Lumber Transload Facility and Rail Spur - Amendment

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Lumber Transload Facility and Rail Spur
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-08-03
  • Document: 144820E.html
  • Relevance: 388.04
  • Notice of Determination  Surrey, B.C. –August 3, 2022– The Vancouver Fraser Port Authority has determined that the proposed project amendment Lumber Transload Facility and Rail Spur located at 10880 Dyke Road, Surrey, B.C. is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors:  Impacts on rights of Indigenous ...
1 alternate format found
French HTML
  • Relevance: 337.04
  • Avis de détermination  Surrey, C.-B. – Le 3 août 2022 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de projet de modification de l'installation de transbordement de bois d'œuvre et de l'embranchement de voie ferrée situé au 10880, route Dyke, à Surrey (C.-B.), n'est pas susceptible d'entraîner des effets ...

Document Lumber Transload Facility and Rail Spur - Public comments invited

  • Project Lumber Transload Facility and Rail Spur
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2022-06-16
  • Document: 144147E.html
  • Relevance: 382.99
  • Public notice  Lumber Transload Facility and Rail Spur – Public comments invited  June 16, 2022 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Lumber Transload Facility and Rail Spur, located at 10880 Dyke Road, Surrey, B.C., are likely to cause significant adverse environmental effects. Written comments to be received by July 15, 2022.  To help inform this determination and a decision on whether or not to ...
1 alternate format found
French HTML
  • Relevance: 331.99
  • Avis public  Installation de transbordement de bois d'œuvre et embranchement de voie ferrée – Le public est invité à formuler des commentaires.  Le 16 juin 2022 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si la proposition d'installation de transbordement de bois d'œuvre et l'embranchement de voie ferrée, située au 10880, route Dyke, à Surrey (C.-B.), est susceptible d'entraîner des effets ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: