GCT Deltaport Expansion - Berth Four Project

GCT Canada Limited Partnership is proposing to expand its existing GCT Deltaport Container Terminal, a container storage and handling facility located in Delta, British Columbia, approximately 35 kilometres south of Vancouver. As proposed, the GCT Deltaport Expansion - Berth Four Project would add a fourth berth on the east side of the Roberts Bank Causeway, include an expansion of the intermodal rail yard along the causeway (Roberts Bank Way) and dredging to provide safe access for ships. The additional land-based container storage and handling facilities would provide an additional two million 20-foot long storage containers (otherwise referred to as 20-foot equivalent units or TEUs) per year at the existing terminal.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

July 20, 2023 — On July 18, 2023, the Impact Assessment Agency of Canada extended the three-year time limit for GCT Canada Limited Partnership to provide the information or studies required for the project’s impact assessment that are set out in the notice of commencement.

Participate

Key documents

Key documents
Document Number Document Title File Date
292 From the Impact Assessment Agency of Canada to GCT Canada Limited Partnership re: Notice of Time Limit Extension PDF (48 KB) July 18, 2023
235 GCT Deltaport Expansion - Berth Four Project - Public Comment Period and Information Sessions - February 28, 2023
234 Draft Review Panel Terms of Reference PDF (429 KB) February 28, 2023
233 Draft Canada-British Columbia Cooperation Agreement on the coordination of the environmental and impact assessment process for the GCT Deltaport Expansion - Berth Four Project PDF (1.1 MB) February 28, 2023
232 Comment Template DOCX (38 KB) February 28, 2023
210 Notice of Commencement of an Impact Assessment - May 31, 2022
209 Joint Permitting and Regulatory Coordination Plan PDF (763 KB) May 31, 2022
208 Joint Indigenous Engagement and Partnership Plan PDF (5.2 MB) May 31, 2022
207 Joint Assessment Plan PDF (608 KB) May 31, 2022
206 Joint Guidelines (Updated September 1, 2022) PDF (2.5 MB) May 31, 2022
76 Notice of Referral to Review Panel - November 3, 2021
72 Notice of Impact Assessment Decision with Reasons - October 28, 2021
70 Detailed Project Description (see reference #201) PDF (17 MB) October 28, 2021
61 Joint Summary of Issues and Engagement PDF (728 KB) December 23, 2020
1 Initial Project Description of a Designated Project PDF (9.8 MB) September 18, 2020

Contacts

GCT Deltaport Expansion - Berth Four Project
Impact Assessment Agency of Canada
160 Elgin Street
22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 343-572-7144
Email: deltaport@iaac-aeic.gc.ca


  • Location

    • Delta (British Columbia)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    In progress
  • Start Date

    2020-09-28
  • Proponent

    GCT Canada Limited Partnership
  • Authorities

    • Impact Assessment Agency of Canada
  • Assessment Type

    Impact assessment by Review Panel
  • Reference Number

    81010

Nearby assessments

...within 200 kilometres
Date modified: