Hardisty Rail Terminal Project

10 km southeast of Hardisty (Alberta)

Reference number: 80113
Federal Responsible Authority: Canadian Environmental Assessment Agency
Proponent: USD Terminals Canada II ULC
Status: Cancelled

Latest Update

January 27, 2016 - The Canadian Environmental Assessment Agency will not be commencing an environmental assessment for this Project. The Agency has been advised by the proponent that it no longer intend to carry out the Project as described in the Project Description submitted on November 9, 2015, under the Canadian Environmental Assessment Act, 2012.

About the Proposal

USD Terminals Canada II ULC is proposing to construct and operate nine new rail tracks and loading infrastructure at its existing Hardisty Rail Terminal, located approximately 10 kilometres southeast of Hardisty, Alberta. As proposed, the Hardisty Rail Terminal Project would allow the existing facility, which currently transloads light crude oil from pipeline to railcar, to handle a wider variety of products such as propane, butane, and heavy crude oil. The facility’s loading capacity would also increase, going from two to four 120-car trains per day and allowing shipments to be brought in by truck.

Documents

  • For Public Participation (2)
    Contains all documents related to public participation opportunities
  • News Releases (1)
    Contains all news releases related to this environmental assessment process.
  • Additional Information (2)
    Contains additional records related to the project and the environmental assessment process.
List and Search All Documents

For questions or information, please contact:

Canadian Environmental Assessment Agency
22nd Floor, Place Bell
160 Elgin Street
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: ceaa.information.acee@canada.ca

Date modified: