Trans Mountain Pipeline Fiddle River Hazard Remediation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
This project entails a combination of two undertakings, including constructing a berm on and from the deposited gravels in the old gravel pit and armouring the 24-inch pipeline right-of-way at the overflow. In order to construct the berm, the flow of water entering the old gravel pit will be diverted into the adjacent active channel of the Fiddle River. Two rows of gravel filled mega bags will be placed via helicopter in the channel presently flowing in the old gravel pit. Armouring of the pipeline right-of-way may entail dewatering of the right-of-way area. If overflow is still occurring in the work area at the time of construction, a dam will be used to restrict flow into the work area and water will be pumped around the site. A fish salvage will be undertaken from the local pool of water at the right-of-way. Access for the construction of the berm will be downstream of the Highway 16 bridge on the Fiddle River and west towards the northeast to the gravel pit along the old access to the pit. Access to the work area for armouring of the pipeline will be via the existing right-of-of way from the west.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New project being assessed by Parks Canada and Fisheries and Oceans Canada - Public comments invited from 21 December 2020 to 20 January 2021 | - | December 21, 2020 |
Contacts
Jasper National ParkBox 10
Jasper, Alberta T0E 1E0
Telephone: 780-852-6141
Email: evaluationdimpactjasper-jasperimpactassessment@pc.gc.ca
-
Location
- Jasper National Park (Alberta)
-
Nature of Activity
- Remediation and conservation
-
Assessment Status
In progress -
Start Date
2020-12-21 -
Proponent
Parks Canada -
Authorities
- Fisheries and Oceans Canada
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
81251
Nearby assessments
...within 200 kilometres-
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Coalspur Vista Coal Underground Mine and Expansion Activities Project
10 kilometres east of Hinton -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
Edson -
Robb Trend Coal Mine Expansion Project
Robb -
Parks Canada Agency Snaring River Bridge Rehabilitation
Jasper National Park of Canada -
Trail 8c Realignment
Jasper National Park of Canada -
Jacques Lake Realignment
Jasper National Park of Canada -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
JTA - Hochimini Trail Realignment
Jasper National Park -
Parks Canada Agency Connaught East Waterway Restructure
Jasper National Park -
Pine Bungalows Master Plan 2021
Jasper National Park -
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
Trail 1a Jasper National Park
Jasper National Park -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
Highway 947 Extension Project
-
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
Jasper National Park -
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
Summit Mine 14 Project
Grande Cache -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Edson Mainline Expansion Project
Drayton Valley -
Parks Canada Agency Brazeau Lake Bridge Replacement
Jasper National Park of Canada -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Moraine Power Generation Project
Whitecourt -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
Edson Mainline Expansion Project
Drayton Valley -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
Big Horn Fire Hall
Big Horn Reserve -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
Prairie Lights Power Project
Greenview -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
Sunchild 202 Reserve oil and gas development
Sunchild Reserve 202 -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Sunchild Gas Distribution Line
Sunchild -
O'Chiese Indian Reserve Pipeline
Sunchild Indian Reserve -
O'Chiese First Nation
O'Chiese First Nation -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
Sunchild First Nation Lagoon and Residential Access Road Project
Sunchild First Nation -
Sunchild First Nation Subdivision Planning
Sunchild First Nation -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202 -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Sundance 7 Generating Station Project
Wabamun -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation