Heartland Generating Station Project

ATCO Power Canada Ltd. proposes to construct and operate a natural gas-fired power plant located 14 kilometres northeast of Fort Saskatchewan, Alberta. The power plant, expected to operate for about 35 years, would have a maximum power capacity of 503 megawatts.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given project.


Latest update

The assessment is in progress.

List all documents

Contacts

  • Impact Assessment Agency of Canada
  • 22nd Floor, Place Bell
  • Ottawa, ON, K1A 0H3
  • Telephone: 613-957-0700 or 1-866-582-1884
  • Fax: 613-957-0862
  • Email: ceaa.information.acee@canada.ca

  • Location

    • Fort Saskatchewan, Bruderheim (Alberta)
  • Project Type

    • Hydroelectric Energy
  • Status

    Completed
  • Proponent

    ATCO Power Canada Ltd.
  • Authorities

    • Canadian Environmental Assessment Agency
  • Assessment Type

    Assessment not applicable
  • Reference Number

    80065