In support of the new Impact Assessment Act, the Impact Assessment Agency of Canada has redesigned and implemented a new Canadian Impact Assessment Registry. Learn more about the new Registry.

Registry Search Mobile

Registry Search

North Thompson Rail Terminal Development Project

North Thompson Rail Terminals Inc. is proposing the construction and operation of a rail yard facility located in Kamloops, British Columbia. As proposed, the North Thompson Rail Terminal Development Project would include 41 rail tracks totaling 14.6 kilometres in length, and would connect to the Canadian National Railway Company's mainline located on the eastern shore of the North Thompson River. The project would also include facilities for railcar loading, switching, storage and repair, as well as infrastructure upgrades and a site access road. Once constructed, the project would occupy an area of approximately 27 hectares.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given project.


Latest update

February 15, 2019 - The Canadian Environmental Assessment Agency issued its environmental assessment determination and decided that an environmental assessment of the designated project is not required.

List all documents

Contacts

  • Impact Assessment Agency of Canada
  • 22nd Floor, Place Bell
  • Ottawa, ON, K1A 0H3
  • Telephone: 613-957-0700 or 1-866-582-1884
  • Fax: 613-957-0862
  • Email: ceaa.information.acee@canada.ca

  • Location

    • Kamloops (British Columbia)
  • Project Type

    • Transportation
  • Status

    Completed
  • Proponent

    North Thompson Rail Terminals Inc.
  • Authorities

    • Canadian Environmental Assessment Agency
  • Assessment Type

    Assessment not applicable
  • Reference Number

    80163
Date modified: