Creosote Pile Removal and Disposal - Extension PER No. 19-022-01
The Proposed Project Amendment
Tsleil-Waututh Nation on behalf of Vancouver Fraser Port Authority Environmental Programs proposes to remove abandoned creosote piles, dock debris and a derelict crane along Indian Arm. The Project consists of removing 159 piles, 3 docks, 1 crane and other debris fragments at various locations in Indian River Estuary, Iron Bay, Buntzen Bay, Farrer Cove, and Granite Falls. Works will be completed by spud barge and piles will be removed by vibratory hammer and chain. Piles in Indian River Estuary and Buntzen Bay will be removed at high tide to prevent barge grounding. Some piles in Indian River Estuary may be cut at mudline at low tide, due to the deteriorated natures of the piles. Removed creosote piles and other collected debris will be transported by barge and disposed of at an appropriate waste facility.
The Project was approved prior to the coming into force of the Impact Assessment Act and was not previously posted on the registry. The permit is currently valid until March 31, 2021. Due to COVID-19, equipment and operator time were not available to complete the project prior to permit expiry. An extension until February 28, 2022 is being requested. Work would take place during the least risk window for fish and fish habitat, between August 16, 2021 and February 28, 2022.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Indian Arm, B.C. – February 9, 2021 – The Vancouver Fraser Port Authority has determined that the proposed Creosote Pile Removal and Disposal – Extension PER No. 19-022-01 located at Indian Arm is not likely to cause significant adverse environmental effects.
List all records
Contacts
Project and Environmental ReviewVancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com
-
Location
- Creosote Pile Removal and Disposal - Extension PER No. 19-022-01 (British Columbia)
-
Project Type
- Ports and Harbours
- Remediation and conservation
-
Status
Completed -
Start Date
2021-01-06 -
Proponent
Port Authority Environmental Programs -
Authorities
- Vancouver Fraser Port Authority
-
Assessment Type
Project on federal lands -
Reference Number
81268
Nearby projects
..within 200 kilometres-
New Float Installation for 2250 Farrer Cove Place
Public Notice New Float Installation for 2250 Farrer Cove Place -
Installation of non-hydraulic boat lift
Installation of non-hydraulic boat lift -
District of North Vancouver Designated Anchorage Area
District of North Vancouver Designated Anchorage Area -
New Pile Installation for Recreational Dock
New Pile Installation for Recreational Dock -
Existing Dock Upgrade for 4659 Strathcona
Existing Dock Upgrade for 4659 Strathcona -
Pacific Coast Terminals Co. Ltd. Port Moody Channel Dredging Permit Amendment Request
Pacific Coast Terminals Co. Ltd. Port Moody Channel Dredging Permit Amendment Request -
Removal of Concrete Boat Launch
Removal of concrete boat launch -
Amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107)
Amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107) -
Rocky Point Park Boat Ramp Repair in Port Moody
Rocky Point Boat Ramp Repair in Port Moody -
Cates Park Foreshore Erosion Protection Project
North Vancouver -
Shellburn Berthing Dolphin Replacement
Burnaby -
Barge Ramp Beam Installation
Burnaby -
Installation of Eight Steel Pipe Piles - Project Permit No. 18-184 - Extension to the Expiry Date
Burnaby -
Chemtrade maintenance dredging
Chemtrade maintenance dredging -
Water Supply Tunnel at Second Narrows - Metro Vancouver - Amendment
Water Supply Tunnel at Second Narrows - Metro Vancouver - Amendment -
Site Upgrades and Road Realignment - Lynnterm - Project Permit No. 17-154-2 - Extension to the Expiry Date
Site Upgrades and Road Realignment - Lynnterm - Project Permit No. 17-154-2 - Extension to the Expiry Date -
Rail Expansion with Tent
Rail Expansion with Tent -
Installation of Annex 4 Vacuum System
Installation of Annex 4 Vacuum System -
G3 Terminal Vancouver - G3 Limited - Project Permit No. 15-180 - Extension to the Expiry Date and Extended Work Hours
G3 Terminal Vancouver - G3 Limited - Project Permit No. 15-180 - Extension to the Expiry Date and Extended Work Hours -
G3 Terminal Vancouver Berth Pocket Obstruction Removals
G3 Terminal -
Water Supply Pipe and Casing - Neptune
Water Supply Pipe and Casing - Neptune -
Dust Suppression Upgrade - Neptune Bulk Terminals (Canada) Ltd. - Project Permit 16-072 - Extension to the Expiry Date
Dust Suppression Upgrade - Neptune Bulk Terminals (Canada) Ltd. - Project Permit 16-072 - Extension to the Expiry Date -
Neptune Cargill Overpass Extension - Project Permit No. 17-131-1 - Amendment (Condition 17 - Extended Hours)
North Vancouver -
Neptune - Rail Bypass Track Layout
Neptune - Rail Bypass Track Layout -
Neptune Terminal maintenance dredging at Berth 2 and 3
Neptune Terminal maintenance dredging at Berth 2 and 3 -
Extension to expiry date of Project Permit No. 18-027: Dredging to deepen berth 1 at Neptune Bulk Terminals
Extension to expiry date of Project Permit No. 18-027: Dredging to deepen berth 1 at Neptune Bulk Terminals -
Dredging to Deepen Berth 1 - Project Permit No. 18-027-1 - Amendment (Condition 23 - Extended Hours)
North Vancouver -
Neptune Coal Capacity Project and West Quadrant Shiploader - Project Permit No. 12-066-1 - Amendment (Condition 18 - Extended Hours)
North Vancouver -
Oil Spill Emergency Response Base - Project Permit No. 16-290 - Extension to the Expiry Date
Vancouver -
Cascadia West Rail Extension
Vancouver -
South Shore Corridor Project - Extension to Expiry Date
South Shore Corridor Project - Extension to Expiry Date -
Columbia Containers Shoreline Protection Repair
Columbia Containers Shoreline Protection Repair -
Mariner Seafoods Shoreline Protection
Mariner Seafoods Shoreline Protection -
Fraser Mills Foreshore Improvements
Fraser Mills Foreshore Improvements -
Extension - Temporary Construction Staging Parking and Barge Loading
Extension - Temporary Construction Staging Parking and Barge Loading -
Marine Operations Facility
Marine Operations Facility -
Fraser Mills Pile Removal
Fraser Mills Pile Removal -
Osprey Nest Platform
Osprey Nest Platform -
Retaining wall replacement
Retaining wall replacement -
Barge Loading Facility
Barge loading facility -
Pacific Terminals Emergency Vehicle Road Access
Pacific Terminals Emergency Vehicle Road Access -
Pacific Terminals Annex 1 and 2 Vacuum System Upgrade
Pacific Terminals Annex 1 and 2 Vacuum System Upgrade -
Global Container Terminal Vanterm Maintenance Dredging
Vancouver -
Kings Mill Park Shoreline and Habitat Work
Kings Mill Park Shoreline and Habitat Work -
Shoreline protection and retaining wall improvements project
Shoreline protection and retaining wall improvements project -
Georgia Pacific Gypsum Plant Demolition
Georgia Pacific Gypsum Plant Demolition -
Seaspan Ship Load-out Gravel Bed and Shoreline Protection
North Vancouver -
Subtidal Cobble Replacement
North Vancouver -
Schnitzer Steel Maintenance Dredging
Schnitzer Steel Maintenance Dredging -
Seaspan Outfitting Pier Extension
Seaspan Outfitting Pier Extension -
Schnitzer Fire Suppression Project - Design Amendment
Schnitzer Fire Suppression Project - Design Amendment -
Lehigh Materials - Surrey Barge Ramp Project
Lehigh Materials - Surrey Barge Ramp Project -
Pacific Elevators New Dust Control System and Access
Pacific Elevators New Dust Control System and Access -
Fibreco Terminal Enhancement Project Amendment (Stormwater Design)
North Vancouver -
Amix Pile and Float Removal
Amix Pile and Float Removal -
CN rail bridge seismic retrofit project
CN rail bridge seismic retrofit project -
Maintenance dredging - Centerm
Maintenance dredging - Centerm -
Amendment to dates - Centerm Expansion Project Fisheries Act Authorization
Vancouver -
Centerm Expansion Project - Amendment to Fisheries Act Authorization
Vancouver -
New Microwave system and antenna proposal at 1959 Marine Dr. North Vancouver, BC
1959 Marine Drive North Vancouver BC -
Centerm Expansion Project - Amendment PER No. 15-012-03 (Condition 47 - Extended Hours)
Centerm Expansion Project - Amendment PER No. 15-012-03 (Condition 47 - Extended Hours) -
Trans Mountain Expansion Project
Burnaby -
Metro Vancouver - Conveyance for North Vancouver Wastewater Treatment Plant Amendment
Metro Vancouver - Conveyance for North Vancouver Wastewater Treatment Plant Amendment -
Olsen Road site development for truck staging
Olsen Road site development for truck staging -
Centerm Expansion Project - Amendment (Condition 66 - Dredging)
Centerm Expansion Project - Amendment (Condition 66 - Dredging) -
Seabin Installation at Main Street Dock
Vancouver, British Columbia -
Expansion of the Lumber Transload Facility of Goodrich Terminal2012 Ltd. at the Port of Vancouver
Port of Vancoouver -
Demolition of Office Building and Parking Canopies
Demolition of Office Building and Parking Canopies -
Installation of scour protection
Installation of scour protection -
Nanaimo Vancouver Passenger Only Ferry Service - South SeaBus Terminal - Project Permit No. 18-044-02 - Extension to the Expiry Date
Nanaimo Vancouver Passenger Only Ferry Service - South SeaBus Terminal - Project Permit No. 18-044-02 - Extension to the Expiry Date -
SeaBus Terminal Upgrades (Utilities)
SeaBus Terminal Upgrades (Utilities) -
Flood Barrier
Vancouver -
Conveyance for North Shore Wastewater Treatment Plant - Project Permit No. 17-090-1 - Amendment (Condition 51 - Extended Hours)
North Vancouver -
Halo Sawmill Maintenance Dredging
Halo Sawmill Maintenance Dredging -
Maintenance Dredging at FRPD Waterlot
Maintenance Dredging at FRPD Waterlot -
Shoreline Protection at 177 Duncan Street in New Westminster
Shoreline Protection at 177 Duncan Street in New Westminster -
Amendment to the construction hours and permit expiry date for the approved Sediment Remediation and Dike Construction
Amendment to the construction hours and permit expiry date for the approved Sediment Remediation and Dike Construction -
Royal Vancouver Yacht Club (RVYC) Coal Harbour Marina Expansion
Royal Vancouver Yacht Club (RVYC) Coal Harbour Marina Expansion -
Installation of Pole Lights
100 Annacis Parkway, Annacis Island, Delta -
Containerized dry bulk handling project
Containerized dry bulk handling project -
Annacis Water Supply Tunnel Safe Havens Amendment
Annacis Water Supply Tunnel Safe Havens Amendment -
Annacis Water Supply Tunnel Safe Havens Amendment
Annacis Water Supply Tunnel Safe Havens Amendment -
Surrey Langley SkyTrain Project and Broadway Subway Project
Surrey -
WWL Underground Storage Tank Removal Annacis Island
Delta -
Queensgate Maintenance Dredging
Queensgate Maintenance Dredging -
Fire Hydrant Replacement
Surrey Taxation Data Centre -
Fraser Grain Terminal - Grain Export Facility - Amendment 06 - Grain Cleaner
Fraser Grain Terminal - Grain Export Facility - Amendment 06 - Grain Cleaner -
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-05 - Amendment (Condition 36 - Extended Hours)
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-05 - Amendment (Condition 36 - Extended Hours) -
Kitsilano CCG SAR - Workshop Reconstruction
Kitsilano CCG SAR -
Teal-Jones Maintenance Dredging
Teal-Jones Maintenance Dredging -
Katzie First Nation Shoreline Clean Up
Pitt Meadows -
Stormwater outfall and dike upgrades
Stormwater outfall and dike upgrades -
Annacis Island Wastewater Treatment Plant New Outfall - Project Permit No. 17-093-1 - Amendment (Condition 32 - Extended Hours)
Delta -
Langley Outfall Maintenance Dredging
Langley Outfall Maintenance Dredging -
Burnco Langley Maintenance Dredging Project
Burnco Langley Maintenance Dredging Project -
Delta Cedar New Pile Installation
Delta -
Truck Parking Construction - Nordel Way Area
Truck Parking Construction - Nordel Way Area -
Canadian Coast Guard Purfleet Point Front and Rear Range Rebuild
Lower Fraser River of the Vancouver Regional District, New Westminster, Annacis Island, British Columbia -
Canadian Coast Guard Purfleet Point Front and Rear Range Rebuild
Lower Fraser River of the Vancouver Regional District, New Westminster, Annacis Island, British Columbia -
Vito Dock Maintenance Dredging
Delta -
Vito Shipyards Wharf Repairs
Delta -
Vito Shipyards Wharf Repairs amendment
Vito Shipyards Wharf Repairs amendment -
Golden Ears Forcemain (GDEFM) Project
Golden Ears Forcemain Project -
City of Delta Stormwater Outfall
City of Delta Stormwater Outfall -
Pacific Enterprise Science Centre (PESC) Foreshore Maintenance
Pacific Enterprise Science Centre (PESC) -
Concrete Batch Plant
Vancouver -
Fraser River Pile and Dredge No. 8 Road Barge Ramp Maintenance Dredging
Richmond -
Delta Grinding Facility Project
Tilbury Island, Delta -
Construct Maintenance Building and Military Vehicle Parking at Richmond Armoury
Richmond Armoury, 5500 #4 Road, Richmond -
Fenceline Construction and Maintenance at Richmond Training Area
Colonel Sherman Armoury and Richmond Training Area -
Tilbury Phase 2 LNG Expansion Project
Tilbury Island, Delta -
Amendment to the construction hours in respect to condition 18 of the approved Area IV Site Preparation (PER No. 17-080)
Amendment to the construction hours in respect to condition 18 of the approved Area IV Site Preparation (PER No. 17-080) -
WesPac Tilbury Marine Jetty Project
Tilbury Island, Delta -
Maintenance Dredging, Fraser River, Small Craft Harbours
Kanaka Landing -
Vancouver Airport Fuel Delivery Project
Richmond -
Riparian Habitat Enhancement - Russ Baker Way Lands
Riparian Habitat Enhancement - Russ Baker Way Lands -
Maintenance Dredging, Fraser River, Small Craft Harbours
McMillan Island Harbour -
Surrey Langley SkyTrain Project and Broadway Subway Project
Langley -
Maintenance Dredging, Fraser River, Small Craft Harbours
McIvors Landing -
Steveston Paramount Maintenance Dredging
Steveston Paramount Small Craft Harbour -
Maintenance Dredging, Fraser River, Small Craft Harbours
Whonnock Harbour -
Drainage Maintenance and Improvement Project - Alaksen National Wildlife Area
Alaksen National Wildlife Area -
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-04 - Amendment (Condition 36 - Extended Hours)
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-04 - Amendment (Condition 36 - Extended Hours) -
Woodfibre LNG Project
Howe Sound -
BURNCO Aggregate Mine Project
Howe Sound -
GCT Deltaport Expansion - Berth Four Project
Delta -
Roberts Bank Terminal 2 Project
Delta -
Westshore Terminals Berth 2 Mooring Dolphin Upgrades
Delta -
Gibsons Small Craft Harbour Wharf Reconstruction
Gibsons Landing Small Craft Harbour -
Replacement of the Aldergrove Weather Radar
26600 8th Avenue, Langley, BC V0X 1A0 -
Maintenance Dredging, Fraser River, Small Craft Harbours
Mission Harbour -
Telus Communications Inc. Radiocommunication Antenna Addition on Sechelt Band Lands No 2 Reserve, Sechelt BC
5411 Reservoir Road Sechelt BC, Sunshine Coast area on the Sechelt Band Lands No 2 Reserve -
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities)
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities) -
Sumas IR6 Former Brick Plan Demolition and Remediation
Sumas First Nation Indian Reserve 6 -
Porpoise Bay Harbour Boat Grid Removal
Porpoise Bay Harbour -
Winter Cove Boat Ramp Repair, Saturna Island
Gulf Islands National Park Reserve -
Nav Canada surveillance radar - Gulf Islands National Park Reserve, Saturna Island, BC
Saturna Island, BC - Gulf Islands National Park Reserve of Canada -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
SAY Community Centre
Skowkale No. 10 Reserve Land -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Radio Tower Upgrades, North Pender Island
Gulf Islands National Park Reserve -
Freedom Mobile Installation on Radio Tower Site, North Pender Island
Gulf Islands National Park Reserve -
WildFire Risk Reduction Project - fuels managment at three sites in Gulf Islands National Park Reserve
Gulf Islands National Park Reserve -
Bivouac Site, OPSEE Training Area
OPSEE Training Area, Vance road, Cultus Lake -
GRT Holdings Ltd. Construction and Operation of Soil Treatment Facility -DUKE POINT
Nanaimo -
WCMRC Oil Spill Response Facility at Nanaimo Harbour
Nanaimo -
WCMRC Oil Spill Response Facility at Nanaimo Harbour
Nanaimo -
Nanaimo to Protection Island Submarine Cable Replacement Project
Nanaimo -
Exterior Landscape Redesign
60 Front Street Nanaimo -
Seabird Island Cultural Education, Community Resource Centre and Long-House Project
Agassiz, British Columbia -
Site preparation for a subdivision on Popkum IR 2
Popkum IR2 -
Campground Kiosk Install
Gulf Islands National Park Reserve -
Install Security Cameras at Winchelsea Island
Winchelsea Island, which is part of the Canadian Forces Maritime Experimental Test Ranges (CFMETR), in Nanoose Bay -
Sidney Spit Buoy Upgrades
Gulf Islands National Park Reserve -
Establishing Shrubs in Protective Fenced Areas to Facilitate Forest Restoration on Sidney Island
Gulf Islands National Park Reserve -
Control of English Hawthorn on Sidney Island
Gulf Islands National Park Reserve -
Shxw'owhámél First Nation Outdoor Recreation Infrastructure Project
Shxw'owhámél First Nation -
Institute of Ocean Sciences Patricia Bay - Wharf Waterline Replacement
The Institute of Ocean Sciences is located in Sidney BC. The site lies on the eastern shore of the Saanich Inlet which runs out into Haro Strait. -
Institute of Ocean Sciences Patricia Bay - Wharf refurbishment
The Institute of Ocean Sciences is located in Sidney BC, on Vancouver Island. The facility is accessible via road access, as well as by water. The site lies on the eastern shore of the Saanich Inlet which runs out into Haro Strait. -
Institute of Ocean Sciences Patricia Bay - Miscellaneous Repairs 2020
The Institute of Ocean Sciences is located in Sidney BC. The facility is accessible via road access, as well as by water for vessel/barge access. The site lies on the eastern shore of the Saanich Inlet which runs out into Haro Strait. -
Construction of a Distribution Warehouse
Victoria International Airport -
Blue Heron Aeropark Construction of Aircraft Hangars
Victoria International Airport YYJ -
Western Canadian Marine Response Corporation (WCMRC) Saanich Base
Victoria International Airport (YYJ) -
Titan Boats Construction of a Boat Manufacturing Facility
Victoria International Airport (YYJ) -
Temporary Installation of Remotely Piloted Aircraft System (RPAS) Detection Equipment
Victoria International Airport -
Modification of Existing Petroleum Storage Facility
Victoria International Airport -
Pauquachin Legacy Gathering Space
Cole Bay No. 3 Reserve (Pauquachin First Nation), North Saanich BC -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
Construction of a Boat Storage Facility at Colwood, CFB Esquimalt
CFB Esquimalt's Colwood property, located in the municipality of Colwood. -
Replacement and Installation of New Base Security Cameras - Colwood and Naden, Canadian Forces Base (CFB) Esquimalt
CFB Esquimalt Colwood property, located in Victoria -
Pedestrian Walkway Extension Lot B1
Esquimalt Graving Dock -
EastEnd Dock Extension-Dock Floor/Wall Refurbishment
Esquimalt Graving Dock -
Replacement and Installation of New Base Security Cameras - Colwood and Naden, Canadian Forces Base (CFB) Esquimalt
CFB Esquimalt Naden property, located in Victoria -
G Jetty and Jetty 11 Remediation in Esquimalt Harbour
Colwood, Esquimalt Harbour, located in the municipality of Colwood British Columbia -
Colwood Fuel Oil Depot - Air Scrubber
Colwood Fuel Oil Depot, Rosebank Road, Colwood -
Victoria Coast Guard Base - Timber Fender Replacement
This project is located on the wharf at the Victoria Coast Guard Base, 25 Huron Street, Victoria, BC. The base is accessible via road access, as well as by water for vessel and barge access. -
Drydock Leak Repairs at HMC Dockyard, Canadian Forces Base Esquimalt
Her Majesty's Canadian Dockyard, Esquimalt Harbour -
Canadian Coast Guard Victoria Base Wharf Refurbishment
The Victoria Coast Guard Base in James Bay, Victoria, British Columbia. The base is situated 2km from downtown Victoria, and lies on the edge of the Victoria's inner harbour, which eventually funnels out into the Strait of Juan de Fuca. -
Canadian Coast Guard Victoria Search and Rescue Float
25 Huron Street, Victoria BC, V8V 4V9 -
Royal Roads University - Japanese Gardens Drainage Upgrades
Royal Roads University, 2005 Sooke Road, Colwood -
Royal Roads University Sustainability Initiative - Overhead Service Upgrades (Lower Campus)
Royal Roads University in Colwood -
Royal Roads University Recreation Centre Change Room Renovation Project
Royal Roads University campus, in the municipality of Colwood, British Columbia -
CREST - Microwave dish and VHF antenna - Mary Hill and Albert Head Road, Metchosin British Columbia
Albert Head Road, Metchosin -
CREST - Microwave dish and VHF antenna - Mary Hill and Albert Head Road, Metchosin British Columbia
Mary Hill - 5300 William Head Road, Metchosin -
Canadian Forces Ammunition Depot (CFAD) Rocky Point Main Gates Recapitalization
CFAD Rocky Point, located in the municipality of Metchosin, BC. -
Connect Municipal Water Supply to Canadian Forces Ammunition Depot (CFAD) Rocky Point
Canadian Forces Ammunition Depot (CFAD) Rocky Point , Metchosin -
City of Powell River - Consolidated Waste Water Treatment Project
Powell River -
N'Quatqua Multi-Use Facility Project
N'Quatqua Multi-Use Facility Project -
TOPAZ Submarine fibre-optic cable
Port Alberni -
Raven Underground Coal Mine Project
Buckley Bay -
Canadian Coast Guard - Cape Lazo BC - Oceans Protection Plan - Marine Safety System Modernization Initiative
Cape Lazo -
Kingsvale-Oliver Reinforcement Project
Kingsvale -
Kwispaa LNG Project
10 kilometres northeast of Bamfield -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
Contaminated Site Remediation: Grice Bay and McLean Point
Pacific Rim National Park Reserve -
Canadian Coast Guard Seymour Narrows Radar Site and Power Line
1km South from Browns Bay and 15km North of Campbell River, British Columbia