Sundog Renewable Generating Station Project

130 kilometres upstream of Fort McMurray (Alberta)

Reference number: 80146
Federal Responsible Authority: Canadian Environmental Assessment Agency
Proponent: Sundog RGS GP Inc.
Environmental Assessment Commenced: 2018-01-10
Environmental Assessment Type: Environmental Assessment by Responsible Authority
Status: Environmental assessment terminated

Latest Update

February 14, 2018 - The Canadian Environmental Assessment Agency terminated the environmental assessment process of the designated project at the request of the proponent.

About the Proposal

Sundog RGS GP Inc., a wholly owned subsidiary of Innergex Renewable Energy Inc., is proposing the construction and operation of a run-of river hydroelectric facility on the Athabasca River located approximately 130 kilometres upstream of Fort McMurray, Alberta. The proposed Sundog Renewable Generating Station Project would have a generating capacity of 135 megawatts. Components would include a new 240 kilovolt transmission line, a spillway to increase the water level in the river, a powerhouse, in-river embankment structures, boat launches, access roads, and ramp fishways.

Documents

  • For Public Participation (2)
    Contains all documents related to public participation opportunities
  • News Releases (1)
    Contains all news releases related to this environmental assessment process.
  • Additional Information (5)
    Contains additional records related to the project and the environmental assessment process.
List and Search All Documents

For questions or information, please contact:

Canadian Environmental Assessment Agency
22nd Floor, Place Bell
160 Elgin Street
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: ceaa.information.acee@canada.ca

Date modified: