The Canadian Coast Guard along with Transport Canada are undertaking a project to construct a wave-protected float on the south side of the CCG Victoria base at Camel Point in Victoria Harbour. The new float will provide moorage for lifeboat and Search and Rescue vessels and will include an upland abutment, elevated ramp, float and wave fence (wave attenuator) for protection.
The abutment will extend from approximately +4.6 m chart datum (higher high water mark large tide = +3.4 m chart datum) to approximately +1.0 m chart datum, and will support the landward end of the ramp. The abutment is mainly elevated with the exception of four steel piles in the intertidal zone (between approximately +2 m and +1 m chart datum) and a concrete foundation at approximately +4.6 m chart datum, which is above the higher high water mark. Dimensions will be approximately 11.6 m by 4.6 m with a total footprint of 61.5 sq. m, of which 41.5 sq. m is below and 20 sq. m is above the higher high water mark (large tide).
The steel ramp will extend from the abutment to the float between approximately +1.0 m and -2.5 m chart datum and will be elevated above the water. The ramp consists of a painted frame and galvanized grating with 50 by 100 mm spacing. The overall dimensions will be approximately 24 m by 4.6 m (i.e. includes portions that overlap with abutment and float), while the direct overwater portion of the ramp will be approximately 20.7 m by 4.6 m with a footprint of 94.3 sq. m. The ramp is a vehicle ramp that may be used by Emergency vehicle(s), as well as Canadian Coast Guard pick-up trucks and/or ATVs for delivering equipment to the lifeboats and SAR vessels.
The float will be located between approximately -2.5 m and -3.5 m chart datum and will connect to the ramp. It consists of two modules poured as one monolithic concrete pour. The concrete float is a standard float designed and constructed for previous installations by Canadian Coast Guard and Small Craft Commercial Harbours. Dimensions will be approximately 28 m by 18.7 m, providing a total moorage length of ~97 m, with a footprint of 476 sq. m (including floating fenders; 448 sq. m excluding fenders).
The float will be sheltered by a wave fence (wave attenuator) to reduce wave action in the moorage area. The wave fence will extend from below -3 m to approximately -5.5 m chart datum. It will be comprised of three sheet pile panel walls, 16 vertical piles and 16 batter piles. The total wave fence footprint is estimated at 97.7 sq. m.
In general, project works are proposed to start in April 2020 and end in November 2020. Within this eight month period, six months of pile installation is anticipated, as it involves drilling piles into bedrock and installing concrete rock sockets; however, project dates and duration will be dependent on the selected contractor's methodology. Key equipment and machinery that will be used on site includes: pile driving/crane barge, material supply barge, support tugs, mobile concrete batching plant, concrete delivery/mixing trucks, lifting crane for handling of steel piles and sheet pile panels on the ground.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
List all records
Contacts
Canadian Coast GuardRandy Burgin, Project Engineer, Ocean Protections Plan
25 Huron St
Victoria, British Columbia V8V 4V9
Telephone: 250-508-8121
Email: randy.burgin@dfo-mpo.gc.ca
Fisheries and Oceans Canada Real Property Technical Services
Don Storry, Project Engineer, Real Property & Technical Support
200 - 401 Burrard Street
Vancouver, British Columbia V6C 3S4
Telephone: 604-666-8526
Email: Don.Storry@dfo-mpo.gc.ca
-
Location
