ATCO Miette 5L215 Rebuild
ATCO is proposing to replace a 7.6 km section of overhead distribution line in Jasper National Park. The line currently extends from the Fiddle River Ashlar Ridge Lookout to Miette Hot Springs, and will be replaced with an equivalent length of mostly underground distribution line buried 1.2 m deep within the shoulder of the Miette Road. Short overhead segments will be installed where topographical constraints and the road alignment prevent underground installation. The existing line has significant access constraints from rough terrain, the proximity of Sulphur Creek and Fiddle River. Dense vegetation results in frequent and significant outages. Access limitations extend outage duration. Moving the line is anticipated to result in ecological gains and improve line reliability, safety and aesthetics. The project will be assessed with a basic impact assessment.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given project.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New Project Being Assessed by Parks Canada - Public Comments Invited 07 november to 07 december, 2019 | - | November 7, 2019 |
List all documents
Contacts
- Jasper National Park
- Box 10
- Jasper, AB, T0E 1E0
- Telephone: 780-852-6141
- Email: pc.evaluationdimpactjasper-jasperimpactassessment.pc@canada.ca
-
Location
- Jasper National Park (Alberta)
-
Project Type
- Other, not otherwise specified
-
Status
In progress -
Start Date
2019-11-07 -
Proponent
ATCO -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
80299
Nearby projects
..within 200 kilometres-
Robb Trend Coal Mine Expansion Project
Robb -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
Edson -
Edson Mainline Expansion Project
Drayton Valley -
Highway 947 Extension Project
-
Edson Mainline Expansion Project
Drayton Valley -
Ruddock Creek Mine Project
Avola -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Prairie Lights Power Project
Greenview