In support of the new Impact Assessment Act, the Impact Assessment Agency of Canada has redesigned and implemented a new Canadian Impact Assessment Registry. Learn more about the new Registry.

Registry Search Mobile

Registry Search

Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project

Projects that were undergoing a comprehensive study at the time the provisions of the Canadian Environmental Assessment Act, 2012 came into force will continue to follow the requirements of the former Act. Under the former Act, the Canadian Environmental Assessment Agency is responsible for conducting the comprehensive study of this project.

FortisBC Energy Inc. is proposing to construct a new 161 km long natural gas transmission pipeline generally alongside the existing natural gas transmission pipeline between Kingsvale, B.C. and Oliver, B.C.

Note this project was formerly known as the Kingsvale-Oliver Reinforcement Project.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given project.


Latest update

January 08, 2016 - The assessment process has been terminated.

List all documents

Contacts

  • Impact Assessment Agency of Canada
  • 22nd Floor, Place Bell
  • Ottawa, ON, K1A 0H3
  • Telephone: 613-957-0700 or 1-866-582-1884
  • Fax: 613-957-0862
  • Email: ceaa.information.acee@canada.ca

  • Location

    • Kingsvale (British Columbia)
    • Oliver (British Columbia)
  • Project Type

    • Oil and Gas
  • Status

    Terminated
  • Proponent

    FortisBC Energy Inc.
  • Authorities

    • Indigenous and Northern Affairs Canada
  • Assessment Type

    Comprehensive study under CEAA 1992
  • Reference Number

    64738
Date modified: