Document Notice of Determination
- Project Amendment to the construction hours in respect to condition 15 of the approved Golden Ears Forcemain (GDEFM) (PER No. 20-163)
- Document Category: Additional Information
- Reference Number: 2
- Updated: 2022-11-30
- Document: 145822E.html
- Relevance: 388.63
- Notice of Determination Maple Ridge, B.C. – November 30, 2022– The Vancouver Fraser Port Authority has determined that the proposed amendment to the construction hours in respect to condition 15 of the approved Golden Ears Forcemain (GDEFM) (PER No. 20-163) located at approximately 250 metres west of the Golden Ears Bridge is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: Impacts on rights of ...
1 alternate format found
French HTML
- Relevance: 337.63
- Avis de détermination Maple Ridge, C.-B. – Le 30 novembre 2022 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de projet de modification des heures de construction en ce qui concerne la condition 15 du projet approuvé de conduite de refoulement de Golden Ears (GDEFM) (permis PER nº 20-163) situé à environ 250 mètres à l'ouest du pont Golden Ears, n'est pas susceptible d'entraîner des effets néfastes importants pour l'environnement. Cette détermination a été ...