2017 NGTL System Expansion Project
About the Proposal
NOVA Gas Transmission Ltd. (NGTL) filed its regulatory application for the 2017 NGTL System Expansion Project (Project) on 31 March 2015. NGTL, a wholly owned subsidiary of TransCanada PipeLines Limited (TransCanada), proposes to construct and operate new pipeline facilities in Alberta to receive and deliver sweet natural gas as part of the existing NGTL System.
The Project as proposed would include:
1. 230 km of pipeline ranging from 610 mm (Nominal Pipe Size (NPS) 24) to 1219 mm (NPS 48) outside diameter (OD) in five separate sections in Northern Alberta:
- Northwest Mainline Loop – Boundary Lake Section
- Northwest Mainline Loop – Bear Canyon Section
- Grande Prairie Mainline Loop No. 2 – McLeod River Section
- Liege Lateral Loop No. 2 – Pelican Lake Section
- Kettle River Lateral Loop – Christina River Sectio
2. Two compression stations:
- Alces River Compressor Station Unit Addition
- Otter Lake Compressor Station Unit Addition
3. Additions and related components, including valve sites, auxiliary buildings and yard piping.
4. Temporary infrastructure such as access roads, stockpile sites, construction camps and contractor yards during construction.
If regulatory approval is obtained, construction is proposed to start in late 2016, with an anticipated in-service date in 2017.
The Project Description includes designated physical activities listed in the Regulations Designating Physical Activities (Regulations) under the Canadian Environmental Assessment Act, 2012 (CEAA 2012), specifically the construction of over 40 km of new pipeline. As a result, the Project is a designated project for the purposes of CEAA 2012 for which the NEB will be the responsible authority.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
External Links
Please note that access to external websites is provided solely as a courtesy. Users should be aware that the information offered by non‑Government of Canada websites that are not subject to the Official Languages Act might be available in only one language.
Contacts
National Energy BoardKatie Emond, Process Advisor
Telephone: 1-800-899-1265
Fax: 1-877-288-8803
Email: NGTL_Expansion@neb-one.gc.ca
-
Location
- Fort McMurray (Alberta)
- Grande Prairie (Alberta)
-
Nature of Activity
- Oil and Gas
-
Assessment Status
Completed -
Start Date
2015-06-01 -
Proponent
NOVA Gas Transmission Ltd. (NGTL) -
Authorities
- National Energy Board
-
Assessment Type
Environmental assessment under CEAA 2012 -
Reference Number
80099
Nearby assessments
...within 200 kilometres-
Grande Prairie Very High Frequency Omni-directional Range (VOR) Replacement
Transport Canada Property Number DFRP# 15908: Grande Prairie (VOR/DME) -
Prairie Lights Power Project
Greenview -
Rycroft Alternative Water Hub Facility Project
Woking -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Rocky Mountain House -
New Fibre Installation
Horse Lake First Nation -
Horse Lake First Nation Lot Servicing Phases 2 and 3A
Horse Lake First Nation -
Horse Lake 5 Unit Lot Servicing (Phase 2A) Project
Horse Lake First Nation -
Towerbirch Expansion Project
Gordondale -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 1 -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 3 -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 2 -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 6 -
Upgrade (multiple) towers
Sturgeon Lake No.154A (Sturgeon Lake Cree Nation) - Site 7 -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 4 -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 5 -
Amisk Hydroelectric Project
Peace River -
Towerbirch Expansion Project
Bessborough -
Echo Hill Coal Mine Project
Tumbler Ridge -
North Corridor Expansion Project
Bear Canyon -
Smoky River Wind Project
Municipal District of Smoky River, between Nampa and Falher -
Summit Mine 14 Project
Grande Cache -
Towerbirch Expansion Project
Tower Lake -
Merrick Pipeline Project
Groundbirch -
North Corridor Expansion Project
Range Road 131A -
Murray River Coal Project
Tumbler Ridge -
North Montney Project
Fort St. John -
Sucker Creek First Nation Water System Upgrades
Sucker Creek First Nation -
Three Unit Modular Housing Project
Sucker Creek First Nation -
Kapawe'no First Nation Echo Prairie Waterline Project
Kapawe'no First Nation -
Kapawe'no Adventure Trail Project
Kapawe'no Adventure Trail Project -
Sucker Creek Housing Project 2020 (4 Units)
Sucker Creek First Nation -
Site C Clean Energy Project
Fort St. John -
Sukunka Coal Project
Northeast British Columbia -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
Nav Canada, Modification to Existing Radiocommunications Tower on Transport Canada Property 19847, Fort St John, BC
Nav Canada, Modification to Existing Radiocommunications Tower on Transport Canada Property 19847, Fort St John, BC -
Highway 947 Extension Project
-
Joussard Harbour Alberta - Routine Maintenance Dredging of the Joussard Harbour at Lesser Slave Lake Alberta - over the next year
Joussard Harbour -
Wolverine River Lateral Loop (Carmon Creek Section)
Carmon Lake -
Doig River First Nation - Tea Dance Circle
Doig River First Nation -
Driftpile Cree Nation New Housing Construction Project
Driftpile, AB -
Driftpile Cree Nation Housing Project
Driftpile Cree Nation -
Driftpile Cree Nation Gas Line Connector Project
Driftpile Cree Nation -
DCN 2023 Rapid Housing Project
DCN 2023 Rapid Housing Project -
Driftpile Cree Nation Lift Station No. 1 Replacement Project
Driftpile Cree Nation -
Saulteau First Nation Sewage Collection, Treatment and Disposal System
Saulteau First Nation -
Saulteau First Nations - Community Cultural Building
East Moberly Lake No. 169 -
Rogers Communications Inc., new radiocommunications tower (W6238) on Peerless Trout First Nation land, near Trout Lake, AB.
W6238 - Peerless Trout First Nation Land (near Trout Lake) -
North Corridor Expansion Project
Peerless Lake -
Rogers Communications Inc., new radiocommunications tower (W6225) on Peerless Trout First Nation land, near Peerless Lake, AB.
W6225 - Peerless Trout First Nation Land (near Peerless Lake) -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
Bigstone Cree Nation High School Waterline Project
Wabasca -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority: CU254 Oksi Pasikoniwew Kakik School Secondary Access Road Project
Bigstone Cree Nation -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
ATCO Gas and Pipelines Ltd.: 1088866 Wabasca IR No. 166A Gas Distribution Extension
Bigstone Cree Nation Wabasca IR No. 166A -
Bigstone Cree Nation & Hamlet of Sandy Lake - ATCO Gas and Pipelines Ltd.: 1088866 - Gas Feeder and Mains at Wabasca IR No. 166
Bigstone Cree Nation -
Bigstone Cree Nation ATCO Gas and Pipelines Ltd.: 1098480 Wabasca IR No. 166 Phase 2 Alfred Road Gas Main & Distribution System
Bigstone Cree Nation -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Frontier Oil Sands Mine Project
Fort McKay -
Pierre River Mine Project
Fort McKay -
Jackpine Mine Expansion Project
Fort McKay -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Fixed Point-to-Point Link from Buffalo Narrows, SK to Dillon, SK
Buffalo River Dene Nation I.R. 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193 -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
Patterson Lake South Mine Project
Patterson Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
TURNOR LAKE I.R. 193B (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
TURNOR LAKE I.R. 193B (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
TURNOR LAKE I.R. 193B (Tower 3) -
Rook 1 Project
Patterson Lake