- 25 Huron Street, Victoria BC, V8V 4V9 (British Columbia)
-
Project Type
- Building and Property Development
- Other, not otherwise specified
-
Status
In progress -
Start Date
2020-02-21 -
Proponent
Fisheries and Oceans Canada -
Authorities
- Fisheries and Oceans Canada
- Transport Canada
-
Assessment Type
Project on federal lands -
Reference Number
80487
Nearby projects
..within 200 kilometres-
Canadian Coast Guard Victoria Base Wharf Refurbishment
The Victoria Coast Guard Base in James Bay, Victoria, British Columbia. The base is situated 2km from downtown Victoria, and lies on the edge of the Victoria's inner harbour, which eventually funnels out into the Strait of Juan de Fuca. -
Victoria Coast Guard Base - Timber Fender Replacement
This project is located on the wharf at the Victoria Coast Guard Base, 25 Huron Street, Victoria, BC. The base is accessible via road access, as well as by water for vessel and barge access. -
EastEnd Dock Extension-Dock Floor/Wall Refurbishment
Esquimalt Graving Dock -
Pedestrian Walkway Extension Lot B1
Esquimalt Graving Dock -
Drydock Leak Repairs at HMC Dockyard, Canadian Forces Base Esquimalt
Her Majesty's Canadian Dockyard, Esquimalt Harbour -
G Jetty and Jetty 11 Remediation in Esquimalt Harbour
Colwood, Esquimalt Harbour, located in the municipality of Colwood British Columbia -
Colwood Fuel Oil Depot - Air Scrubber
Colwood Fuel Oil Depot, Rosebank Road, Colwood -
Construction of a Boat Storage Facility at Colwood, CFB Esquimalt
CFB Esquimalt's Colwood property, located in the municipality of Colwood. -
Royal Roads University - Japanese Gardens Drainage Upgrades
Royal Roads University, 2005 Sooke Road, Colwood -
Royal Roads University Sustainability Initiative - Overhead Service Upgrades (Lower Campus)
Royal Roads University in Colwood -
Royal Roads University Recreation Centre Change Room Renovation Project
Royal Roads University campus, in the municipality of Colwood, British Columbia -
CREST - Microwave dish and VHF antenna - Mary Hill and Albert Head Road, Metchosin British Columbia
Albert Head Road, Metchosin -
CREST - Microwave dish and VHF antenna - Mary Hill and Albert Head Road, Metchosin British Columbia
Mary Hill - 5300 William Head Road, Metchosin -
Canadian Forces Ammunition Depot (CFAD) Rocky Point Main Gates Recapitalization
CFAD Rocky Point, located in the municipality of Metchosin, BC. -
Connect Municipal Water Supply to Canadian Forces Ammunition Depot (CFAD) Rocky Point
Canadian Forces Ammunition Depot (CFAD) Rocky Point , Metchosin -
Pauquachin Legacy Gathering Space
Cole Bay No. 3 Reserve (Pauquachin First Nation), North Saanich BC -
Control of English Hawthorn on Sidney Island
Gulf Islands National Park Reserve -
Establishing Shrubs in Protective Fenced Areas to Facilitate Forest Restoration on Sidney Island
Gulf Islands National Park Reserve -
Sidney Spit Buoy Upgrades
Gulf Islands National Park Reserve -
Blue Heron Aeropark Construction of Aircraft Hangars
Victoria International Airport YYJ -
Western Canadian Marine Response Corporation (WCMRC) Saanich Base
Victoria International Airport (YYJ) -
Titan Boats Construction of a Boat Manufacturing Facility
Victoria International Airport (YYJ) -
Temporary Installation of Remotely Piloted Aircraft System (RPAS) Detection Equipment
Victoria International Airport -
Modification of Existing Petroleum Storage Facility
Victoria International Airport -
Institute of Ocean Sciences Patricia Bay - Wharf Waterline Replacement
The Institute of Ocean Sciences is located in Sidney BC. The site lies on the eastern shore of the Saanich Inlet which runs out into Haro Strait. -
Institute of Ocean Sciences Patricia Bay - Wharf refurbishment
The Institute of Ocean Sciences is located in Sidney BC, on Vancouver Island. The facility is accessible via road access, as well as by water. The site lies on the eastern shore of the Saanich Inlet which runs out into Haro Strait. -
Institute of Ocean Sciences Patricia Bay - Miscellaneous Repairs 2020
The Institute of Ocean Sciences is located in Sidney BC. The facility is accessible via road access, as well as by water for vessel/barge access. The site lies on the eastern shore of the Saanich Inlet which runs out into Haro Strait. -
Campground Kiosk Install
Gulf Islands National Park Reserve -
WildFire Risk Reduction Project - fuels managment at three sites in Gulf Islands National Park Reserve
Gulf Islands National Park Reserve -
Freedom Mobile Installation on Radio Tower Site, North Pender Island
Gulf Islands National Park Reserve -
Radio Tower Upgrades, North Pender Island
Gulf Islands National Park Reserve -
Nav Canada surveillance radar - Gulf Islands National Park Reserve, Saturna Island, BC
Saturna Island, BC - Gulf Islands National Park Reserve of Canada -
Winter Cove Boat Ramp Repair, Saturna Island
Gulf Islands National Park Reserve -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild
The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island -
Westshore Terminals Berth 2 Mooring Dolphin Upgrades
Delta -
Roberts Bank Terminal 2 Project
Delta -
GCT Deltaport Expansion - Berth Four Project
Delta -
Drainage Maintenance and Improvement Project - Alaksen National Wildlife Area
Alaksen National Wildlife Area -
Steveston Paramount Maintenance Dredging
Steveston Paramount Small Craft Harbour -
WesPac Tilbury Marine Jetty Project
Tilbury Island, Delta -
Tilbury Phase 2 LNG Expansion Project
Tilbury Island, Delta -
Amendment to the construction hours in respect to condition 18 of the approved Area IV Site Preparation (PER No. 17-080)
Amendment to the construction hours in respect to condition 18 of the approved Area IV Site Preparation (PER No. 17-080) -
Delta Grinding Facility Project
Tilbury Island, Delta -
Vancouver Airport Fuel Delivery Project
Richmond -
Fraser River Pile and Dredge No. 8 Road Barge Ramp Maintenance Dredging
Richmond -
Construct Maintenance Building and Military Vehicle Parking at Richmond Armoury
Richmond Armoury, 5500 #4 Road, Richmond -
Fenceline Construction and Maintenance at Richmond Training Area
Colonel Sherman Armoury and Richmond Training Area -
Riparian Habitat Enhancement - Russ Baker Way Lands
Riparian Habitat Enhancement - Russ Baker Way Lands -
Vito Shipyards Wharf Repairs amendment
Vito Shipyards Wharf Repairs amendment -
Vito Dock Maintenance Dredging
Delta -
Vito Shipyards Wharf Repairs
Delta -
Delta Cedar New Pile Installation
Delta -
Truck Parking Construction - Nordel Way Area
Truck Parking Construction - Nordel Way Area -
Annacis Island Wastewater Treatment Plant New Outfall - Project Permit No. 17-093-1 - Amendment (Condition 32 - Extended Hours)
Delta -
GRT Holdings Ltd. Construction and Operation of Soil Treatment Facility -DUKE POINT
Nanaimo -
Concrete Batch Plant
Vancouver -
Queensgate Maintenance Dredging
Queensgate Maintenance Dredging -
Fraser Grain Terminal - Grain Export Facility - Amendment 06 - Grain Cleaner
Fraser Grain Terminal - Grain Export Facility - Amendment 06 - Grain Cleaner -
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-05 - Amendment (Condition 36 - Extended Hours)
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-05 - Amendment (Condition 36 - Extended Hours) -
WWL Underground Storage Tank Removal Annacis Island
Delta -
WCMRC Oil Spill Response Facility at Nanaimo Harbour
Nanaimo -
WCMRC Oil Spill Response Facility at Nanaimo Harbour
Nanaimo -
Annacis Water Supply Tunnel Safe Havens Amendment
Annacis Water Supply Tunnel Safe Havens Amendment -
Annacis Water Supply Tunnel Safe Havens Amendment
Annacis Water Supply Tunnel Safe Havens Amendment -
Containerized dry bulk handling project
Containerized dry bulk handling project -
Installation of Pole Lights
100 Annacis Parkway, Annacis Island, Delta -
Exterior Landscape Redesign
60 Front Street Nanaimo -
Maintenance Dredging at FRPD Waterlot
Maintenance Dredging at FRPD Waterlot -
Amendment to the construction hours and permit expiry date for the approved Sediment Remediation and Dike Construction
Amendment to the construction hours and permit expiry date for the approved Sediment Remediation and Dike Construction -
Nanaimo to Protection Island Submarine Cable Replacement Project
Nanaimo -
Shoreline Protection at 177 Duncan Street in New Westminster
Shoreline Protection at 177 Duncan Street in New Westminster -
Surrey Langley SkyTrain Project and Broadway Subway Project
Langley -
Fire Hydrant Replacement
Surrey Taxation Data Centre -
Replacement of the Aldergrove Weather Radar
26600 8th Avenue, Langley, BC V0X 1A0 -
Installation of scour protection
Installation of scour protection -
Surrey Langley SkyTrain Project and Broadway Subway Project
Surrey -
Expansion of the Lumber Transload Facility of Goodrich Terminal2012 Ltd. at the Port of Vancouver
Port of Vancoouver -
Demolition of Office Building and Parking Canopies
Demolition of Office Building and Parking Canopies -
Trans Mountain Expansion Project
Burnaby -
CN rail bridge seismic retrofit project
CN rail bridge seismic retrofit project -
Amix Pile and Float Removal
Amix Pile and Float Removal -
Lehigh Materials - Surrey Barge Ramp Project
Lehigh Materials - Surrey Barge Ramp Project -
Schnitzer Fire Suppression Project - Design Amendment
Schnitzer Fire Suppression Project - Design Amendment -
Schnitzer Steel Maintenance Dredging
Schnitzer Steel Maintenance Dredging -
Georgia Pacific Gypsum Plant Demolition
Georgia Pacific Gypsum Plant Demolition -
Shoreline protection and retaining wall improvements project
Shoreline protection and retaining wall improvements project -
Retaining wall replacement
Retaining wall replacement -
Osprey Nest Platform
Osprey Nest Platform -
Pacific Elevators New Dust Control System and Access
Pacific Elevators New Dust Control System and Access -
Fraser Mills Pile Removal
Fraser Mills Pile Removal -
Fraser Mills Foreshore Improvements
Fraser Mills Foreshore Improvements -
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-04 - Amendment (Condition 36 - Extended Hours)
Fraser Grain Terminal - Grain Export Facility - Project Permit No. 15-041-04 - Amendment (Condition 36 - Extended Hours) -
Barge Loading Facility
Barge loading facility -
Teal-Jones Maintenance Dredging
Teal-Jones Maintenance Dredging -
Flood Barrier
Vancouver -
SeaBus Terminal Upgrades (Utilities)
SeaBus Terminal Upgrades (Utilities) -
Nanaimo Vancouver Passenger Only Ferry Service - South SeaBus Terminal - Project Permit No. 18-044-02 - Extension to the Expiry Date
Nanaimo Vancouver Passenger Only Ferry Service - South SeaBus Terminal - Project Permit No. 18-044-02 - Extension to the Expiry Date -
Seabin Installation at Main Street Dock
Vancouver, British Columbia -
Centerm Expansion Project - Amendment PER No. 15-012-03 (Condition 47 - Extended Hours)
Centerm Expansion Project - Amendment PER No. 15-012-03 (Condition 47 - Extended Hours) -
Amendment to dates - Centerm Expansion Project Fisheries Act Authorization
Vancouver -
Centerm Expansion Project - Amendment to Fisheries Act Authorization
Vancouver -
Centerm Expansion Project - Amendment (Condition 66 - Dredging)
Centerm Expansion Project - Amendment (Condition 66 - Dredging) -
Maintenance dredging - Centerm
Maintenance dredging - Centerm -
Pacific Terminals Emergency Vehicle Road Access
Pacific Terminals Emergency Vehicle Road Access -
Pacific Terminals Annex 1 and 2 Vacuum System Upgrade
Pacific Terminals Annex 1 and 2 Vacuum System Upgrade -
Royal Vancouver Yacht Club (RVYC) Coal Harbour Marina Expansion
Royal Vancouver Yacht Club (RVYC) Coal Harbour Marina Expansion -
Global Container Terminal Vanterm Maintenance Dredging
Vancouver -
Extension - Temporary Construction Staging Parking and Barge Loading
Extension - Temporary Construction Staging Parking and Barge Loading -
Marine Operations Facility
Marine Operations Facility -
Mariner Seafoods Shoreline Protection
Mariner Seafoods Shoreline Protection -
Cascadia West Rail Extension
Vancouver -
South Shore Corridor Project - Extension to Expiry Date
South Shore Corridor Project - Extension to Expiry Date -
Columbia Containers Shoreline Protection Repair
Columbia Containers Shoreline Protection Repair -
Oil Spill Emergency Response Base - Project Permit No. 16-290 - Extension to the Expiry Date
Vancouver -
Installation of Annex 4 Vacuum System
Installation of Annex 4 Vacuum System -
Langley Outfall Maintenance Dredging
Langley Outfall Maintenance Dredging -
Rail Expansion with Tent
Rail Expansion with Tent -
G3 Terminal Vancouver Berth Pocket Obstruction Removals
G3 Terminal -
Fibreco Terminal Enhancement Project Amendment (Stormwater Design)
North Vancouver -
Golden Ears Forcemain (GDEFM) Project
Golden Ears Forcemain Project -
Neptune Terminal maintenance dredging at Berth 2 and 3
Neptune Terminal maintenance dredging at Berth 2 and 3 -
Katzie First Nation Shoreline Clean Up
Pitt Meadows -
Subtidal Cobble Replacement
North Vancouver -
Water Supply Tunnel at Second Narrows - Metro Vancouver - Amendment
Water Supply Tunnel at Second Narrows - Metro Vancouver - Amendment -
Dredging to Deepen Berth 1 - Project Permit No. 18-027-1 - Amendment (Condition 23 - Extended Hours)
North Vancouver -
Neptune Coal Capacity Project and West Quadrant Shiploader - Project Permit No. 12-066-1 - Amendment (Condition 18 - Extended Hours)
North Vancouver -
Chemtrade maintenance dredging
Chemtrade maintenance dredging -
Extension to expiry date of Project Permit No. 18-027: Dredging to deepen berth 1 at Neptune Bulk Terminals
Extension to expiry date of Project Permit No. 18-027: Dredging to deepen berth 1 at Neptune Bulk Terminals -
Burnco Langley Maintenance Dredging Project
Burnco Langley Maintenance Dredging Project -
G3 Terminal Vancouver - G3 Limited - Project Permit No. 15-180 - Extension to the Expiry Date and Extended Work Hours
G3 Terminal Vancouver - G3 Limited - Project Permit No. 15-180 - Extension to the Expiry Date and Extended Work Hours -
Installation of Eight Steel Pipe Piles - Project Permit No. 18-184 - Extension to the Expiry Date
Burnaby -
Barge Ramp Beam Installation
Burnaby -
Neptune - Rail Bypass Track Layout
Neptune - Rail Bypass Track Layout -
Site Upgrades and Road Realignment - Lynnterm - Project Permit No. 17-154-2 - Extension to the Expiry Date
Site Upgrades and Road Realignment - Lynnterm - Project Permit No. 17-154-2 - Extension to the Expiry Date -
Conveyance for North Shore Wastewater Treatment Plant - Project Permit No. 17-090-1 - Amendment (Condition 51 - Extended Hours)
North Vancouver -
Seaspan Ship Load-out Gravel Bed and Shoreline Protection
North Vancouver -
Dust Suppression Upgrade - Neptune Bulk Terminals (Canada) Ltd. - Project Permit 16-072 - Extension to the Expiry Date
Dust Suppression Upgrade - Neptune Bulk Terminals (Canada) Ltd. - Project Permit 16-072 - Extension to the Expiry Date -
Kings Mill Park Shoreline and Habitat Work
Kings Mill Park Shoreline and Habitat Work -
Shellburn Berthing Dolphin Replacement
Burnaby -
Neptune Cargill Overpass Extension - Project Permit No. 17-131-1 - Amendment (Condition 17 - Extended Hours)
North Vancouver -
Stormwater outfall and dike upgrades
Stormwater outfall and dike upgrades -
New Microwave system and antenna proposal at 1959 Marine Dr. North Vancouver, BC
1959 Marine Drive North Vancouver BC -
Cates Park Foreshore Erosion Protection Project
North Vancouver -
Pacific Enterprise Science Centre (PESC) Foreshore Maintenance
Pacific Enterprise Science Centre (PESC) -
Amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107)
Amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107) -
Removal of Concrete Boat Launch
Removal of concrete boat launch -
Maintenance Dredging, Fraser River, Small Craft Harbours
McMillan Island Harbour -
Rocky Point Park Boat Ramp Repair in Port Moody
Rocky Point Boat Ramp Repair in Port Moody -
Maintenance Dredging, Fraser River, Small Craft Harbours
McIvors Landing -
Maintenance Dredging, Fraser River, Small Craft Harbours
Kanaka Landing -
Pacific Coast Terminals Co. Ltd. Port Moody Channel Dredging Permit Amendment Request
Pacific Coast Terminals Co. Ltd. Port Moody Channel Dredging Permit Amendment Request -
New Pile Installation for Recreational Dock
New Pile Installation for Recreational Dock -
Existing Dock Upgrade for 4659 Strathcona
Existing Dock Upgrade for 4659 Strathcona -
District of North Vancouver Designated Anchorage Area
District of North Vancouver Designated Anchorage Area -
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities)
Fraser Grain Terminal - Grain Export Facility Amendment (Utilities) -
Maintenance Dredging, Fraser River, Small Craft Harbours
Whonnock Harbour -
Gibsons Small Craft Harbour Wharf Reconstruction
Gibsons Landing Small Craft Harbour -
Metro Vancouver - Conveyance for North Vancouver Wastewater Treatment Plant Amendment
Metro Vancouver - Conveyance for North Vancouver Wastewater Treatment Plant Amendment -
Maintenance Dredging, Fraser River, Small Craft Harbours
Mission Harbour -
Sumas IR6 Former Brick Plan Demolition and Remediation
Sumas First Nation Indian Reserve 6 -
Creosote Pile Removal and Disposal - Extension PER No. 19-022-01
Creosote Pile Removal and Disposal - Extension PER No. 19-022-01 -
Telus Communications Inc. Radiocommunication Antenna Addition on Sechelt Band Lands No 2 Reserve, Sechelt BC
5411 Reservoir Road Sechelt BC, Sunshine Coast area on the Sechelt Band Lands No 2 Reserve -
Porpoise Bay Harbour Boat Grid Removal
Porpoise Bay Harbour -
BURNCO Aggregate Mine Project
Howe Sound -
Kwispaa LNG Project
10 kilometres northeast of Bamfield -
SAY Community Centre
Skowkale No. 10 Reserve Land -
TOPAZ Submarine fibre-optic cable
Port Alberni -
Woodfibre LNG Project
Howe Sound -
Site preparation for a subdivision on Popkum IR 2
Popkum IR2 -
Seabird Island Cultural Education, Community Resource Centre and Long-House Project
Agassiz, British Columbia -
Raven Underground Coal Mine Project
Buckley Bay -
Shxw'owhámél First Nation Outdoor Recreation Infrastructure Project
Shxw'owhámél First Nation -
Canadian Coast Guard - Cape Lazo BC - Oceans Protection Plan - Marine Safety System Modernization Initiative
Cape Lazo -
City of Powell River - Consolidated Waste Water Treatment Project
Powell River -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land