The Proposed Project

Vancouver Fraser Port Authority Infrastructure Delivery is proposing to carry out physical activities related to the approved Project Permit No. 2011-125-5: South Shore Corridor Project 24 hours a day, 7 days a week from January 4 and to July 4, 2021.  

This amendment is being requested to enable construction during low traffic volumes to minimize traffic disruptions on Commissioner Street. The project components associated with this request include overhead and underground plant decommissioning and infrastructure installations, including the construction of extensive below ground utility services, such as water mains, sewer mains and roadway drainage. Electrical work, the installation of retaining walls and the placing of an asphalt pavement is also required.  

The construction will primarily take place on the eastern half of the project location in the Commissioner Street corridor, north of the Canadian Pacific Rail tracks, between Slocan Street and Renfrew Street. Construction activities outside of regular hours would involve heavy machinery such as track excavators, rubber-tired backhoes, dump trucks and compaction equipment. Asphalt pavement saw cutting and hydro-vacing will also be required. 

Shrouding is proposed to be implemented in the use of stationary equipment. Broadband backup alarm will be applied if warranted. Scheduling of certain activities (hydro-vacing) to minimize nighttime noise will be accommodated. 


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

South Shore Corridor Project – Extended Work Hours Request – Public Comments Invited

November 27, 2020 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed South Shore Corridor Project – Extended Work Hours Request, located at Commissioner Street Vancouver, BC  is likely to cause significant adverse environmental effects.  Written comments to be received by December 26, 2020.

Notice of Determination – South Shore Corridor Project – Extension to Expiry Date  

August 26, 2020 – The Vancouver Fraser Port Authority has determined that the proposed South Shore Corridor Project – Extension to Expiry Date, located at Commissioner Street, Vancouver is not likely to cause significant adverse environmental effects. .

List all records

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, BC V6C 3T4
Email: per@portvancouver.com


  • Location

    • South Shore Corridor Project - Extension to Expiry Date (British Columbia)
  • Project Type

    • Highways and Roads
    • Ports and Harbours
  • Status

    In progress
  • Start Date

    2020-11-27
  • Proponent

    Vancouver Fraser Port Authority
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    80856