SaskPower Pole Mount Transformer Replacement for Hawood
SaskPower is proposing to replace a pole mount transformer on an existing wooden pole, and directionally drill 65 m to a customer supplied metering point in SE-16-57-01 W3M. within Prince Albert National Park. The project is required to increase the capacity of the line and maintain the quality of service to an existing customer. Equipment that is expected to be used for completion of the project includes: a digger truck, back-hoe, bucket truck, directional boring equipment, and crew trucks. access to components of the project will make use of existing roads and trails. Surface disturbance is expected to be minimized to the bell holes at the existing pole and metering point.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | December 15, 2019 |
1 | New Project Being Assessed by Parks Canada - Public Comments Invited 20 September to 20 October, 2019 | - | September 20, 2019 |
List all records
Contacts
Prince Albert National ParkBox 100
Waskesiu Lake, Saskatchewan S0J 0N0
Telephone: 306-663-4522 or 1-888-773-8883
Email: pc.princealbertinfo.pc@canada.ca
-
Location
- Prince Albert National Park (Saskatchewan)
-
Project Type
- Recreation and Tourism
- Hydroelectric Energy
-
Status
Completed -
Start Date
2019-09-20 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
80213
Nearby projects
..within 200 kilometres-
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
SaskPower Transformer Salvage
Prince Albert National Park -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
Montreal Lake Cree Nation Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Crean Channel Modification
Prince Albert National Park -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Star-Orion South Diamond Project
Fort à la Corne Provincial Forest -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D