Search Registry

Registry Search Mobile

Registry Search

Skip to Filters

823 results

Project The Modernized Gatineau Energy Centre (MGEC)

  • Location (The Modernized Gatineau Energy Centre, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84074
  • Last Modified: 2022-11-26
  • Relevance: 799.7
  • The Modernized Gatineau Energy Centre (MGEC) is a deeper greening project initiated under the Energy Services Acquisition Program (ESAP) to modernizing the District Energy System, which provides heating services to over 80 buildings and cooling services to nearly 70 buildings in the National Capital Region. The MGEC project is a demonstration of the Government of Canada leading by example in the context of climate change, by making its own operations greener and adopting technologies that ...

Project Zagime Anishinabek Solid Waste Transfer Station

  • Location (Sakimay IR 74, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84130
  • Last Modified: 2022-11-25
  • Relevance: 799.66
  • The Proposed Project - Construction of a solid waste transfer station site to be located on NW 1/4 - Sec 16 - Twp 18 - Rge 06 - W2M. The proposal includes earthen fill unloading ramp, lock block retaining walls, concrete pads, fencing and vehicle stops, fenced areas for recyclable and hazardous waste sorting; - Construction of an attendant building / garage to store the collection truck or skidsteer; - Construction of an approach / access road; Solid waste transfer station site is ...

Project Construction of Two Bridge Files in Saddle Lake Cree Nation

  • Location (Construction of Two Bridge Files in Saddle Lake Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84128
  • Last Modified: 2022-11-25
  • Relevance: 799.66
  • The proposed project will involve resizing (increased diameter) and replacing two culverts along the NS Road, the main arterial road on the Nation. The culverts convey water from Stony Creek and Saddle Lake Creek, respectively. The upsizing of culverts will allow a greater quantity of flow to pass safely under the roadway during high precipitation periods and snow melt season. The upsizing of culverts will allow the continued use of the NS Road for all users including essential services. This ...

Project Sucker River Water Treatment Plant Upgrade

  • Location (Sucker River IR 156C, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84129
  • Last Modified: 2022-11-25
  • Relevance: 799.66
  • The Project consists of an upgrade to the existing water treatment plant (WTP), at Sucker River located in NE 33-72-21 W2M. The upgrade will decrease the use of disinfection-by-products (DBP's) at the plant, and provide capacity for future growth (10 years) in the community. The existing treatment process has difficulty effectively reducing the level of dissolved organic carbon from raw water, which is reacting with free chlorine during the disinfection process and creating higher than ...

Project Rock Wall, Boat slip and Wharf Construction, Bridgewater, NS

  • Location (Bridgewater, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84127
  • Last Modified: 2022-11-25
  • Relevance: 799.65
  • The proposed project will involve the construction of a rock wall, boat slip and wharf along the LaHave River in Bridgewater, Nova Scotia, for personal recreational use. Land-based machinery will be used to construct the new rock wall for shoreline protection that will be approximately 50.3 m along the shoreline and 0.61 m wide. All work related to the rock wall will be above the ordinary high water mark (OHWM). The boat slip and wharf and crib ties will be constructed on land and moved into ...

Project Membertou Realty Expansion - Proposed Gas Bar, Car Wash, Restaurant

  • Location (Membertou First Nation, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84126
  • Last Modified: 2022-11-25
  • Relevance: 799.65
  • Activities include the construction of a gas bar/convenience store, restaurant and car wash facility. The project covers a total site area of 2.01 acres, and includes site development and 2 buildings, plus all infrastructure required for the gas station. Total floor area of new buildings is 3975 sq. ft. All new permanent infrastructure for the project includes site services (water, sewer, storm), and overhead and underground power distribution and communications. The fuel storage/delivery ...

Project St. Mary's First Nation - Court A Development

  • Location (St. Mary's First Nation, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84125
  • Last Modified: 2022-11-25
  • Relevance: 799.65
  • The project consists of two jobsites adjacent to Nash Avenue and are located approximately 230m from one another. Sanitary and storm sewer, water and roadway services will be installed to facilitate the construction of 5 tiny homes, 2 rowhouses (consisting of 5 units each), 7 detached homes, and a traditional learning center for school children. The total project footprint is 21,250m2. Activities include the development of 315m of water main, 158m of sanitary sewer main and 163m of storm ...

Project Xplore Inc. Radiocommunication New Tower Proposals on the Stony No. 142-143-144 Reserve, Morley, AB 6318 Forestry Trunk Road

  • Location (Morley, AB 6318 Forestry Trunk Road, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84097
  • Last Modified: 2022-11-25
  • Relevance: 799.64
  • Spectrum Management Operations Branch: Xplore Inc. is proposing the installation of new radiocommunication towers with antennas, for a microwave radio communication links on the following proposed towers which are 30 meters in height and located on the Stony No. 142-143-144 Reserve: AB 6318 Forestry Trunk Road are mounted at 20m on proposed radiocommunication tower. All installations will include a 0.61m diameter microwave antennas. Each system will carry  high capacity ...

Project Revitalization of the Newport Fishing Harbour - Gaspésie, Québec

  • Location (Newport Fishing Harbour, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83778
  • Last Modified: 2022-11-25
  • Relevance: 799.63
  • The harbour revitalization project is divided into four components, which will be the focus of the impact assessment. Component 1 will increase the harbour's mooring capacity by constructing a new wharf in the beach area - west of the coastal wharf (#402). In addition to this work, the project will require dredging to provide sufficient depth in front of the new wharf (component 2) and on the east side of wharf #402. At the same time, component 3 will include the construction of a dike ...

Project Freshwater Brook Bridge Replacement - Kensington Cove Road, Fortress of Louisbourg

  • Location (Fortress of Louisbourg National Historic Site of Canada, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83734
  • Last Modified: 2022-11-24
  • Relevance: 799.55
  • This project calls for the complete replacement of the Freshwater Brook Bridge. The new structure will likely include a Precast Rigid Frame 11.59 m span. The final road elevation will be raised to accommodate the new structure. Support features include a control rock weir upstream of the bridge to maintain the water level in the wetland while accommodating fish passage. Some upgrades to channel bottom through the will allow for improved fish passage. The new shape involves a pool-riffle-run ...

Project White Head Harbour Timber Wharf (Structure # 401) Repairs

  • Location (White Head Harbour SCH is located at 147 White Head Road, Charlotte County on the southwest shore of White Head Island, N.B., New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84123
  • Last Modified: 2022-11-24
  • Relevance: 799.55
  • Structure 401, the primary public wharf infrastructure in White Head Harbour, is advancing in age, and due to obvious subsidence of two sections of its deck, a structural assessment was carried out in order to assess its current condition. Inspection of Structure 401 identified failure of the south end of the bottom cribwork portion due to undermining of the timber crib. Severe deterioration of the bolted connections, loss of horizontal face timbers and decay of crosstie member ...

Project Kegaska - Deconstruction of the former Fish plant and two related buildings

  • Location (Kegaska wharf, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83266
  • Last Modified: 2022-11-24
  • Relevance: 799.54
  •   A fish plant as well as two smaller buildings, a small building for a generator and a shed for waste are present on the Transport Canada (TC) property in Kegaska. This fish plant has not been in operation for several years. This plant did not initially belong to TC, however, efforts were carried out by TC in 2015, with the help of Justice Canada, to identify the owners of these three buildings that had not been regularized. As no entity claimed ownership, a Deed of Abandonment was ...

Project Cap-aux-Meules Wharf - Defense system upgrade at commercial docks no. 2 and 11

  • Location (Cap-aux-Meules Wharf, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84122
  • Last Modified: 2022-11-24
  • Relevance: 799.54
  • The Cap-aux-Meules Wharf is an important infrastructure for the Îles-de-la-Madeleine Islands region. It includes the facilities of the ferry service which provides the maritime link between Cap-aux-Meules (Quebec) and Souris (Prince Edward Island) for the transport of passenger vehicles, trucks, commercial vehicles, and other road vehicles, as well as bicycles and pedestrians. The current project aims to upgrade the docking fenders system and is divided into two sectors of intervention, ...

Project Sediment rehabilitation and demolition of Miguasha wharf, Quebec

  • Location (Miguasha wharf, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83056
  • Last Modified: 2022-11-24
  • Relevance: 799.53
  • The project components include the demolition of the wharf, the removal of the riprap located at the end of the wharf as well as the steel sheet piles, the dolfins, the wooden casings and the concrete walls. Depending on the results of the sediment environmental characterization and the requirements related to their environmental quality, sediment rehabilitation could be carried out by excavation. The goal is to remove existing structures and remove potential contamination to meet environmental ...

Project Demolition of the seaplane dock in La Romaine, Quebec

  • Location (La Romaine, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83366
  • Last Modified: 2022-11-24
  • Relevance: 799.53
  • The La Romaine seaplane dock is located approximately 2 km east of the La Romaine commercial dock, both of which are owned by Transport Canada.  This wharf has not been used by seaplanes for several years and its condition is very deteriorated.  It serves as wave protection for a municipal boat launch built next to it, used by residents of La Romaine and the Innu community of Unamen Shipu.  The dock consists of a riprap approach with a boardwalk installed on top, and ...

Project PCA Forty Mile Prescribe Fire

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84105
  • Last Modified: 2022-11-24
  • Relevance: 799.52
  • Parks Canada is proposing to complete a 3721 ha prescribed fire located directly to the north of Mt. Norquay within the Forty Mile Creek drainage in Banff National Park. The objective of this prescribed fire is to achieve agency ecological integrity objectives and restore historical fire regimes. The prescribed fire will occur in spring or early fall when conditions meet prescription and may be completed as early as 2023.

Project Exposed Water Pipe Burial Request as a Result of Hurricane Fiona

  • Location (Sable Island National Park Reserve of Canada, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84067
  • Last Modified: 2022-11-24
  • Relevance: 799.48
  • To the East of the existing Water Treatment Building is a cut of sand that was deepened by Hurricane Fiona. This cut exposed the main water pipe supplying all of Main Station. The purpose of this project is to move sand that is accumulating around the existing Water Treatment Building and to deposit it on top of the water pipe to protect it from the cold. The preferred location where the sand might be removed is the South, in front of the door. The sand that is planned to be moved was deposited ...

Project Boardwalk Enhancement at Baxter Conservation Area; Phase 2 - Installation of new boardwalk sections and viewing platforms

  • Location (Rideau Canal National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84066
  • Last Modified: 2022-11-24
  • Relevance: 799.48
  • The Rideau Valley Conservation Authority (RVCA) manages the Baxter Conservation Area, which is located on the shores of the Rideau Canal National Historic Site. RVCA is working towards making the 5 km of trails at Baxter Conservation Area fully accessible to people with disabilities. Baxter Conservation Area hosts 45,000 visitors per year of which 9,000 are students participating in the Outdoor Education classes. As part of the trail system, there is an existing boardwalk that crosses the mouth ...

Project AltaLink 54L Transmission Rebuild

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84121
  • Last Modified: 2022-11-23
  • Relevance: 799.44
  • AltaLink Management Ltd. has proposed a complete replacement of the existing 54L transmission line, within the existing right of way. The 54L transmission line runs from the Banff National Park east boundary to the AltaLink Banff 123s substation within the Town of Banff. The transmission line rebuild will improve electric reliability to Banff and lake Louise, increase durability with new structures, and improve fire resilience with weathered steel structures. Main proposed activities include: ...

Project Little Pine First Nation Lagoon Upgrade and Bridge over Battle River

  • Location (Little Pine IR No. 116, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83776
  • Last Modified: 2022-11-23
  • Relevance: 799.44
  • The project will include the construction of a new sewage lagoon , including common excavation, synthetic liner, and transfer piping.  The lagoon will be design and constructed to meet the 10 year design horizon, with practical considerations to allow for easy expansion to meet the 20 year design horizon, when appropriate.  Lagoon sizing is 3.45ha primary cell; 95,100 cubic meter storage cell.  The project will include a 200mm sewage forcemain of approximately 3,300 lin. m. in ...

Project Ontario Waterways- TSW- Pretty Channel Road Upgrade

  • Location (Trent-Severn Waterway National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84120
  • Last Modified: 2022-11-23
  • Relevance: 799.44
  • Parks Canada, Trent-Severn Waterway intends to utilize a portion of an existing road and hydro line corridor and to connect to the existing recreational trail to provide access for future dam rehabilitation and access for dam operations and maintenance. Portion of the proposed route pass through land owned by Hydro One, crown land managed by and Ministry of Northern Development, Mines, Natural Resources and Forestry (MNR) and a smaller portion of the Severn River Conservation Reserve. The ...

Project New Fibre Installation / Upgrade Multiple Towers

  • Location (Bearskin Lake PoP, Ontario) (Big Trout Lake PoP, Ontario) (Cat Lake PoP, Ontario) (Cat Lake Wireless Tower, Ontario) (Deer Lake PoP, Ontario) (Kasabonika Lake PoP, Ontario) (Kasabonika Lake Wireless Tower, Ontario) (Kewaywin PoP, Ontario) (Kingfisher Lake PoP, Ontario) (Muskrat Dam PoP, Ontario) (North Spirit Lake PoP, Ontario) (Pikangikum PoP, Ontario) (Pikangikum Fibre Cabinet, Ontario) (Poplar Hill PoP, Ontario) (Sachigo Lake PoP, Ontario) (Sandy Lake PoP, Ontario) (Slate Falls PoP, Ontario) (Wapekeka (Angling Lake) PoP, Ontario) (Wawakepewin PoP, Ontario) (Weagamow PoP, Ontario) (Wunnumin Lake PoP, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84118
  • Last Modified: 2022-11-23
  • Relevance: 799.43
  • Upgrade (Multiple) Towers Keewaytinook Okimakanak is proposing the addition of (3) 0.6m antennae, in the 5 GHz frequency band, mounted near the top of (2) existing 18m and 28m towers which are located on Cat Lake First Nation and Kasabonika First Nations. The antenna will be installed to improve network access to high-speed internet. In the future, the existing tower may have other antennas and other radiocommunication equipment added or replaced. New Fibre Installation Keewaytinook ...

Project Cavendish Campground Post-Fiona Recovery and Reinstatement

  • Location (Prince Edward Island National Park of Canada, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84119
  • Last Modified: 2022-11-23
  • Relevance: 799.42
  • Cavendish Campground, situated on the north shore of Prince Edward Island National Park, experienced downed trees, significant erosion, and damaged infrastructure resulting from Hurricane Fiona. This project will be carried out to clean-up debris and impacts from Hurricane Fiona in order to make the campground operational for the 2023 season. Vulnerable infrastructure within proximity to the northern coast will be decommissioned in anticipation of future storm events and natural erosion ...

Project WRFN New Lagoon and Septic Bed Assessment/Replacement Program

  • Location (Whitefish River First Nation, Ontario) (Whitefish River First Nation, Ontario) (Whitefish River First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 82815
  • Last Modified: 2022-11-23
  • Relevance: 799.41
  • The overall objective of this project is to design and support construction of a cost-effective new lagoon for the Whitefish River First Nation that meets all regulatory requirements. This includes the detailed design of all system components, including closure of the existing septage pit. Project Scope: Removal of the existing 150mm ductile iron watermain. Removal of deficient septic bed/field beds. Decommission existing septage pit (Cap pit). Installation of new 150mm PVC ...

Project West Breakwater Wharf Repairs at the Halls Harbour Fisheries and Oceans Canada Small Craft Harbour, Kings County, Nova Scotia

  • Location (Halls Harbour DFO-SCH, West Halls Harbour Road, Kings County, Nova Scotia, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84115
  • Last Modified: 2022-11-22
  • Relevance: 799.32
  • Fisheries and Oceans Canada – Small Craft Harbours (DFO-SCH) proposes to repair two voids within the existing west breakwater wharf structure at Halls Harbour DFO-SCH, Kings County, Nova Scotia. Ballast and armourstone have spilled from the northern end of the structure and a previously encapsulated cribwork wharf within the current structure has settled and created a void space between its deteriorated concrete deck and the current concrete deck. The void area measures approximately 7 ...

Project KLTP Temporary construction staging, parking and barge loading - Public comments invited

  • Location (KLTP Temporary construction staging, parking and barge loading, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84114
  • Last Modified: 2022-11-21
  • Relevance: 799.23
  • The proposed amendment  In 2018, the Vancouver Fraser Port Authority issued a project permit to Kiewit Ledcor TMEP Partnership for the construction of a temporary staging parking and barge loading facility at 2115 Commissioner Street Vancouver, which was valid until December 31, 2020. This site is being used to support the Westridge Marine Terminal Expansion. The permit scope includes the construction of the facility, as well as the eventual decommissioning including removal of all ...

Project Skidway Replacement at Main A Dieu Small Craft Harbour, Cape Breton County, NS

  • Location (Main A Dieu SCH is located in the community of Main A Dieu, Cape Breton County, Nova Scotia. It is accessible via Main A Dieu Road from Louisbourg Highway, egress from NS Highway 125., Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84062
  • Last Modified: 2022-11-21
  • Relevance: 799.15
  • The proposed harbour improvements project at Main A Dieu SCH,  Cape Breton County, will include the removal and replacement of a skidway. The new concrete skidway will be placed in the same location as the existing skidway, adjacent to the main wharf, but with an increased footprint of approximately 45 m2. The concrete skidway, measuring approximately 29 m in length and 13 m wide, will be constructed from an elevation of -1.00 m to an elevation of + 2.95 m. At the seaward end of the ...

Project WRFN Septic Bed Assessment/Replacement Program

  • Location (WRFN Septic Bed Assessment/Replacement Program, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84059
  • Last Modified: 2022-11-20
  • Relevance: 799.04
  • The project will replace and repair septic beds in the Whitefish River First Nation reserve in Ontario. The work will assess the condition and environmental impact of existing septic beds, replace 20 failing septic beds, repair 19 failing septic beds, replace 350 m of watermain, and decommission the existing septic pit.  The project will improve the capacity to treat and manage wastewater and extend the life of the assets.

Project Victoria Beach Hydrometric Stilling Well Removal - Winter 2023 - Public Comments Invited

  • Location (Victoria Beach Harbour, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83874
  • Last Modified: 2022-11-20
  • Relevance: 799.04
  • The hydrometric station "Lake Winnipeg at Victoria Beach (05SA003)" is located within the Victoria Beach Harbour at the East end of Lake Winnipeg. This is an active station which records hydrometric data under the administration of Environment and Climate Change Canada (ECCC) National Hydrological Services (NHS). National Hydrological Services is proposing to decommission an inactive creosote stilling well at this hydrometric station. The scope of this project includes complete ...

Project Second Narrows Water Supply Tunnel - Cathodic Protection

  • Location (Second Narrows Water Supply Tunnel - Cathodic Protection, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84063
  • Last Modified: 2022-11-19
  • Relevance: 798.93
  • The proposed project  Metro Vancouver is planning to install a cathodic protection system for the protection of Second Narrows Water Supply Pipelines. The project includes the installation of the cathodic system, which requires:   Trenching a teck cable upland (outside port authority jurisdiction) and laying approximately ten metres of teck cable on the sea floor (within port authority jurisdiction)  Installing an anode bed array, consisting of four ...

Project Lac La Croix First Nation Former School Area Remediation

  • Location (Lac La Croix First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84053
  • Last Modified: 2022-11-19
  • Relevance: 798.93
  • The Proposed Project Lac La Croix First Nation is located approximately 186 km southeast of Fort Frances, Ontario via Highway 11. The community is accessible by road year-round. The proposed project involves the removal of structures and contaminated soil associated with the former Elementary School and Secondary School Tank Farm areas. The contaminated soil will be excavated and backfilled with clean fill to support future development of the site.

Project Burnco Langley Maintenance Dredging

  • Location (Burnco Langley Maintenance Dredging, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84064
  • Last Modified: 2022-11-19
  • Relevance: 798.93
  • The proposed project  Fraser River Pile & Dredge (GP) Inc. (FRPD), on behalf of 0704558 B.C. Ltd. (Burnco Rock Products Ltd. Ready Mix), proposes to conduct maintenance dredging adjacent to its barge ramp in Langley. The purpose of the project is to dredge and remove accumulated sediment to achieve appropriate vessel clearance at the barge ramp. The scope of works includes dredging a footprint of approximatively 2,950 square meters to a target dredge depth of -5.5 metres local low ...

Project Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS

  • Location (Birdtail Sioux Dakota Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84113
  • Last Modified: 2022-11-18
  • Relevance: 798.92
  • Construction of indoor and outdoor new capital asset for the delivery of First Nation Child and Family Services on reserve: Indoor space: Building – 19,370 square feet  Outdoor storage space: Garage – 1,850 square feet Outdoor cultural space:  1,970 square feet (for land-based learning, play and social gatherings Parking lot: 14,210 square feet - 4 accessible parking stalls, 33 regular stalls Access road: 7,191 square feet Stage 2 Design ...

Project Access Route and Drill Pad Construction at Inch Creek Hatchery

  • Location (Inch Creek Hatchery, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84081
  • Last Modified: 2022-11-18
  • Relevance: 798.89
  • As part of the Pacific Salmon Strategy Initiative (PSSI), the Inch Creek Hatchery was selected to receive funding to expand the aquaculture capacity onsite in order to meet specific conservation enhancement targets for salmonid populations.  To facilitate the required program expansion, the water supply infrastructure at the hatchery must be expanded to ensure adequate rearing capacity and overall system redundancy. This project will involve the drilling of two groundwater production ...

Project Construction of the Algonquins of Pikwakanagan Communal Treatment System

  • Location (Construction of the Algonquins of Pikwakanagan Communal Treatment System, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84058
  • Last Modified: 2022-11-18
  • Relevance: 798.83
  • The proposed project is a new surface water intake, low lift pumping station, communal water treatment plant, and distribution system for the Algonquins of Pikwakanagan First Nation (AoPFN). The raw water supply will be from the Bonnechere River and will consist of a raw water intake pipe, an intake structure, and a low lift station. The low lift station conveys raw water through a forcemain to the water treatment plant. The water treatment system will consist of a slow sand filtration ...

Project Red Sucker Lake First Nation New Aerated Lagoon

  • Location (Red Sucker Lake First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84112
  • Last Modified: 2022-11-17
  • Relevance: 798.79
  • Upon approval of the Preliminary Design submission by ISC, the Consultant will proceed with Detailed Design and construction tender of the work. Construction Phase of the work will include the following: - completing a site survey and layout of work areas; - clearing and grubbing at the Project Site; - construction including excavating of the two aerated lagoon cells and two SAGR cells; - completing a pre-blasting survey (if blasting is required); - blasting (if required); - ...

Project Berens River Bridge Replacement

  • Location (Berens River First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84111
  • Last Modified: 2022-11-17
  • Relevance: 798.76
  • The Berens River First Nation (BRFN), Band No. 266 is proposing to replace the existing bridge across Berens River with a new, 72 m clear-span bridge. The bridge replacement project is part of the improvements being made to the all-season road (English Road Extension Project) and will be designed to create a safer, longer lasting structure for the BRFN community. The location of the bridge replacement project is over the Berens River near the east shore of Lake Winnipeg. The site is ...

Project Beaver Lake Cree Nation New High School and Resource Centre

  • Location (Beaver Lake Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83945
  • Last Modified: 2022-11-17
  • Relevance: 798.76
  • The objective of the project is to provide a new Grade 10 to 12 high school, and to leverage the facility to support adult learners and community needs. A broader goal is to serve as an example of climate sustainability through achieving net-zero-carbon certification. The project is located on Beaver Lake Cree Nation, Band no. 131. The land selected for the new school site includes a cleared utility right of way and an historic logging area that has regrown. An existing paved and gravel parking ...

Project Netmizaaggamig Nishnaabeg - Subdivision Development

  • Location (Netmizaaggamig Nishnaabeg-Subdivision Development, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84048
  • Last Modified: 2022-11-17
  • Relevance: 798.71
  • This project is for the design and construction of a residential and commercial subdivision located in Netmizaaggamig Nishnaabeg First Nation (NNFN) Ontario, including the creation of fifty-five (55) residential lots, one (1) new roadway and a watermain extension to service the new development. The development area is located north of the existing community infrastructure (Pic Mobert North). (Lat: 48.700865)(Lon:-85.603473)

Project Fox Island South Range Replacement

  • Location (Fox Island, North of Hardwick, NB, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84108
  • Last Modified: 2022-11-16
  • Relevance: 798.7
  • CCG is planning the replacement of existing Aid to Navigation infrastructure located on Fox Island, North of Hardwick, NB. The navigational aid currently consists of a front range tower (6.5 m tall square skeleton with light and daymark) and a rear range tower (12.58 m tall square skeleton with light and daymark). The existing towers and foundations are set to be removed and replaced.   All tools, materials, and crew will be transported via barge, and moved overland approximately 100m ...

Project Upgrade B38 Pumphouse - Canadian Forces Base Comox

  • Location (Canadian Forces Base Comox, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84110
  • Last Modified: 2022-11-16
  • Relevance: 798.65
  • The Department of National Defence (DND) is proposing a project. The Project will involve removal of existing asphalt in the area, construction of the new building/pumphouse systems including: fire booster pumps, domestic water pumps, diesel generators, system controls, surrounding infrastructure, as well as a basement/lowered floor to accommodate the pumps, and connection of the building to existing utilities in the surrounding area. Currently, there is no plan for demolition of the existing ...

Project Stoney Nation Big Horn Wastewater System

  • Location (Big Horn No. 144A, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84049
  • Last Modified: 2022-11-16
  • Relevance: 798.6
  • The community of Big Horn #144A is located approximately 120km west of Rocky Mountain House. It is a part of Stoney Nation, which is comprised of the Bearspaw, Chiniki and Wesley First Nations. The Big Horn wastewater system consists of septic tanks and septic fields. Rural residential properties are serviced by an individual sewage disposal system at each location. A Water and Wastewater System Assessment report completed by BCL Engineering Ltd. in 2020 identified 42 existing residences' ...

Project Water Control Infrastructure and Dike Repair and Maintenance - Big Creek National Wildlife Area

  • Location (Big Creek National Wildlife Area, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84109
  • Last Modified: 2022-11-15
  • Relevance: 798.57
  • Ducks Unlimited Canada is proposing to undertake maintenance and repair activities to improve the dike infrastructure within the Big Creek National Wildlife Area, located in Port Rowan, Ontario. These dikes are crucial to controlling the water levels within the National Wildlife Area. They also help mitigate the risk of flooding and improve wildlife habitat. Proper functioning of this infrastructure is necessary to ensure the effective management of the area for wildlife, their habitats, ...

Project Concrete Sidewalk Repair and Sidewalk Extension

  • Location (Concrete Sidewalk Repair and Sidewalk Extension, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84107
  • Last Modified: 2022-11-15
  • Relevance: 798.56
  • This project is occurring to address concrete that is lifting on the south side of the building. The damaged area is near the rear entrance causing a tripping hazard. Old concrete bollards were removed on the west side of the building and with time it has created sink hole tripping hazards. Snow removal equipment causes further damage to the concrete in these raised areas. This project is needed in order to prevent further deterioration and tripping hazards. This includes adding a sidewalk ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Assessment Status Display Filters

Assessment Type Display Filters

Authorities Display Filters

Date modified: