Sawridge Band Solar Farm Project

Sawridge Band is proposing to construct and operate a new solar electrical generation facility with the maximum output capacity of 4.95 megawatts (MW) and up to 8.5 gigawatt hours (GWh) per year. The site is 10.1 ha with a target build-able area of the entire site. There will be approximately 18,000 solar panels arranged into approximately 25 arrays.  It is planned to be 99 inverters of 50 kW each and 3, 2 MVA transformers. The electricity generated from the facility will be input into the local electrical grid that is part of Alberta's Interconnected Electric System (AIES).


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given project.

 

Latest update

The assessment is in progress.

Key documents

Key documents
Document Number Document Title File Date
1 Public Comment Period on Intent to Make a Determination - October 30, 2019

List all documents

Contacts

  • Indigenous Services Canada
  • 630 Canada Place, 9700 Jasper Ave
  • Edmonton, AB, T5J 4G2
  • Telephone: 780-782-8350
  • Email: stacey.leblanc@canada.ca

  • Location

    • Sawridge Band (Alberta)
  • Project Type

    • Alternative Energy
  • Status

    In progress
  • Start Date

    2019-10-30
  • Proponent

    Sawridge Band
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80282