Reconstruction of Nawash Unceded First Nation Roads and Culverts

 

The project will replace 23 culverts and reconstruct and resurface sections of roads in Chippewas of Nawash First Nation, Ontario. A total of 15 crossing culverts and 8 driveway culverts will be replaced and possibly upsized, which will also include cleaning out and regrading ditches, applying measures to prevent erosion of drainage inlets and outlets, relocating utilities, and reconstructing (2000 square metres) and resurfacing (400 square metres) sections of roads. The project will improve road safety and reliability, prevent future flooding and road washouts, and increase the service life of assets.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.


Latest update

2020-06-29 – The public comment period on the project is closed. Infrastructure Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

List all records

Contacts

Aboriginal Consultation and Environmental Services
1100 - 180 Kent St
Ottawa, ON K1P 0B6
Email: infc.aboriginalconsultenv-consultautochtonesenv.infc@canada.ca


  • Location

    • Neyaashiinigmiig (Ontario)
  • Project Type

    • Highways and Roads
  • Status

    In progress
  • Start Date

    2020-05-29
  • Proponent

    Chippewas of Nawash Unceded First Nation
  • Authorities

    • Indigenous Services Canada
    • Infrastructure Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80739