Chinook Power Station Project

Saskatchewan Power Corporation (SaskPower) is proposing to construct and operate a 350-megawatt combined cycle natural gas power station located approximately 11 kilometres northwest of Swift Current, Saskatchewan. As proposed, the Chinook Power Station Project would have an operating lifespan of at least 30 years and include a power generation facility, a switchyard, and a new underground water pipeline.



Latest update

December 2, 2016 - The Canadian Environmental Assessment Agency issued its environmental assessment determination and decided that an environmental assessment of the designated project is not required.

List all documents

Contacts

  • Impact Assessment Agency of Canada
  • 22nd Floor, Place Bell
  • Ottawa, ON, K1A 0H3
  • Telephone: 613-957-0700 or 1-866-582-1884
  • Fax: 613-957-0862
  • Email: ceaa.information.acee@canada.ca

  • Location

    • Approximately 11 kilometres northwest of Swift Current (Saskatchewan)
  • Project Type

    • Oil and Gas
  • Status

    Completed
  • Start Date

    Environmental Assessment start date to be determined
  • Proponent

    Saskatchewan Power Corporation (SaskPower)
  • Authorities

    • Canadian Environmental Assessment Agency
  • Assessment Type

    Assessment not applicable