Bala North Dam Waterpower, Lake Muskoka, Township of Muskoka Lakes

The Minister of the Environment has designated this project and the environmental assessment will continue under the former Canadian Environmental Assessment Act.

Swift River Energy is proposing the construction and operation of a 4.3 MW hydroelectric generating facility approximately 25 m south of the existing North Bala Dam on the Moon River in the village of Bala, Ontario, including the installation of a temporary coffer dam and blasting through bedrock to create an approximately 30 m long intake/approach channel in Muskoka Lake, the installation of a second temporary coffer dam and blasting and excavation of an approximately 20m long tailrace channel in the Moon River, and the diversion of flows through the new facility. There will be no structural changes made to the existing dam as part of the project.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given project.

 

Latest update

February 14, 2013 - The assessment process has been terminated.

List all documents

Contacts

  • Jennifer Hughes
  • Environmental Officer
  • 4900 Yonge Street
  • Toronto, ON, M2N 6A5
  • Telephone: 416-952-0469
  • Fax: 416-952-0514
  • Email: enviroont@tc.gc.ca

  • Location

    • Bala (Ontario)
  • Project Type

    • Hydroelectric Energy
  • Status

    Terminated
  • Proponent

    Swift River Energy
  • Authorities

    • Transport Canada
  • Assessment Type

    Screening-type assessment under CEAA 1992
  • Reference Number

    46531