Atikameksheng Anishnawbek On Reserve New Housing
Atikameksheng Anishnawbek First Nation is in the process of building three new residential rental units within their community. Three new lots will be cleared and three units of 1200 square feet will be constructed. The homes will be located on lots 8, 19 and 20 of the Hill Street Subdivision.
Atikameksheng Anishnawbek has previously reviewed this project under their First Nation's Land Management Agreement, and have noted that no significant environmental effects will result from this project.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
November 20, 2019 – Indigenous Services Canada issued its notice of determination https://iaac-aeic.gc.ca/050/evaluations/document/133108 and determined that the project is not likely to cause significant adverse environmental effects..
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Atikameksheng Anishnawbek On Reserve New Housing | - | November 20, 2019 |
1 | Public Comment Period on Intent to Make a Determination | - | October 17, 2019 |
List all records
Contacts
Indigenous Service CanadaPhilip Stringer, Environment Officer
760 Notre Dame Ave
Unit M
Sudbury, Ontario P3A 2T4
Telephone: 705-522-3475
Fax: 705-677-7976
Email: philip.stringer@canada.ca
-
Location
- Atikameksheng Anishnawbek First Nation (Ontario)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2020-05-04 -
Proponent
Atikameksheng Anishnawbek First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80256
Nearby assessments
..within 200 kilometres-
Atikameksheng By-Pass Road Construction
Naughton -
Victoria Mine Project
Southwest of Sudbury -
Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing
Wahnapitae First Nation -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
-
Sagamok First Nation- Tree Clearing Project
Sagamok New School -
Aundeck Omni Kaning First Nation New Housing
Aundeck Omni Kaning First Nation -
Replacement of the Britt Weather Radar
8 Station Road, Britt, Ontario, P0G 1A0 -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
Henvey, Mason, Mowat -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
-
Magnetawan First Nation Underground Storage Tank Removal - Band Office
Magnetawan First Nation -
Dokis First Nation Hydro Line Servicing
Dokis First Nation -
French River Boathouse, Wharf, and Workshop
French River Dam Office -
French River Septic Replacement
French River Dam Office -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
Wallbridge -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
-
Nipissing First Nation - Upgrades and Expansion of Garden Village Water Treatment Plant
Nipissing First Nation -
Shawanaga First Nation- Construction of Three (3) New Homes
Shawanaga First Nation -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
Harrison, Shawanaga, Wallbridge -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
-
Nipissing First Nation - New Road Development: Yellek to Duchesnay
Nipissing First Nation - New Road Development: Yellek to Duchesnay -
Canadian Coast Guard - Otter Islands Helipad Installations Project
North Otter island -
Canadian Coast Guard - Otter Islands Helipad Installations Project
South Otter Island -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
Carling -
Tobermory (Little Tub) Harbour - North and West Wall Rehabiliation
Tobermory -
Energy East Project
North Bay -
Manston Crescent Municipal Upgrades, Canadian Forces Base North Bay, Ontario
Manston Crescent is located on the north end of Canadian Forces Base, 22 Wing, in North Bay -
Underground Complex Substation Replacement, North Bay, ON
Approximately 1.8 km south of 22 Wing's Main Base -
Improvements to Two Roads in Sheshagwaning First Nation
Improvements to Two Roads in Sheshagwaning First Nation -
Côté Gold Mine Project
Gogama -
Mississauga First nation - Gas Bar Tank Removal
Mississauga First Nation -
Canadian Coast Guard Parry Sound Base Helipad Area Repair Project
Parry Sound -
Permanent Waterway Barriers for Latchford Dam
Latchford Dam -
Lion's Head Harbour Dredging Project - Spring 2021
Lion's Head Harbour -
Chippewas of Nawash First Nation Water System Upgrades
Chippewas of Nawash -
Reconstruction of Nawash Unceded First Nation Roads and Culverts
Neyaashiinigmiig -
Timiskaming Dam-Bridge of Quebec Replacement Project
Temiscaming -
Marina Construction Project
Kebaowek -
Widjikiwe Gas Bar
Timiskaming -
Upgrading of Roadways in Beausoleil First Nation
Beausoleil First Nation Reserve -
Beausoleil First Nation - Stormwater System Upgrade and Existing Drainage Rehabilitation
Beausoleil First Nation Reserve -
4th Canadian Divsion Training Centre (Meaford) North Shore Road Erosion Control
4th Canadian Division Training Centre (Meaford) -
Bala North Dam Waterpower, Lake Muskoka, Township of Muskoka Lakes
Bala -
Impeed the Reed
Georgian Bay Islands National Park -
Potable Water Well Installation; private residence well.
Public Port of Owen Sound -
Soil Remediation at Jannacks Narrows Minor Shore Light, Bala Park Island, Ontario
Jannacks Narrows Minor Shore Light, Ontario