Search Registry

Registry Search Mobile

Registry Search

Skip to Filters

81684 results

Project Smallmouth Bass Project

  • Location (Riding Mountain National Park, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81513
  • Last Modified: 2021-04-09
  • Relevance: 408.97
  • Smallmouth bass were detected in Clear Lake by visitors in August, 2020. Smallmouth bass are not native to Clear Lake and may outcompete native species for food and habitat resources. Limiting the establishment of Smallmouth bass is a priority, aimed at minimizing potential impacts to native species and natural ecosystem processes of Clear Lake.

Project Tiger Salamander Crossing

  • Location (Riding Mountain National Park, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81512
  • Last Modified: 2021-04-09
  • Relevance: 408.93
  • To improve connectivity, this project will construct a "salamander crosswalk" for Western Tiger Salamanders across highway 10 near the south entrance to the park. This will involve sloping the curbs along the boulevard and west side of the road and placing signage that encourages drivers to slow down and watch for this important species at risk.

Project Sturgeon Lake First Nation Children's Playgrounds

  • Location (Park location 1, Saskatchewan) (Park location 2) (Park location 3)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81511
  • Last Modified: 2021-04-09
  • Relevance: 408.75
  • The objective of the project is to provide substantive equality to their youth through the development of accessible, safe and modern playground equipment, that provides youth from aged 2 to 16 equal access and opportunity to safe playground areas in the existing residential subdivisions of our community. Project scope includes playground equipment, accessible surfacing, concrete for structures, welding requirements and associated works.

Project West Coast Trail Bridge (#96) Support Repair

  • Location (Pacific Rim National Park Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81510
  • Last Modified: 2021-04-09
  • Relevance: 408.53
  • An impact assessment is required to address potential impacts resulting from the repair of a Class A2 pedestrian bridge on the West Coast Trail of Pacific Rim National Park Reserve. Bridge repairs are required to ensure the safety of visitors and staff while traversing and maintaining the trail. Limited ground disturbance within riparian habitat will be required to upgrade the mid-span bridge support structure. All work within the riparian zone will meet DFO measures to reduce harm to fish, ...

Project Re-Establishing Our Healing Journeys

  • Location (Mississaugas of the Credit First Nation Reserve, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81509
  • Last Modified: 2021-04-09
  • Relevance: 408.23
  • Project Description: The project purpose is to rebuild the administration area that was heavily destroyed by fire and to renovate the residential area damaged by smoke. This portion of the building has been gutted to the studs. This land is currently developed, cleared, with access to local services - water, sewer, natural gas, hydro and telephone. The design will include a new layout and restoration of the existing building which was damaged by the fire. The proposed expansion area is ...

Project Tent Mountain Mine Redevelopment Project

  • Location (16km west of Coleman (Alberta), Alberta)
  • Assessment Type: Request for designation
  • Status: In progress
  • Reference Number: 81436
  • Last Modified: 2021-04-09
  • Relevance: 407.57
  • Montem Resources Alberta Operations Ltd. is proposing to restart and expand mining operations at the Tent Mountain Mine, an open-pit coal mine located 16 kilometres west of Coleman, Alberta that stopped operating in 1983. As proposed, the Tent Mountain Mine Redevelopment Project would expand the original mine pits to allow for the production of 4925 tonnes per day of raw coal used for steelmaking, over a 14-year mine life. The project would also include a coal handling and processing plant ...

Project CN rail bridge seismic retrofit project

  • Location (CN rail bridge seismic retrofit project, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81023
  • Last Modified: 2021-04-08
  • Relevance: 405.11
  • Canadian National Railway Company (CN) proposes to complete seismic retrofit upgrades to the CN rail bridge located at Mile 118.7 on the Fraser River directly upstream of the Pattullo Bridge. Upgrades will require the installation of ten new 2750 millimetre diameter steel piles. Two piles each will be installed at pier 6, 7, 8, 9 and 10.  New piles will be connected to the in-water piers using steel girder collars, pile sleeves and caps. Piles will be driven in welded segments by impact ...

Project YUL Montreal-Trudeau International Airport - Tank dismantling

  • Location (YUL Montreal-Trudeau International Airport, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81007
  • Last Modified: 2021-04-08
  • Relevance: 404.38
  • The project consists of the removal of one 50,000 L underground tank and five (5) above-ground tanks, including three 1,135 L tanks, one 1,000 L tank, and one 1,500 L tank. Piping and distribution pumps will also be removed. These tanks, which are no longer in use, will be emptied, removed and disposed of in accordance with current regulations. As part of this project, slab, sump, gutter and drain cleaning and the cleaning of oil/water separators will also be carried out. The wash water ...

Project Canadian Nuclear Laboratories Nuclear Power Demonstration Waste Facility: Modification to Crawl Space

  • Location (Canadian Nuclear Laboratories, Nuclear Power Demonstration Waste Facility, Rolphton, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81427
  • Last Modified: 2021-04-08
  • Relevance: 404.07
  • The Nuclear Power Demonstration Waste Facility (NPDWF), owned by Atomic Energy of Canada Limited (AECL) and managed by Canadian Nuclear Laboratories (CNL), is currently being maintained in a safe shut down state, in preparation for eventual decommissioning.  Small modifications in a crawlspace of the facility are being proposed to support the prevention of species at risk bats from hibernating in the facility during the winter months.     Through surveying efforts in and ...

Project Rip rap placement and parking area reinforcement

  • Location (Rip rap placement and parking area reinforcement, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81505
  • Last Modified: 2021-04-08
  • Relevance: 403.87
  • Gracia Financial Corporation is proposing to raise the existing parking area from approximately 2.0 metres to 3.5 metres chart datum (CD) to prevent flooding of the site from high water flood events, and use this area for the development of a gravel parking area with a total footprint of 1,503 square metres.   The existing shoreline armament, consisting of a band of riprap located in the intertidal zone along the north ...

Project YMX International Aerocity of Mirabel - Expansion of the building housing Foliot Meubles' operations

  • Location (YMX International Aerocity of Mirabel, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81504
  • Last Modified: 2021-04-08
  • Relevance: 403.72
  • Placement Daniel Foliot is proposing to expand the building currently housing Foliot Meubles' operations at YMX International Aerocity of Mirabel to meet the growing demand for storage due to the increase in online shopping. This 16,165 sqare meters addition will be dedicated to commercial storage. The building is covered with insulated prefabricated panels to ensure high thermal resistance.  The roof is white TPO, thus limiting heat islands.  The project ...

Project Beausoleil First Nation - Stormwater System Upgrade and Existing Drainage Rehabilitation

  • Location (Beausoleil First Nation Reserve, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81503
  • Last Modified: 2021-04-08
  • Relevance: 403.51
  • The project will improve stormwater management along Kate Kegwin Street, Wau Goosh Street, O'Gemma Street, Shingwauk Street, and Bayshore Drive in the Beausoleil First Nation in Ontario. The work will involve installing 2,350 metres of storm sewer piping and catch basins; re-ditching approximately 6,450 metres of roadside ditches; replacing approximately 450 metres of driveway culverts and approximately 120 metres of large diameter road crossing culverts; and undertaking a stormwater ...

Project Malpeque Small Craft Harbour Dredge and Disposal Zone Amendments

  • Location (Project is located in the entrance channel to the Malpeque Cove Small Craft Harbour, which is located on the Malpeque Wharf Road., Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81292
  • Last Modified: 2021-04-08
  • Relevance: 403.51
  • The Malpeque Cove Small Craft Harbour entrance channel is dredged multiple times annually as per conditions of a Disposal at Sea Permit that is issued annually by Environment and Climate Change Canada. Due to changing environmental conditions at the dredge site, a number of changes to the Disposal at Sea Permit are being requested for the 2021-22 season. Fisheries and Oceans Canada –Small Craft Harbours is requesting to expand the boundaries of both the "Dredge and Disposal ...

Project New Dredge and Disposal Sites at Tracadie Small Craft Harbor

  • Location (Project is located in the entrance channel to Tracadie Bay. The Tracadie Small Craft Harbour is located at 467 Harbour Road in Grand Tracadie., Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81293
  • Last Modified: 2021-04-08
  • Relevance: 403.49
  • Dredging of the entrance channel to Tracadie Bay will be carried out with a cutter suction dredge with pipeline disposal to the proposed disposal site located approximately 400 meters to the east of the entrance channel. Dredging will be undertaken on an as-needed basis, but will typically occur after ice leaves the harbour in early April and prior to the opening day of fishing season on April 30th. Up to 15,000 m3 of sand may be dredged and ocean disposed annually.

Project 5th Canadian Division Support Base (CDSB) Gagetown Green Power Purchase Agreement (PPA)

  • Location (5th Canadian Division Support Base (CDSB) Gagetown, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81073
  • Last Modified: 2021-04-07
  • Relevance: 400.01
  • The Government of Canada is committed to using 100% clean electricity by 2022 where available, and through the Pan Canadian Framework on Clean Growth and Climate Change, will produce and purchase new renewable electricity that will displace production of the high carbon portion of the electricity grid. The Government of Canada is also targeting industry to reduce greenhouse gases (GHGs) and look to the electricity sector as a priority for this reduction. To respond to this goal, the Department ...

Project Cargo and Apron Development at Edmonton International Airport

  • Location (Edmonton International Airport, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81501
  • Last Modified: 2021-04-07
  • Relevance: 399.93
  • April 7, 2021 –Edmonton Regional Airports Authority must decide whether the proposed Cargo and Apron Development Project, located at the Edmonton International Airport (EIA) is likely to cause significant adverse environmental effects.   To help inform this decision, Edmonton Regional Airports Authority is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public [and may be posted online]. For ...

Project Reservation Road Subdivision Development

  • Location (We'koqma'q First Nation, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80776
  • Last Modified: 2021-04-07
  • Relevance: 399.92
  • Development of a residential subdivision for approximately 20 single family dwelling units.  The subdivision is to be constructed on 2.75 ha parcel of partially cleared.  The land will require some clearing, grubbing, construction of 300m road using imported pit run gravel, type 1 and type 2 gravels.  The work also includes the installation of sanitary sewer (approx. 470m), manholes, watermain (approx. 300m) and associated water and sewer lot services.

Project Esgenoopetitj First Nation Lift Station Upgrades

  • Location (Esgenoopetitj First Nation, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81406
  • Last Modified: 2021-04-07
  • Relevance: 399.91
  • The project includes the complete replacement of Lift Station No. 5, and smaller upgrades to Lift Stations 1, 2, 3.  Activities include replacement and repair of sections of the gravity sewer along existing easements, driveway upgrades as well as a new prefabricated building and associated components for Lift station #5. 

Project Subdivision Phase III- Tobique First Nation

  • Location (Tobique First Nation, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81423
  • Last Modified: 2021-04-07
  • Relevance: 399.88
  • The objectives of the proposed Subdivision, Phase III-Tobique First Nation project are focused on establishing a residential subdivision for the community. The project's primary objectives are as follows: Construction of a new +/- 500 m roadway to service up to 25 lots.  Work includes servicing the new roadway with water services from the Reservoir Road extension and sanitary servicing from Main Street through a new trunk sewer to the new subdivision. New 20.0 m wide ...

Project Metepenagiag Mountain Side Road Extension and New Residential Development

  • Location (Metepenagiag First Nation, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80757
  • Last Modified: 2021-04-07
  • Relevance: 399.87
  • A subdivision expansion, consisting of a total of 29 lots (0.57 acres) to be developed in two phases. The total developed land area including streets will be 15.6 acres and the total street area will be 3.2 acres. Activities include: Installation of water and sanitary sewer system, including wastewater collection system Installation of culverts Street construction Mulching and grubbing of site to prepare for the new development

Project Marbase Lumpfish Hatchery - Saltwater Intake and Discharge Pipelines, Marystown, NL

  • Location (Marystown, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80817
  • Last Modified: 2021-04-07
  • Relevance: 399.69
  • Marbase Cleanerfish Ltd. is planning to construct and operate a land-based lumpfish hatchery to be located within the Marbase Integrated Aquaculture Service Hub (formerly the Marystown Shipyard) in Marystown, NL. The Marbase Cleanerfish Hatchery will provide lumpfish to Atlantic salmon farming operations where sea lice may be present and act as a stressor to the fish.   The proposed project will involve the installation of saltwater intake and discharge pipelines within the public ...

Project Amendment to the timeline in respect to condition 9 of the approved Fraser Surrey Docks Agricultural Air Handling Upgrades Project (PER No. 15-058)

  • Location (Amendment to the timeline in respect to condition 9 of the approved Fraser Surrey Docks Agricultural Air Handling Upgrades Project (PER No. 15-058), British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81500
  • Last Modified: 2021-04-07
  • Relevance: 399.59
  • The permit holder, Fraser Surrey Docks Limited Partnership (FSD), has requested an extension to the timeline for the decommissioning and removal of the interim dust suppression measures. This requires an amendment to condition 9 of the approved project permit (PER No. 15-058) which currently reads:     Components of the dust suppression measures installed pursuant to this Permit (as described in Section 2.1.3) shall cease to be used and shall be removed in ...

Project Cote First Nation Main Landfill Decommissioning

  • Location (Cote IR 64, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81496
  • Last Modified: 2021-04-07
  • Relevance: 399.28
  • The subject site was used as the main dumpsite up until 2020 by Cote First Nation and covers a 2.5 hectare area. A large waste mound was noted at the site at the time of the Phase II Environmental Site Assessment conducted in 2018 and waste had become scattered across the property including down the access road into the site.  Intrusive investigations included a test pit program in which 9 test pits were excavated to depths of approximately 4.5 m below ground surface to confirm the ...

Project Solid Waste Transfer Station - Stanley Mission

  • Location (La Ronge Provincial Park, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81497
  • Last Modified: 2021-04-07
  • Relevance: 399.28
  • The proposed Project is comprised of constructing a new Solid Waste Transfer Station (SWTS) near the existing landfill at Stanley Mission. This Project will also include: collection of municipal solid waste (MSW) at all houses at SM, a new waste collection truck, a heated garage for storage of the collection truck and to "de-pollute" vehicles for crushing and off-recycling, and decommissioning of the existing landfill site. An existing access road will allow the public and collection ...

Project Solid Waste Transfer Station - Grandmother's Bay

  • Location (Grandmother's Bay IR 219, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81498
  • Last Modified: 2021-04-07
  • Relevance: 399.27
  • The proposed Project is comprised of constructing a new Solid Waste Transfer Station (SWTS) near the existing landfill at Grandmother's Bay. This Project will also include: a new access road (for improved site lines and safety), local collection of municipal solid waste (MSW) at all houses at GMB, and decommissioning the existing landfill site. The final disposal site for material collected at the SWTS would be the regional landfill owned and operated by Lac La Ronge Regional Waste ...

Project YUL Montreal-Trudeau International Airport - Construction of an industrial building to produce nonwoven fabric for surgical masks

  • Location (YUL Montreal-Trudeau International Airport, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81495
  • Last Modified: 2021-04-07
  • Relevance: 399.21
  • True North Innovative Non-Woven Materials Inc. plans the construction of an industrial building on the north part of lot 5 599 104 located on the Chemin de l'Aviation at YUL Montreal-Trudeau International Airport. The building's ground surface area will be approximately 4,000 square meters, situated on a 15,500 square meter lot. The land is located on the site of an old golf course, now ...

Project Installation of a Concrete Tank and Septic Pump-Out System at the Port of Caraquet, NB

  • Location (Caraquet DFO-SCH, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81493
  • Last Modified: 2021-04-07
  • Relevance: 398.97
  • The project involves the construction/installation of a septic pump-out system, including a 2,000L concrete holding tank near wharf no. 804 at the Fisheries and Oceans Canada - Small Craft Harbour in Caraquet, New Brunswick.  The system includes the installation of piping and electrical infrastructure, pump and concrete tank.  The tank will contain alarms when it reaches 80% capacity, and will be pumped out by a license septic hauler and disposed off-site at an approved facility.

Project Miscou Fish Products Inc. Construction of Seafood Plant Addition

  • Location (Miscou Small Craft Harbour, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80720
  • Last Modified: 2021-04-07
  • Relevance: 398.83
  • The proposed project involves the construction of an addition to the existing Miscou Fish Products Inc. seafood processing plant, located at the Miscou Harbour Fisheries and Oceans Canada (DFO) - Small Craft Harbour (SCH) facility.  The proposed expansion will consist of a two-storey, (±218m2 per storey) wooden structure on a concrete foundation and will be attached to the existing seafood plant.  The new addition will house offices and employee break/lunch rooms, and will not ...

Project DP World Fraser Surrey - Wash Bay Improvements

  • Location (DP World Fraser Surrey - Wash Bay Improvements, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81435
  • Last Modified: 2021-04-07
  • Relevance: 397.43
  • DP World Fraser Surrey Limited Partnership is proposing to upgrade their existing wash bay that is used for power washing of heavy equipment, truck and mobile equipment at their terminal located at 11060 Elevator Road in Surrey. The works will require approximately 380 square metres of excavation to remove and replace the existing asphalt and wash water collection barrel and some trenching for the installation of new pipes to collect, ...

Project Gravel Pit Activation

  • Location (Grasslands National Park, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81432
  • Last Modified: 2021-04-07
  • Relevance: 397.43
  • Grasslands National Park proposes to activate a gravel pit roughly 5 km north of Val Marie, SK. The purpose is to develop a nearby source of gravel and other earth materials for regular operational and maintenance uses in Grasslands National Park (e.g. road maintenance). The proposed pit will be located on the SE quarter of land location 7-T4-R13 W3M, which is not within proposed park boundaries and is not on gazetted national park lands. The proposed area is adjacent to historic and existing ...

Project Suncor Base Mine Extension Project

  • Location (3 kilometres north of Fort McMurray, Alberta)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: Suspended
  • Reference Number: 80521
  • Last Modified: 2021-04-06
  • Relevance: 396.07
  • Suncor Energy Inc. is proposing to develop the Base Mine Extension Project to sustain the supply of bitumen to the existing upgraders at Suncor's Oil Sands Base Plant operation (Base Plant). The project includes an open-pit mining operation and associated infrastructure to supply bitumen to new froth production facilities and various other production facilities at the existing Base Plant. The project is located adjacent to existing Base Plant operations approximately three kilometres north ...

Project Tilbury Phase 2 LNG Expansion Project

  • Location (Tilbury Island, Delta, British Columbia)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: Suspended
  • Reference Number: 80496
  • Last Modified: 2021-04-06
  • Relevance: 396.07
  • FortisBC Holdings Inc. is proposing to expand its existing Tilbury LNG Project, a liquefied natural gas (LNG) storage and production facility located on Tilbury Island, in Delta, British Columbia. As proposed, the Tilbury Phase 2 LNG Expansion Project would increase the facility's LNG production capacity by more than 50%, up to 13 700 tonnes of LNG per day for an operational life of at least 40 years. The expansion would allow for a total storage capacity of up to 208 000 cubic metres of ...

Project LNG Canada Export Terminal Project

  • Location (District of Kitimat, British Columbia)
  • Assessment Type: Environmental assessment by substitution under CEAA 2012
  • Status: Completed
  • Reference Number: 80038
  • Last Modified: 2021-04-06
  • Relevance: 395.98
  • LNG Canada Development Inc. is proposing the construction and operation of a natural gas liquefaction facility and marine terminal for the export of liquefied natural gas (LNG) in the District of Kitimat, British Columbia. The proposed project would convert natural gas to LNG, approximately 26 million tonnes per annum, for export to global markets. The project is expected to have a life of at least 25 years.

Project Concrete structures installation for CFB Shearwater Building SH5

  • Location (Shearwater, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81492
  • Last Modified: 2021-04-06
  • Relevance: 395.95
  • The project is to consist of constructing concrete walkways leading into the proposed main entrances of building SH5 within CFB Shearwater and a monument adjacent to one of the walkways. The project consists of two (2) walkways on the northeast facing side of SH5 leading into the main door and office doors of the building. The monument will consist of placing two (2) sono tubes adjacent to the main entrance walkway. The walkways will require excavation of soil to allow gravel substrate to be ...

Project HMP0005 - Honoré Mercier Bridge, Repairs to piers and mobile bearing cases, painting, and reinforcement of steel components, phase 3

  • Location (Kahnawake, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81212
  • Last Modified: 2021-04-06
  • Relevance: 395.87
  • The goal of the project "HMP0005 – Honoré Mercier Bridge, Repairs to Piers and Mobile Bearing Cases, Painting, and Reinforcement of Steel Components, Phase 3" is to continue to replace the corrosion protection coating of the steel structure, repair and reinforce the reinforced concrete piers and structural steel, and repair or replace the bearing cases in the section of the Honoré Mercier Bridge that is under federal jurisdiction. This repair and replacement work ...

Project Tuck loading station

  • Location (Truck loading station, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81491
  • Last Modified: 2021-04-06
  • Relevance: 395.64
  • The construction project of a 3rd truck loading station in order to be able to receive a large quantity of cement additions delivered by ship. Loading station # 1, designed for loading a single product, is used for cement only. Station # 2 allows mixing of cement and cement additions, but this is used almost at full capacity. Arrangements inside the warehouse will also be made to store fly ash or slag unloaded by ship. Indeed, the delivery of this cement addition by ship will require ...

Project Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector

  • Location (Port of Quebec Beauport Sector (North Shore), Quebec)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80107
  • Last Modified: 2021-04-06
  • Relevance: 395.12
  • The Quebec Port Authority is proposing to extend the line of the existing wharf eastward by 610 metres in order to operate a deep-water terminal dedicated to containerized general cargo. The 31.7-hectare project would include the construction of a new berth and a retaining dike that would allow for the development of an additional 17 hectares of backshore space. The project also includes the construction of rail lines and road accesses, the reconfiguration of two outfalls and ...

Project Imperial Oil Dartmouth Terminal Dock 3 Repairs & Mooring System Replacement

  • Location (Imperial Oil Dartmouth Terminal, 600 Pleasant Street Dartmouth, B2Y 3Z7, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81242
  • Last Modified: 2021-04-06
  • Relevance: 394.83
  • Structural repairs and upgrades to the existing steel and concrete piled dock at Imperial Oil's Dartmouth Terminal. The project in general, involves installing four new mooring buoys and permanent anchors that will replace the existing stationary mooring dolphins, repairs to the existing concrete loading dock structure, and repairs to the approach structure that connects the loading dock to the shore.

Last UpdatedDisplay Filters

Filters

Comment Tags Display Filters

Date modified: