Institute of Ocean Sciences Patricia Bay - Miscellaneous Repairs 2020
This project involves refurbishing several structures on the wharf at the Institute of Ocean Sciences. All of these structures are currently aging and in need of repairs. The wharf is used daily by the Department's crews and vessels, and is critical to the regular operations of this facility. The proposed construction involves three different components, all situated on the wharf. The first tasks involves the demolition of the travel lift platform, located near Float A. This includes demolishing and safely removing all components of this structure, including the timber piles and the concrete decking. This structure will be separated into pieces and lifted up and out of the area. It will not be demolished by breaking down the structure and picking pieces off of the seabed.
The next section of this project involves building a new approach platform on the North side of Float D. This includes removing the existing piles and timber wharf head, and installing new piles and concrete decking. The only ground disturbance for this component will be the drilling/driving of the new piles. However, these piles will be approximately in the same location as the existing piles. Therefore, there will be very little new ground disturbance for this task.
The last portion of this project is structurally repairing the lock block abutment wall on the South side of Float D. This involves pouring concrete and moving some of the armour rock underneath the abutment in order to secure and stabilize it. A pit will be excavated in order to gain access to underneath the wall. The only ground disturbance for this component will be the excavation of the access pit, and the placement of concrete, which will be minimal.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
List all records
Contacts
Real Property & Technical SupportFisheries and Oceans Canada-Real Property Safety and Security, Real Property & Technical Support
Ryan Desrochers
Telephone: 604-666-3807
Fax: 604-666-4725
Email: Ryan.Desrochers@dfo-mpo.gc.ca
-
Location
- The Institute of Ocean Sciences is located in Sidney BC. The facility is accessible via road access, as well as by water for vessel/barge access. The site lies on the eastern shore of the Saanich Inlet which runs out into Haro Strait. (British Columbia)
-
Project Type
- Other, not otherwise specified
-
Status
In progress -
Start Date
2020-05-13 -
Proponent
Fisheries and Oceans Canada-Real Property Safety and Security, Real Property & Technical Support -
Authorities
- Fisheries and Oceans Canada
-
Assessment Type
Project on federal lands -
Reference Number
80685
Nearby projects
..within 200 kilometres-
Institute of Ocean Sciences Patricia Bay - Wharf Waterline Replacement
The Institute of Ocean Sciences is located in Sidney BC. The site lies on the eastern shore of the Saanich Inlet which runs out into Haro Strait. -
Institute of Ocean Sciences Patricia Bay - Wharf refurbishment
The Institute of Ocean Sciences is located in Sidney BC, on Vancouver Island. The facility is accessible via road access, as well as by water. The site lies on the eastern shore of the Saanich Inlet which runs out into Haro Strait. -
Blue Heron Aeropark Construction of Aircraft Hangars
Victoria International Airport YYJ -
Western Canadian Marine Response Corporation (WCMRC) Saanich Base
Victoria International Airport (YYJ) -
Titan Boats Construction of a Boat Manufacturing Facility
Victoria International Airport (YYJ) -
Temporary Installation of Remotely Piloted Aircraft System (RPAS) Detection Equipment
Victoria International Airport -
Modification of Existing Petroleum Storage Facility
Victoria International Airport -
Pauquachin Legacy Gathering Space
Cole Bay No. 3 Reserve (Pauquachin First Nation), North Saanich BC -
Campground Kiosk Install
Gulf Islands National Park Reserve -
Sidney Spit Buoy Upgrades
Gulf Islands National Park Reserve -
Establishing Shrubs in Protective Fenced Areas to Facilitate Forest Restoration on Sidney Island
Gulf Islands National Park Reserve -
Control of English Hawthorn on Sidney Island
Gulf Islands National Park Reserve -
WildFire Risk Reduction Project - fuels managment at three sites in Gulf Islands National Park Reserve
Gulf Islands National Park Reserve -
Freedom Mobile Installation on Radio Tower Site, North Pender Island
Gulf Islands National Park Reserve -
Radio Tower Upgrades, North Pender Island
Gulf Islands National Park Reserve -
Construction of a Boat Storage Facility at Colwood, CFB Esquimalt
CFB Esquimalt's Colwood property, located in the municipality of Colwood. -
Colwood Fuel Oil Depot - Air Scrubber
Colwood Fuel Oil Depot, Rosebank Road, Colwood -
G Jetty and Jetty 11 Remediation in Esquimalt Harbour
Colwood, Esquimalt Harbour, located in the municipality of Colwood British Columbia -
Pedestrian Walkway Extension Lot B1
Esquimalt Graving Dock -
EastEnd Dock Extension-Dock Floor/Wall Refurbishment
Esquimalt Graving Dock -
Royal Roads University - Japanese Gardens Drainage Upgrades
Royal Roads University, 2005 Sooke Road, Colwood -
Drydock Leak Repairs at HMC Dockyard, Canadian Forces Base Esquimalt
Her Majesty's Canadian Dockyard, Esquimalt Harbour -
Royal Roads University Sustainability Initiative - Overhead Service Upgrades (Lower Campus)
Royal Roads University in Colwood -
Royal Roads University Recreation Centre Change Room Renovation Project
Royal Roads University campus, in the municipality of Colwood, British Columbia -
Nav Canada surveillance radar - Gulf Islands National Park Reserve, Saturna Island, BC
Saturna Island, BC - Gulf Islands National Park Reserve of Canada -
Victoria Coast Guard Base - Timber Fender Replacement
This project is located on the wharf at the Victoria Coast Guard Base, 25 Huron Street, Victoria, BC. The base is accessible via road access, as well as by water for vessel and barge access. -
Canadian Coast Guard Victoria Base Wharf Refurbishment
The Victoria Coast Guard Base in James Bay, Victoria, British Columbia. The base is situated 2km from downtown Victoria, and lies on the edge of the Victoria's inner harbour, which eventually funnels out into the Strait of Juan de Fuca. -
Canadian Coast Guard Victoria Search and Rescue Float
25 Huron Street, Victoria BC, V8V 4V9 -
Winter Cove Boat Ramp Repair, Saturna Island
Gulf Islands National Park Reserve -
CREST - Microwave dish and VHF antenna - Mary Hill and Albert Head Road, Metchosin British Columbia
Albert Head Road, Metchosin -
CREST - Microwave dish and VHF antenna - Mary Hill and Albert Head Road, Metchosin British Columbia
Mary Hill - 5300 William Head Road, Metchosin -
Canadian Forces Ammunition Depot (CFAD) Rocky Point Main Gates Recapitalization
CFAD Rocky Point, located in the municipality of Metchosin, BC. -
Connect Municipal Water Supply to Canadian Forces Ammunition Depot (CFAD) Rocky Point
Canadian Forces Ammunition Depot (CFAD) Rocky Point , Metchosin -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Westshore Terminals Berth 2 Mooring Dolphin Upgrades
Delta -
Roberts Bank Terminal 2 Project
Delta -
GCT Deltaport Expansion - Berth Four Project
Delta -
Drainage Maintenance and Improvement Project - Alaksen National Wildlife Area
Alaksen National Wildlife Area -
Steveston Paramount Maintenance Dredging
Steveston Paramount Small Craft Harbour -
Vancouver Airport Fuel Delivery Project
Richmond -
Amendment to the construction hours in respect to condition 18 of the approved Area IV Site Preparation (PER No. 17-080)
Amendment to the construction hours in respect to condition 18 of the approved Area IV Site Preparation (PER No. 17-080) -
WesPac Tilbury Marine Jetty Project
Tilbury Island, Delta -
Tilbury Phase 2 LNG Expansion Project
Tilbury Island, Delta -
Riparian Habitat Enhancement - Russ Baker Way Lands
Riparian Habitat Enhancement - Russ Baker Way Lands -
Construct Maintenance Building and Military Vehicle Parking at Richmond Armoury
Richmond Armoury, 5500 #4 Road, Richmond -
Fenceline Construction and Maintenance at Richmond Training Area
Colonel Sherman Armoury and Richmond Training Area -
Delta Grinding Facility Project
Tilbury Island, Delta -
GRT Holdings Ltd. Construction and Operation of Soil Treatment Facility -DUKE POINT
Nanaimo -
Fraser River Pile and Dredge No. 8 Road Barge Ramp Maintenance Dredging
Richmond -
Concrete Batch Plant
Vancouver -
Vito Shipyards Wharf Repairs amendment
Vito Shipyards Wharf Repairs amendment -
Vito Dock Maintenance Dredging
Delta -
Vito Shipyards Wharf Repairs
Delta -
WCMRC Oil Spill Response Facility at Nanaimo Harbour
Nanaimo -
WCMRC Oil Spill Response Facility at Nanaimo Harbour
Nanaimo -
Delta Cedar New Pile Installation
Delta -
Annacis Island Wastewater Treatment Plant New Outfall - Project Permit No. 17-093-1 - Amendment (Condition 32 - Extended Hours)
Delta -
Exterior Landscape Redesign
60 Front Street Nanaimo -
Truck Parking Construction - Nordel Way Area
Truck Parking Construction - Nordel Way Area -
Nanaimo to Protection Island Submarine Cable Replacement Project
Nanaimo -
Queensgate Maintenance Dredging
Queensgate Maintenance Dredging -
Fraser Grain Terminal - Grain Export Facility - Amendment 06 - Grain Cleaner
Fraser Grain Terminal - Grain Export Facility - Amendment 06 - Grain Cleaner -
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-05 - Amendment (Condition 36 - Extended Hours)
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-05 - Amendment (Condition 36 - Extended Hours) -
WWL Underground Storage Tank Removal Annacis Island
Delta -
Annacis Water Supply Tunnel Safe Havens Amendment
Annacis Water Supply Tunnel Safe Havens Amendment -
Annacis Water Supply Tunnel Safe Havens Amendment
Annacis Water Supply Tunnel Safe Havens Amendment -
Installation of Pole Lights
100 Annacis Parkway, Annacis Island, Delta -
Containerized dry bulk handling project
Containerized dry bulk handling project -
Maintenance Dredging at FRPD Waterlot
Maintenance Dredging at FRPD Waterlot -
Amendment to the construction hours and permit expiry date for the approved Sediment Remediation and Dike Construction
Amendment to the construction hours and permit expiry date for the approved Sediment Remediation and Dike Construction -
Shoreline Protection at 177 Duncan Street in New Westminster
Shoreline Protection at 177 Duncan Street in New Westminster -
Trans Mountain Expansion Project
Burnaby -
Installation of scour protection
Installation of scour protection -
Expansion of the Lumber Transload Facility of Goodrich Terminal2012 Ltd. at the Port of Vancouver
Port of Vancoouver -
Fire Hydrant Replacement
Surrey Taxation Data Centre -
Demolition of Office Building and Parking Canopies
Demolition of Office Building and Parking Canopies -
Surrey Langley SkyTrain Project and Broadway Subway Project
Surrey -
CN rail bridge seismic retrofit project
CN rail bridge seismic retrofit project -
Pacific Elevators New Dust Control System and Access
Pacific Elevators New Dust Control System and Access -
Amix Pile and Float Removal
Amix Pile and Float Removal -
Schnitzer Fire Suppression Project - Design Amendment
Schnitzer Fire Suppression Project - Design Amendment -
Lehigh Materials - Surrey Barge Ramp Project
Lehigh Materials - Surrey Barge Ramp Project -
Schnitzer Steel Maintenance Dredging
Schnitzer Steel Maintenance Dredging -
Flood Barrier
Vancouver -
SeaBus Terminal Upgrades (Utilities)
SeaBus Terminal Upgrades (Utilities) -
Nanaimo Vancouver Passenger Only Ferry Service - South SeaBus Terminal - Project Permit No. 18-044-02 - Extension to the Expiry Date
Nanaimo Vancouver Passenger Only Ferry Service - South SeaBus Terminal - Project Permit No. 18-044-02 - Extension to the Expiry Date -
Seabin Installation at Main Street Dock
Vancouver, British Columbia -
Centerm Expansion Project - Amendment (Condition 66 - Dredging)
Centerm Expansion Project - Amendment (Condition 66 - Dredging) -
Centerm Expansion Project - Amendment PER No. 15-012-03 (Condition 47 - Extended Hours)
Centerm Expansion Project - Amendment PER No. 15-012-03 (Condition 47 - Extended Hours) -
Amendment to dates - Centerm Expansion Project Fisheries Act Authorization
Vancouver -
Centerm Expansion Project - Amendment to Fisheries Act Authorization
Vancouver -
Georgia Pacific Gypsum Plant Demolition
Georgia Pacific Gypsum Plant Demolition -
Royal Vancouver Yacht Club (RVYC) Coal Harbour Marina Expansion
Royal Vancouver Yacht Club (RVYC) Coal Harbour Marina Expansion -
Maintenance dredging - Centerm
Maintenance dredging - Centerm -
Shoreline protection and retaining wall improvements project
Shoreline protection and retaining wall improvements project -
Retaining wall replacement
Retaining wall replacement -
Pacific Terminals Emergency Vehicle Road Access
Pacific Terminals Emergency Vehicle Road Access -
Pacific Terminals Annex 1 and 2 Vacuum System Upgrade
Pacific Terminals Annex 1 and 2 Vacuum System Upgrade -
Global Container Terminal Vanterm Maintenance Dredging
Vancouver -
Extension - Temporary Construction Staging Parking and Barge Loading
Extension - Temporary Construction Staging Parking and Barge Loading -
Marine Operations Facility
Marine Operations Facility -
Surrey Langley SkyTrain Project and Broadway Subway Project
Langley -
Osprey Nest Platform
Osprey Nest Platform -
Mariner Seafoods Shoreline Protection
Mariner Seafoods Shoreline Protection -
Fraser Mills Foreshore Improvements
Fraser Mills Foreshore Improvements -
Fraser Mills Pile Removal
Fraser Mills Pile Removal -
Columbia Containers Shoreline Protection Repair
Columbia Containers Shoreline Protection Repair -
Cascadia West Rail Extension
Vancouver -
South Shore Corridor Project - Extension to Expiry Date
South Shore Corridor Project - Extension to Expiry Date -
Oil Spill Emergency Response Base - Project Permit No. 16-290 - Extension to the Expiry Date
Vancouver -
Fibreco Terminal Enhancement Project Amendment (Stormwater Design)
North Vancouver -
Installation of Annex 4 Vacuum System
Installation of Annex 4 Vacuum System -
Conveyance for North Shore Wastewater Treatment Plant - Project Permit No. 17-090-1 - Amendment (Condition 51 - Extended Hours)
North Vancouver -
Subtidal Cobble Replacement
North Vancouver -
Seaspan Ship Load-out Gravel Bed and Shoreline Protection
North Vancouver -
Kings Mill Park Shoreline and Habitat Work
Kings Mill Park Shoreline and Habitat Work -
G3 Terminal Vancouver Berth Pocket Obstruction Removals
G3 Terminal -
Neptune Terminal maintenance dredging at Berth 2 and 3
Neptune Terminal maintenance dredging at Berth 2 and 3 -
Barge Loading Facility
Barge loading facility -
Dredging to Deepen Berth 1 - Project Permit No. 18-027-1 - Amendment (Condition 23 - Extended Hours)
North Vancouver -
Neptune Coal Capacity Project and West Quadrant Shiploader - Project Permit No. 12-066-1 - Amendment (Condition 18 - Extended Hours)
North Vancouver -
Rail Expansion with Tent
Rail Expansion with Tent -
Extension to expiry date of Project Permit No. 18-027: Dredging to deepen berth 1 at Neptune Bulk Terminals
Extension to expiry date of Project Permit No. 18-027: Dredging to deepen berth 1 at Neptune Bulk Terminals -
Pacific Enterprise Science Centre (PESC) Foreshore Maintenance
Pacific Enterprise Science Centre (PESC) -
Neptune - Rail Bypass Track Layout
Neptune - Rail Bypass Track Layout -
G3 Terminal Vancouver - G3 Limited - Project Permit No. 15-180 - Extension to the Expiry Date and Extended Work Hours
G3 Terminal Vancouver - G3 Limited - Project Permit No. 15-180 - Extension to the Expiry Date and Extended Work Hours -
Dust Suppression Upgrade - Neptune Bulk Terminals (Canada) Ltd. - Project Permit 16-072 - Extension to the Expiry Date
Dust Suppression Upgrade - Neptune Bulk Terminals (Canada) Ltd. - Project Permit 16-072 - Extension to the Expiry Date -
Water Supply Tunnel at Second Narrows - Metro Vancouver - Amendment
Water Supply Tunnel at Second Narrows - Metro Vancouver - Amendment -
Neptune Cargill Overpass Extension - Project Permit No. 17-131-1 - Amendment (Condition 17 - Extended Hours)
North Vancouver -
New Microwave system and antenna proposal at 1959 Marine Dr. North Vancouver, BC
1959 Marine Drive North Vancouver BC -
Site Upgrades and Road Realignment - Lynnterm - Project Permit No. 17-154-2 - Extension to the Expiry Date
Site Upgrades and Road Realignment - Lynnterm - Project Permit No. 17-154-2 - Extension to the Expiry Date -
Chemtrade maintenance dredging
Chemtrade maintenance dredging -
Installation of Eight Steel Pipe Piles - Project Permit No. 18-184 - Extension to the Expiry Date
Burnaby -
Barge Ramp Beam Installation
Burnaby -
Shellburn Berthing Dolphin Replacement
Burnaby -
Teal-Jones Maintenance Dredging
Teal-Jones Maintenance Dredging -
Cates Park Foreshore Erosion Protection Project
North Vancouver -
Replacement of the Aldergrove Weather Radar
26600 8th Avenue, Langley, BC V0X 1A0 -
Removal of Concrete Boat Launch
Removal of concrete boat launch -
Amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107)
Amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107) -
Pacific Coast Terminals Co. Ltd. Port Moody Channel Dredging Permit Amendment Request
Pacific Coast Terminals Co. Ltd. Port Moody Channel Dredging Permit Amendment Request -
Existing Dock Upgrade for 4659 Strathcona
Existing Dock Upgrade for 4659 Strathcona -
Rocky Point Park Boat Ramp Repair in Port Moody
Rocky Point Boat Ramp Repair in Port Moody -
New Pile Installation for Recreational Dock
New Pile Installation for Recreational Dock -
Langley Outfall Maintenance Dredging
Langley Outfall Maintenance Dredging -
Katzie First Nation Shoreline Clean Up
Pitt Meadows -
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-04 - Amendment (Condition 36 - Extended Hours)
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-04 - Amendment (Condition 36 - Extended Hours) -
Gibsons Small Craft Harbour Wharf Reconstruction
Gibsons Landing Small Craft Harbour -
District of North Vancouver Designated Anchorage Area
District of North Vancouver Designated Anchorage Area -
Golden Ears Forcemain (GDEFM) Project
Golden Ears Forcemain Project -
Burnco Langley Maintenance Dredging Project
Burnco Langley Maintenance Dredging Project -
Stormwater outfall and dike upgrades
Stormwater outfall and dike upgrades -
Metro Vancouver - Conveyance for North Vancouver Wastewater Treatment Plant Amendment
Metro Vancouver - Conveyance for North Vancouver Wastewater Treatment Plant Amendment -
Maintenance Dredging, Fraser River, Small Craft Harbours
McMillan Island Harbour -
Maintenance Dredging, Fraser River, Small Craft Harbours
Kanaka Landing -
Maintenance Dredging, Fraser River, Small Craft Harbours
McIvors Landing -
Telus Communications Inc. Radiocommunication Antenna Addition on Sechelt Band Lands No 2 Reserve, Sechelt BC
5411 Reservoir Road Sechelt BC, Sunshine Coast area on the Sechelt Band Lands No 2 Reserve -
Creosote Pile Removal and Disposal - Extension PER No. 19-022-01
Creosote Pile Removal and Disposal - Extension PER No. 19-022-01 -
Maintenance Dredging, Fraser River, Small Craft Harbours
Whonnock Harbour -
Porpoise Bay Harbour Boat Grid Removal
Porpoise Bay Harbour -
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities)
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities) -
Maintenance Dredging, Fraser River, Small Craft Harbours
Mission Harbour -
BURNCO Aggregate Mine Project
Howe Sound -
Sumas IR6 Former Brick Plan Demolition and Remediation
Sumas First Nation Indian Reserve 6 -
Woodfibre LNG Project
Howe Sound -
TOPAZ Submarine fibre-optic cable
Port Alberni -
Kwispaa LNG Project
10 kilometres northeast of Bamfield -
SAY Community Centre
Skowkale No. 10 Reserve Land -
Site preparation for a subdivision on Popkum IR 2
Popkum IR2 -
Raven Underground Coal Mine Project
Buckley Bay -
Seabird Island Cultural Education, Community Resource Centre and Long-House Project
Agassiz, British Columbia -
Shxw'owhámél First Nation Outdoor Recreation Infrastructure Project
Shxw'owhámél First Nation -
Canadian Coast Guard - Cape Lazo BC - Oceans Protection Plan - Marine Safety System Modernization Initiative
Cape Lazo -
City of Powell River - Consolidated Waste Water Treatment Project
Powell River -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
Proposed Campground and RV Park at Tin Wis v
Tin Wis IR11 -
Tofino CCG SAR Station - Float Reconstruction
Tofino CCG SAR Station