In support of the new Impact Assessment Act, the Impact Assessment Agency of Canada has redesigned and implemented a new Canadian Impact Assessment Registry. Learn more about the new Registry.

Search Registry

Registry Search Mobile

Registry Search

Skip to Filters

245 results

Project Alexis Nakota Sioux Nation 1993 Spill Remediation Project

  • Location (Alexis Nakota Sioux Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80203
  • Last Modified: 2019-10-09
  • Pembina Pipeline Corporation is proposing to remediate an area with confirmed residual petroleum hydrocarbon impacts located within a Pembina right-of way crossing Alexis Nakota Sioux Nation. The remedial plan is to excavate and transport contaminated soils for off-Site disposal at an approved licensed facility, backfill the excavation with clean, suitable fill material, complete surface reclamation and install a groundwater monitoring network.

Project Sachigo Lake First Nation Water Treatment Project

  • Location (Sachigo Lake First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80196
  • Last Modified: 2019-10-06
  • The Sachigo Lake First Nation has a water treatment system which is nearing the end of it's usable life and requires updating/replacing to meet water demand in design year 20. The existing WTP building also requires updating, and repairs. A new Genset unit is also required as a backup source of power for the WTP in the event of a power failure in the community. New lift pumps will be installed in the raw water wet well.

Project Sachigo Lake First Nation Wastewater Treatment Project

  • Location (Sachigo Lake First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80192
  • Last Modified: 2019-10-05
  • The Sachigo Lake First Nation has a facultative wastewater treatment lagoon which requires upgrading to meet the current and future organic and hydraulic loading from the community to design year 20. The existing lagoon cells will be combined into one primary cell, and a new storage cell will be constructed utilizing insitu and reworked soils from the site excavation. The lagoon would also require a new perimeter fence, intercell and discharge piping, a concrete spillway and rip rap stone. In

Project Webequie Supply Road Project

  • Location (McFaulds Lake area - Eastern limit, Ontario) (Webequie First Nation - Western limit)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80183
  • Last Modified: 2019-09-17
  • Webequie First Nation is proposing the construction and operation, including maintenance, of a 107-kilometre all-season road connecting the Webequie Airport and the McFaulds Lake area in northern Ontario. The corridor would be approximately 35 metres in width in order to accommodate a two-lane gravel surface industrial supply road and could enable future infrastructure development such as transmission lines and broadband. As proposed, the Webequie Supply Road Project would connect Webequie

Project Marten Falls Community Access Road Project

  • Location (Marten Falls, Ontario) (Northern end of Painter Lake forestry road)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80184
  • Last Modified: 2019-09-17
  • Marten Falls First Nation is proposing the construction and operation, including maintenance, of an all-season multi-use community access road approximately 140 to 250 kilometres in length, connecting the northern end of Painter Lake forestry road to the community of Marten Falls. Marten Falls is located at the junction of the Albany and Ogoki rivers, approximately 170 kilometres northeast of Nakina, Ontario. As proposed, the Marten Falls Community Access Road Project could

Project Lowering of the local groundwater table

  • Location (Nutashkuan, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80206
  • Last Modified: 2019-09-16
  • The project consists of the installation of rain chambers over approximately 835 m along Highway 138 to increase water retention and thus lower the local groundwater table. Gravity pipes will be installed from lot 5 356 265 (Quebec cadastre) on Route 138 to the Gulf, totalling approximately 530 m. The project also includes the addition of an outlet to the Gulf of St. Lawrence.

Project Grassy Mountain Coal Project

  • Location (Southwest Alberta, approximately 7 kilometres north of Blairmore, Alberta)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 80101
  • Last Modified: 2019-09-12
  • Benga Mining Limited, a wholly owned subsidiary of Riversdale Resources Limited, is proposing to construct and operate an open-pit metallurgical coal mine near the Crowsnest Pass, approximately seven kilometres north of the community of Blairmore, in southwest Alberta. As proposed, the production capacity of the project would be a maximum of 4.5 million tonnes of clean coal per year, over a mine-life of about 25 years.

Project Thunderchild Wellness Centre

  • Location (Thunderchild Wellness Centre, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80204
  • Last Modified: 2019-09-11
  • The proposed project will construct an approximately 90,000 square foot community Wellness Center that will meet the needs of the Thunderchild First Nation as well as the surrounding communities. The Center will include a dental office, a family physician, a pharmacy, social and childcare services (this includes non-for-profit daycare services), a full-sized ice surface, a field house, and a concession stand. The second floor of the center will be built to accommodate a variety of events such

Project Green Electron Natural Gas Power Generation Project

  • Location (St. Clair Township, Ontario)
  • Assessment Type: Assessment not applicable
  • Status: Completed
  • Reference Number: 80023
  • Last Modified: 2019-09-11
  • Greenfield South Power Corporation proposes the construction, operation and decommissioning of a single new, combined cycle, natural gas fuelled, electricity generating plant in St. Clair Township Ontario at one of two sites being considered near the intersection of Oil Springs Line and Greenfield Road (the "East Site" and the "West Site"). After evaluating both candidate sites, the proponent will select which one it wishes to proceed with on the basis of the most favourable

Project Cando Sturgeon Rail Terminal Project

  • Location (Sturgeon County, Alberta)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80167
  • Last Modified: 2019-09-11
  • Cando Rail Services Ltd. is proposing the construction and operation of a rail car storage yard located in Sturgeon County, Alberta. As proposed, the Cando Sturgeon Rail Terminal Project will provide additional rail capacity to Alberta's Industrial Heartland and includes a loop track and 32 yard tracks, with the option for an additional 32 yard tracks in the future, and associated infrastructure including a storm water management system.

Project Range and Training Area - Thunder Bay Region

  • Location (Upsala, Ontario)
  • Assessment Type: Assessment not applicable
  • Status: Completed
  • Reference Number: 80009
  • Last Modified: 2019-09-11
  • The Department of National Defence proposes the construction and operation of a new Range and Training Area to provide a weapons marksmanship and training facility for the Canadian Army and Royal Canadian Navy Reserve personnel located in Thunder Bay, Ontario. The proposed parcel of land to be leased is a privately owned former timber land tract located approximately 15 km east of Upsala, Ontario. The establishment of a new Range and Training Area will require the construction of range

Project Artificial Turtle Nest Site Creation

  • Location (Thousand Islands National Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80202
  • Last Modified: 2019-09-09
  • In an effort to reduce road mortality and nest predation for rare turtles, Thousand Islands National Park is planning to build a small artificial nesting site near Polly Creek. The site will be approximately 5m x 5m large and 1m deep, consisting of sand and gravel surrounded by cedar logs. Turtles in the area are experiencing significant road mortality and are primarily nesting on road shoulders where near complete nest predation has been documented. The artificial nest site should reduce the

Project SaskPower Transformer Salvage

  • Location (Prince Albert National Park, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80201
  • Last Modified: 2019-09-06
  • SaskPower is proposing to salvage a pad mount transformer and abandon an underground cable in Prince Albert National Park. The equipment was used at a Boreal Ecological Research Monitoring Station which was discontinued in the winter of 2018. The infrastructure of the monitoring station is being removed in order to rehabilitate the site. Equipment that is expected to be used for the salvage project includes: a digger truck, back-hoe, and crew trucks. Access to the site and infrastructure will

Project Astotin Lake Dock Replacement

  • Location (Elk Island National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80200
  • Last Modified: 2019-09-06
  • Elk Island National Park plans to replace the current floating dock on Astotin Lake (in the Astotin Lake Day Use Area) with a new permanent structure. The current floating dock does not provide adequate stability for all users, and has to be removed from teh lake every fall. The plan is to have a contractor install 12-14 helical piles in the water in January/February, working on the lake ice. Elk Island National Park staff would install the eight foot by 40-50 foot dock on the piles in

Project Newfoundland Orphan Basin Exploration Drilling Project

  • Location (343 to 496 kilometres northeast of St. John's, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80147
  • Last Modified: 2019-09-06
  • BP Canada Energy Group ULC is proposing to conduct an exploration drilling project within offshore exploration licences in the Orphan Basin, located 343 to 496 kilometres northeast of St. John's, Newfoundland and Labrador in the Atlantic Ocean. As proposed, the Newfoundland Orphan Basin Exploration Drilling Project would allow the proponent, over a nine-year period, to determine the presence, nature, and quantities of the potential hydrocarbon resource in exploration licences 1145,

Project NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project

  • Location (Grande Prairie, Alberta) (Rocky Mountain House)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80153
  • Last Modified: 2019-09-06
  • NOVA Gas Transmission Limited (NGTL), a wholly owned subsidiary of Trans Canada, has filed an application for the 2021 NGTL System Expansion Project. NGTL proposes to build and operate approximately 344 km of 1,219 mm (NPS 48) outside diameter natural gas pipeline and associated facilities in northwestern Alberta. If approved, the project would "loop" or add new pipeline parallel or adjacent to, the existing NGTL System. The Project includes three main areas: Grande Prairie West

Project Couchiching Lock 42 and Bridge 56 Rehabilitation

  • Location (Trent-Severn Waterway National Historic Site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80189
  • Last Modified: 2019-09-06
  • Lock 42 The work involves installing cofferdam structures upstream and downstream of the lock, dewatering of the lock and approaches, removal of damaged concrete, concrete repair, landscaping upon project completion and related project activities such as creating staging areas and use of machinery. Lock work to take place in the fall/winter between navigation season - after the Thanksgiving weekend in October and prior to the Victoria Day weekend in May. Bridge 56 The project is a complete

Project Edson Mainline Expansion Project

  • Location (Drayton Valley, Alberta) (Rocky Mountain House)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80173
  • Last Modified: 2019-09-05
  • NOVA Gas Transmission Ltd. (NGTL) is applying to the National Energy Board under section 52 of the National Energy Board Act for approval to construct and operate the Edson Mainline Expansion Project (the Project) in Alberta.  The Project consists of two sections of 1,219 mm (nominal pipe size 48) natural gas pipeline, including the 40.2 km long Elk River Section and the 44.7 km long Alford Creek Section, and associated facilities.  The associated facilities include three mainline

Project North Corridor Expansion Project

  • Location (Bear Canyon, Alberta) (Chin Inn Open Camp) (Highway 741) (Highway 88) (Peerless Lake) (Range Road 131A) (Township Road 940)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80176
  • Last Modified: 2019-09-05
  • NOVA Gas Transmission Ltd. (NGTL) is applying to the National Energy Board under section 52 of the National Energy Board Act for approval to construct and operate the North Corridor Expansion Project (the Project) in Alberta.  The Project consists of three natural gas pipelines: two sections of 1,219 mm (nominal pipe size 48 inch), including the 24 km long North Star Section 2 and the 32 km long Red Earth Section 3, and a third section of 1,219 mm (nominal pipe size 36 inch) which is 25 km

Project Griffith Iron Ore Redevelopment Project

  • Location (Ear Falls, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80035
  • Last Modified: 2019-09-03
  • Lithium Energy Products Inc. (formerly Northern Iron Corporation) proposes the redevelopment of the former Griffith Mine within the Township of Ear Falls in northwestern Ontario. The Project would involve the construction, operation, and decommissioning of a past-producing open pit iron ore mine. The proposed project would produce approximately 16,000 tonnes of ore per day, with a mine life of approximately 20 years. The iron ore would be milled on-site to produce slightly more than 4,000

Project Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector

  • Location (Port of Quebec Beauport Sector (North Shore), Quebec)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80107
  • Last Modified: 2019-08-29
  • The Quebec Port Authority is proposing to extend eastward by 610 metres the existing wharf in order to be able to add two deep-water berths to its bulk transport facilities in the Beauport sector. The project would include the filling of the area behind the wharf and the construction of a containment dyke to create 17.5 hectares of additional area for the development of equipment for material handling, transshipment and container storage, the extension of an existing railway track on the Port

Project Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)

  • Location (Carling, Ontario)
  • Assessment Type: Screening-type assessment under CEAA 1992
  • Status: Terminated
  • Reference Number: 65457
  • Last Modified: 2019-08-28
  • The Minister of the Environment has designated this project and the environmental assessment will continue under the former Canadian Environmental Assessment Act. The Ontario Ministry of Transportation (MTO) is undertaking a 102 km capacity expansion initiative along Highway 69 from north of Highway 559 to Murdock River. The 102 km initiative as proposed by MTO consists of five separate project phases, each of which is undergoing a separate federal environmental assessment screening.

Project Route 389 Improvement Project between Fire Lake and Fermont

  • Location (Fermont, Quebec) (Fire Lake)
  • Assessment Type: Comprehensive study under CEAA 1992
  • Status: Completed
  • Reference Number: 66250
  • Last Modified: 2019-08-28
  • Projects that were undergoing a comprehensive study at the time the provisions of the Canadian Environmental Assessment Act, 2012 came into force will continue to follow the requirements of the former Act. Under the former Act, the Canadian Environmental Assessment Agency is responsible for conducting the comprehensive study of this project. The proposed project consists of improving Route 389 between Fire Lake and Fermont (kilometres 478 to 564) in order to increase

Project Joyce Lake Direct Shipping Iron Ore Project

  • Location (Labrador (approximately 20 km northeast of Schefferville, QC), Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80015
  • Last Modified: 2019-08-28
  • Labec Century Iron Ore is proposing the construction, operation and decommissioning of an open-pit iron ore mine located approximately 20 kilometres northeast of Schefferville, Quebec in Newfoundland and Labrador. As proposed, the mine would produce up to an estimated 2.5 million tons of ore per year over a life span of seven years. The ore would be transported by truck to the existing rail owned by Tshiuetin Rail Transportation Inc. for transportation to the Port of Sept-Îles, where it would

Project Carbon Creek Metallurgical Coal Mine Project

  • Location (Chetwynd, British Columbia)
  • Assessment Type: Environmental assessment by substitution under CEAA 2012
  • Status: In progress
  • Reference Number: 80028
  • Last Modified: 2019-08-28
  • Cardero Coal Ltd proposes to develop and operate an open pit metallurgical coal mine located approximately 60 kilometres northwest of Chetwynd and 40 kilometres west of Hudson's Hope, in northeast British Columbia. The proposed project would involve open pit surface mining followed by combined open pit and underground mining. The production rate would be 4.1 million metric tonnes of metallurgical coal per year, over a mine life of 20 years.

Project Arctos Anthracite Project

  • Location (Iskut, Stewart, Hazelton, British Columbia)
  • Assessment Type: Environmental assessment by substitution under CEAA 2012
  • Status: In progress
  • Reference Number: 80040
  • Last Modified: 2019-08-28
  • Arctos Anthracite Joint Venture proposes the construction, operation and decommissioning of an anthracite coal mine in northwestern British Columbia. The site of the proposed mine is about 90 kilometres southeast of Iskut, 160 kilometres northeast of Stewart, and 240 kilometres north of Hazelton. The proposed project would produce about 3 million tonnes per year of anthracite coal over a mine life of approximately 25 years.The proposed project would also include constructing a 147 kilometre

Project Spanish Mountain Gold Mine Project

  • Location (Likely, British Columbia)
  • Assessment Type: Comprehensive study under CEAA 1992
  • Status: Terminated
  • Reference Number: 63917
  • Last Modified: 2019-08-28
  • Projects that were undergoing a comprehensive study at the time the provisions of the Canadian Environmental Assessment Act, 2012 came into force will continue to follow the requirements of the former Act. Under the former Act, the Canadian Environmental Assessment Agency is responsible for conducting the comprehensive study of this project. Spanish Mountain Gold Ltd. is proposing to construct and operate the Spanish Mountain Gold Mine Project, approximately 70 kilometres northeast of

Project Morrison Copper-Gold Project

  • Location (Granisle, British Columbia)
  • Assessment Type: Comprehensive study under CEAA 1992
  • Status: Terminated
  • Reference Number: 48445
  • Last Modified: 2019-08-28
  • Projects that were undergoing a comprehensive study at the time the provisions of the Canadian Environmental Assessment Act, 2012 came into force will continue to follow the requirements of the former Act. Under the former Act, the Canadian Environmental Assessment Agency is responsible for conducting the comprehensive study of this project. Pacific Booker Minerals Inc. is proposing the construction and operation of an open pit copper-gold-molybdenum mine, located approximately 65 kilometers

Project Klinaklini Hydroelectric Project

  • Location (Klinaklini River, British Columbia)
  • Assessment Type: Comprehensive study under CEAA 1992
  • Status: Terminated
  • Reference Number: 36321
  • Last Modified: 2019-08-28
  • Projects that were undergoing a comprehensive study at the time the provisions of the Canadian Environmental Assessment Act, 2012 came into force will continue to follow the requirements of the former Act. Under the former Act, the Canadian Environmental Assessment Agency is responsible for conducting the comprehensive study of this project. Kleana Power Corporation proposes to develop a run-of-river hydroelectric power project on the Klinaklini River on the mainland coast of British

Project Eagle's Nest Project

  • Location (Ring of Fire, Ontario)
  • Assessment Type: Comprehensive study under CEAA 1992
  • Status: Terminated
  • Reference Number: 63925
  • Last Modified: 2019-08-28
  • Projects that were undergoing a comprehensive study at the time the provisions of the Canadian Environmental Assessment Act, 2012 came into force will continue to follow the requirements of the former Act. Under the former Act, the Canadian Environmental Assessment Agency is responsible for conducting the comprehensive study of this project. Noront Resources Ltd. is proposing the construction, operation, decommissioning and abandonment of an underground nickel-copper-platinum multi-metal

Project Elmtree Property Gold Mine

  • Location (Dauversière, New Brunswick)
  • Assessment Type: Comprehensive study under CEAA 1992
  • Status: Terminated
  • Reference Number: 61036
  • Last Modified: 2019-08-28
  • Projects that were undergoing a comprehensive study at the time the provisions of the Canadian Environmental Assessment Act, 2012 came into force will continue to follow the requirements of the former Act. Under the former Act, the Canadian Environmental Assessment Agency is responsible for conducting the comprehensive study of this project. Castle Resources Inc. is proposing to develop an open-pit gold mine located approximately 20 kilometres to the northwest of Bathurst, New Brunswick. The

Project Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)

  • Location (Harrison, Shawanaga, Wallbridge, Ontario)
  • Assessment Type: Screening-type assessment under CEAA 1992
  • Status: Terminated
  • Reference Number: 65415
  • Last Modified: 2019-08-28
  • The Minister of the Environment has designated this project and the environmental assessment will continue under the former Canadian Environmental Assessment Act. The Ontario Ministry of Transportation (MTO) is undertaking a 102 km capacity expansion initiative along Highway 69 from north of Highway 559 to Murdock River. The 102 km initiative as proposed by MTO consists of five separate project phases, each of which is undergoing a separate federal environmental assessment screening.

Project Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)

  • Location (Wallbridge, Ontario)
  • Assessment Type: Screening-type assessment under CEAA 1992
  • Status: Terminated
  • Reference Number: 65417
  • Last Modified: 2019-08-28
  • The Minister of the Environment has designated this project and the environmental assessment will continue under the former Canadian Environmental Assessment Act. The Ontario Ministry of Transportation (MTO) is undertaking a 102 km capacity expansion initiative along Highway 69 from north of Highway 559 to Murdock River. The 102 km initiative as proposed by MTO consists of five separate project phases, each of which is undergoing a separate federal environmental assessment screening.

Project Corridor Resources Inc. Drilling of an Exploration Well on the Old Harry Prospect - EL 1153 (previously EL 1105)

  • Location (Gulf of St-Lawrence, Newfoundland and Labrador)
  • Assessment Type: Screening-type assessment under CEAA 1992
  • Status: Terminated
  • Reference Number: 60633
  • Last Modified: 2019-08-28
  • The Minister of the Environment has designated this project and the environmental assessment will continue under the former Canadian Environmental Assessment Act. Corridor Resources Inc. is proposing to drill one exploration well within Exploration Licence (EL) 1105 on a subsea geological structure called Old Harry in the Newfoundland and Labrador offshore. The exploratory well is anticipated to be drilled between 2012 and 2014. Exploration wells are beneficial in evaluating the resource

Project St. Lawrence Fluorspar Marine Shipping Terminal Project

  • Location (Mine Cove, Little Lawn Harbour, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80179
  • Last Modified: 2019-08-28
  • Canada Fluorspar (NL) Inc. is proposing the construction, operation, decommissioning and reclamation of a marine shipping terminal located in Mine Cove, Little Lawn Harbour, along the western border of the Town of St. Lawrence, Newfoundland and Labrador. As proposed, the St. Lawrence Fluorspar Marine Shipping Terminal Project would allow for the exportation of 200,000 tonnes of acid-grade fluorspar concentrate and 2 million tonnes of construction aggregate per year. The project

Project Énergie Saguenay Project

  • Location (District of La Baie, Saguenay City, Quebec)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80115
  • Last Modified: 2019-08-21
  • GNL Québec Inc. is proposing the construction and operation of a natural gas liquefaction (LNG) facility and export terminal located in the District of La Baie, Saguenay City, Quebec. The site of the project is located near the Grande-Anse marine terminal (Port of Saguenay). The main infrastructures are the natural gas liquefaction facilities with a production capacity of 11 million tons per year, port infrastructures for marine tanker loading of LNG, LNG storage tanks and support

Project BHP Canada Exploration Drilling Project

  • Location (325 kilometres northeast of St. John's, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80174
  • Last Modified: 2019-08-21
  • BHP Petroleum (New Ventures) Corporation is proposing to conduct an exploration drilling project within offshore exploration licences in the Orphan Basin, located 325 kilometres northeast of St. John's, Newfoundland and Labrador in the Atlantic Ocean. As proposed, the BHP Canada Exploration Drilling Project would allow the proponent, over a nine-year period, to determine the presence, nature, and quantities of the potential hydrocarbon resource in exploration licences 1157 and 1158.

Project Tilt Cove Exploration Drilling Project

  • Location (300 kilometres southeast of St. John's, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80177
  • Last Modified: 2019-08-21
  • Suncor Energy Inc. is proposing to conduct an exploration drilling project within an offshore exploration licence in the Jeanne d'Arc Basin, located approximately 300 kilometres southeast of St. John's, Newfoundland and Labrador in the Atlantic Ocean. As proposed, the Tilt Cove Exploration Drilling Project would allow the proponent, over a nine-year period, to determine the presence, nature, and quantities of the potential hydrocarbon resource in exploration licence 1161.

Project West Flemish Pass Exploration Drilling Project

  • Location (375 kilometres northeast of St. John's, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80161
  • Last Modified: 2019-08-21
  • Chevron Canada Limited is proposing to conduct an exploration drilling project within its exploration licence in the Flemish Pass, located approximately 375 kilometres northeast of St. John's, Newfoundland and Labrador, in the Atlantic Ocean. As proposed, the West Flemish Pass Exploration Drilling Project would allow the proponent to determine the presence, nature, and quantities of the potential hydrocarbon resource in exploration licence 1138.

Project Bending Lake Iron Project

  • Location (49 kilometres southwest of Ignace, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80181
  • Last Modified: 2019-08-21
  • Ambershaw Metallics Inc., a subsidiary of Legacy Hill Resources, is proposing the construction, operation, decommissioning and abandonment of an open-pit iron ore mine and an on-site metal mill, located 49 kilometres southwest of Ignace, Ontario. As proposed, the Bending Lake Iron Project would have a 30- to 40-year mine life with an ore production capacity of 23,000 tonnes per day. The metal mill would have an ore input capacity of 25,000 tonnes per day.

Project Kitimat LNG Expansion Project

  • Location (Bish Cove, British Columbia)
  • Assessment Type: Environmental assessment by substitution under CEAA 2012
  • Status: In progress
  • Reference Number: 80180
  • Last Modified: 2019-08-20
  • KM LNG Operating General Partnership is proposing to expand the Kitimat LNG Project (archived Registry reference number 05-03-10430), a liquefied natural gas (LNG) production and marine export facility located at Bish Cove, near Kitimat, British Columbia. As proposed, the Kitimat LNG Expansion Project would increase the facility's LNG production capacity by more than 50%, to 18 million tonnes per year. The expansion would include the addition of a third LNG train, a

Project Deep Geologic Repository Project for Low and Intermediate Level Radioactive Waste

  • Location (Bruce Nuclear Site, Ontario)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 17520
  • Last Modified: 2019-08-20
  • The project is a proposal by Ontario Power Generation (OPG) to prepare, construct and operate a deep geologic disposal facility on the Bruce Nuclear Site within the municipality of Kincardine, Ontario. The DGR would be designed to manage low and intermediate waste produced from the continued operation of OPG-owned nuclear generations at Bruce, Pickering and Darlington, Ontario.

Project Goliath Gold Project

  • Location (Dryden, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80019
  • Last Modified: 2019-08-19
  • Treasury Metals Inc. is proposing the construction, operation, decommissioning, and abandonment of an open-pit and underground gold mine and associated infrastructure. The proposed mine, located 20 kilometres east of the City of Dryden, Ontario, would have an ore production capacity of 5,424 tonnes per day and an ore input capacity of 3,240 tonnes per day with an anticipated mine and mill life of 12 years. Over the 12 years of operations, the average ore production and

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: