Saulteaux IR159 Timber Harvest Plan 2020-21
The project is comprised of the planning, accessing, harvesting, and hauling of timber on the Saulteaux First Nation IR 159. Saskatchewan Forest Vegetation Inventory (SFVI) indicates that from the harvesting of the planned blocks 86-018-002, 86-018-004, and 86-018-005, 592.79 hectares, 59,752.66 cubic meters of hardwood, and 18,207.09 cubic meters of softwood will be realized. Past Mistik experience with SFVI in this general area is that the softwood yield is under estimated and the hardwood tends to be slightly overestimated.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
.
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Saulteaux IR159 Timber Harvest Plan 2020-21 | - | April 29, 2020 |
1 | Public Comment Period on Intent to Make a Determination | - | March 30, 2020 |
List all records
Contacts
ISC-SKENVIndigenous Services Canada
Hilary Hunter, A/ Sr. Environment Officer
1827 Albert Street
Regina, Saskatchewan S4P 2S9
Telephone: 306-780-5392
Email: aadnc.isc-skenv.aandc@canada.ca
-
Location
- Saulteaux IR 159EE (Saskatchewan)
-
Project Type
- Forestry
-
Status
Completed -
Start Date
2020-03-30 -
Proponent
Saulteaux First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80576
Nearby projects
..within 200 kilometres-
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Waskonaman Hill Gravel Project
Frog Lake First Nation -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
SaskPower Transformer Salvage
Prince Albert National Park -
Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Crean Channel Modification
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation Project)
Cold Lake First Nation -
Department of National Defence Future Fighter Capability Project - Demolition of Hangar 6 and Construction of New Fighter Squadron Facility
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Montreal Lake Cree Nation Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
Kehewin Cree Nation Transfer Station
Kehewin Cree Nation -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Enbridge Line 3 Replacement Program
Kerrobert -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A