City of Winnipeg Insect Control Branch and Heliport Relocation Project
The City of Winnipeg proposes to construct and operate a new heliport (aerodrome) as part of the relocation of its Insect Control Branch and existing heliport. As proposed, the City of Winnipeg Insect Control Branch and Heliport Relocation Project would involve the construction of a new heliport and aircraft hangar, an operations building with attached cold storage, and a warehouse for pesticide storage on city-owned land.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
June 29, 2018 - The Canadian Environmental Assessment Agency issued its environmental assessment determination and decided that an environmental assessment of the designated project is not required.
List all records
Contacts
Impact Assessment Agency of Canada160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: iaac.information.aeic@canada.ca
-
Location
- City of Winnipeg (Manitoba)
-
Project Type
- Transportation
-
Status
Completed -
Proponent
City of Winnipeg -
Authorities
- Canadian Environmental Assessment Agency
-
Assessment Type
Assessment not applicable -
Reference Number
80150
Nearby projects
..within 200 kilometres-
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Energy East Project
Winnipeg -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Vivian Sand Processing Facility Project and Vivian Sand Extraction Project
Springfield -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Enbridge Line 3 Replacement Program
Gretna -
Enbridge Line 3 Replacement Program
Morden -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Northwest Angle 33 FIrst Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Interlake Region