Indoor Riding Arena

Project summary: Build an indoor riding arena to allow for year-round horse riding.

How is NCC or NCC land involved:  NCC tenant to build and pay for the building.

NCC's role: Arena to be constructed on NCC land by a tenant.

Impacts to land or neighbours: The proposed project will not significantly change the appearance of the surrounding area, as the site is shielded by trees and cannot be seen clearly from the road. The design of the arena is consistent with the look and feel of other buildings on site. It will help rejuvenate the property, enhancing the facility for clients and neighbours.

No tree removal is required. The location is an open area that is currently a horse paddock. There will be no impact to the surrounding land. The land consists of open field and pasture grass. In order to build the arena, three inches of topsoil will need to be removed.

The extent of the work will be minimal.  During construction there will be trucks, and a crane coming onto the property during regular weekday business hours.  All materials will be tarped to ensure there is no nesting.

Purpose of project: The tenant is restoring the oldest equestrian centre in the Ottawa area to its former glory so that it can continue to be a long-standing centre for generations to come. A horse farm cannot run year-round with the Ottawa climate without a proper indoor space to operate.

Timeline: Begin March 22, completion July 30


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

October 29th, 2020. The National Capital Commission must determine, as lead authority, whether the proposed project is likely to cause significant adverse environmental effects. 

To help inform this decision, the National Capital Commission is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice

Written comments must be submitted by November 29th, 2020, referencing project name and registry number..

Key documents

Key documents
Document Number Document Title File Date
1 Public Participation - Indoor Riding Arena - October 29, 2020

List all records

Contacts

National Capital Commission
Environmental Assessment
40 Elgin Street
Ottawa, ON K1P 5A8
Email: IA-EI@ncc-ccn.ca


  • Location

    • Ottawa (Ontario)
  • Project Type

    • Building and Property Development
  • Status

    In progress
  • Start Date

    2020-10-29
  • Proponent

    National Capital Commission - Real Estate Development
  • Authorities

    • National Capital Commission
  • Assessment Type

    Project on federal lands
  • Reference Number

    81107