Bloodvein First Nation School
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Indigenous Services Canada (ISC), in partnership with the Bloodvein First nation (BFN), are proposing to construct a new K-10 school and associated sporting/recreational facilities within the BFN community on Indian Reserve (IR. 12) land (the Project). Once completed, the school will be owned and operated by the BFN. The Project is generally located on the southeast side of the BFN community east of the existing school building and 130 m from the main community road (see Attachment A). Coordinates of the project location are: 658940E, 5739267N (UTM Zone 14U).
The Project will require clearing an area of approximately 5 hectares of forest within Indian Reservation land (IR. 12) adjacent to the existing community of the BFN located between the existing school building and community airstrip. The school will consist of a reinforced concrete foundation with piles to bedrock, a steel framed superstructure with concrete block and steel stud infill walls, finished with masonry and metal cladding and a modified bitumen roof.
NDL Construction was awarded the design-build contract to complete the architecture and engineering design of the school and to lead its construction planning and delivery. Number Ten Architecture Group is responsible for the design component of this project and, Dillon Consulting Ltd. is providing environmental and civil engineering services in support of Number Ten Architecture Group.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Notice of Determination for the Bloodvein First Nation School | - | June 9, 2020 |
Contacts
Indigenous Services CanadaAngela Bidinosti, Senior Environmental Officer
200-365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-984-0964
Fax: 204-983-2936
Email: angela.bidinosti@canada.ca
-
Location
- Bloodvein School (Manitoba)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2019-12-11 -
Proponent
Bloodvein Band -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80375
Nearby assessments
...within 200 kilometres-
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Berens River Bridge Replacement
Berens River First Nation -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Berens River First Nation Road Upgrades
Berens River -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Cancelled
Hollow Water -
New Fibre Installation
Hollow Water First Nation no.10 -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Black River First Nation Watermain Renewal Project
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2023 - Public Comments Invited
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Poplar River First Nation
Poplar River First Nation -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Project 4 — All-Season Road Connecting Berens River to Poplar River First Nation
-
Poplar River First Nation School
Poplar River Manitoba School -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Teacherages Project (Site Servicing)
Poplar River First Nation -
Poplar River Bridge Replacement
Poplar River First Nation -
Poplar River First Nation - Community Wharf - 2022/2023
Poplar River First Nation -
Poplar River - Harbour Improvements
Poplar River -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Interlake Region -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
New Fibre Installation / Upgrade Multiple Towers
Wunnumin Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake PoP -
Pikangikum Rapid Housing Initiative
Pikangikum First Nation -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Pikangikum First Nation - Nursing Station Fuel Storage Tank System Repairs
Pikangikum First Nation -
Pikangikum Cultural Learning and Community Centre
Pikangikum First Nation -
Pikangikum Remediation
Pikangikum First Nation -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation