Kings Mill Park Shoreline and Habitat Work

Proposed amendment:

Concert Properties (on behalf of the City of North Vancouver) proposes to extend the validity of the approved permit (PER No. 18-074), which expires on December 31, 2023. The amendment is being requested because the project is dependent on the municipal approval process for the design of the related upland residential development (outside the port authority's jurisdiction). There are no changes to the approved construction activities or scope of the work. 

Approved project:

Concert Properties, on behalf of City of North Vancouver, propose to conduct shoreline and habitat work along a 670 metre section of the shoreline at Harbourside Drive in North Vancouver.

A larger redevelopment project, the Harbouside Waterfront Development Project, includes mixed-use commercial and residential community development, construction of four new pocket beach habitats, and the installation of a sheet pile wall. These works  are located on municipal lands, and are therefore outside of the scope of this review.

Shoreline works proposed on Federal managed lands and waters include the construction of five rocky reef headlands and upgrades to an existing stormwater outfall. The shoreline works are proposed for flood protection improvements, marine habitat enhancements, and integration of the shoreline with the upland development. The rocky reef headlands will make use of existing riprap and serve to protect the new pocket beach habitats from erosion and to enhance marine habitat. The existing stormwater outfall and headwall is proposed to be upgraded and extended to align with the eastern most rocky headland. Construction of rocky headlands are anticipated to be completed from the upland by excavator and take place in the fish least risk window for Burrard Inlet.

More


Latest update

Notice of Determination 

North Vancouver, B.C. – June 14, 2023 – The Vancouver Fraser Port Authority has determined that the proposed Amendment to the permit expiry date for the approved Kings Mill Park Shoreline and Habitat Work located at the shoreline adjacent to Harbourside Drive in North Vancouver, BC is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
4 Amendment to the permit expiry date for the approved Kings Mill Park Shoreline and Habitat Work - June 14, 2023

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


  • Location

    • Kings Mill Park Shoreline and Habitat Work (British Columbia)
  • Nature of Activity

    • Ports and Harbours
    • Other, not otherwise specified
  • Assessment Status

    Completed
  • Start Date

    2023-05-04
  • Proponent

    City of North Vancouver
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    80480