park of Canada -
Sunshine Village Ski Resort Long Range Plan
Detailed Impact Assessment, Banff National Park -
Wesley Band Goodstoney Meadows Development
Morley, AB -
Sunshine Village Ski Resort Angel Chairlift Replacement
Banff National Park of Canada -
JCLS Church Shaw Cable installation
Banff National Park -
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
Astotin Lake Dock Replacement
Elk Island National Park