Construction of a service building in the parking lot of the Cap-des-Rosiers Beach
The service building is a sanitary building. Some clearing is necessary for the construction. The water supply for the building will be provided by a well to be built on a piece of land in the Park, either north of provincial highway 132 or near the building. A Bionest- or Ecoflo-type system will be built for water treatment.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
8 July 2020 – The public comment period on the project is closed. Parks Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New Project Being Assessed by Parks Canada - Public Comments Invited 8 June to 8 July, 2020 | - | June 12, 2020 |
List all records
Contacts
Forillon National Park122 Gaspé Boulevard
Gaspé, Quebec G4X 1A9
Telephone: 418-368-5505 or 1-888-773-8888
Fax: 418-368-6837
Email: pc.information.pc@canada.ca
-
Location
- Forillon National Park (Quebec)
-
Nature of Activity
- Building and Property Development
- Recreation and Tourism
-
Assessment Status
In progress -
Start Date
2020-06-08 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
80774
Nearby assessments
..within 200 kilometres-
Construction of a service building in the parking lot of the Cap-des-Rosiers beach
Forillon National Park -
Establishment of a Micmac experiential site within Forillon Park in the Cap-Bon-Ami sector.
Forillon National Park of Canada -
Protection of vegetation against spruce budworm at Petit Gaspé and oTENTik campgrounds
Forillon National Park -
Discovery and fishing cruise along the north coast of Forillon
Forillon National Park -
Maintenance Dredging - L'Anse-à-Brillant Fishing Harbour
L'Anse-à-Brillant Fishing Harbour -
Food counter service at the new visitor center located in the North sector
Forillon National Park -
Installation of a 15,000L diesel fuel tank at the Rivière-au-Renard Search and Rescue station.
Rivière-au-Renard Search and Rescue station -
Maintenance Dredging - L'Anse-à-Brillant Fishing Harbour
L'Anse-à-Brillant -
Maintenance Dredging at Port-Daniel Est Fishing Harbour
Port Daniel Est Fishing Harbour -
Maintenance Dredging at Port-Daniel Est Fishing Harbour
Port-Daniel-Est -
Maintenance Dredging - St-Godefroi Fishing Harbour
St-Godefroi Fishing Harbour -
Maintenance Dredging - Saint-Godefroi Fishing Harbour
Saint-Godefroi -
Miscou Fish Products Inc. Construction of Seafood Plant Addition
Miscou Small Craft Harbour -
Floating Wavebreaks Installation
Lameque Small Craft Harbour -
Installation of a Concrete Tank and Septic Pump-Out System at the Port of Caraquet, NB
Caraquet DFO-SCH -
Removal of access road and sea wall, and restoration of dune and tidal wetland habitats at Shippagan Gully, Gloucester County, New Brunswick
Shippagan Gully, Gloucester County -
Rehabilitation of Ruisseau-Leblanc Harbour, Gaspé Peninsula
Ruisseau-Leblanc Wharf -
Gasgusi Street Extension
Gesgapegiag -
Re-Surface Parking Lot at Detachment
Tracadie-Sheila -
Development of new campsites at the Barachois à Montpetit and Havre au Sauvage campgrounds in the Mingan Archipelago National Park Reserve
Mingan Archipelago National Park Reserve -
Relocation of the Domestic Outfall of the Mingan Wastewater Treatment Plant
Ekuanitshit -
Routine Maintenance Dredging
Port of Belledune -
Manitou and C Street Extensions and D Easement
Ekuanitshit -
Stabilization and Protection of the Mingan River Bank
Ekuanitshit -
Construction of a storage facility on Terminal 3 at the Port of Belledune
Belledune -
Containment Cell Construction and Dredging, Val Comeau, NB
Val Comeau Small Craft Harbour -
Maintenance Dredging at Rivière-au-Tonnerre Fishing Harbour
Rivière-au-Tonnerre Fishing Harbour -
Development of new camp sites at the Barachois à Montpetit and Havre au Sauvage campgrounds in the Mingan Archipelago National Park Reserve.
Mingan Archipelago National Park Reserve -
Elmtree Property Gold Mine
Dauversière -
Vanier Commercial Development Project
Bathurst -
Basin Dredging, New Mills Small Craft Harbour, New Brunswick
New Mills -
Eel River Bar Osprey Truckstop Expansion
Eel River Bar First Nation -
Esgenoopetitj First Nation Lift Station Upgrades
Esgenoopetitj First Nation -
Waste Rock and Water Management Project at the Tio Mine
Havre-Saint-Pierre -
Harbour Repairs and Dredging, Burnt Church, NB
Harbour Repairs and Dredging