Project McLeod Lake Indian Band Community Centre

  • Location (Mcleod Lake Indian Band, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83675
  • Last Modified: 2022-06-30
  • Relevance: 413.01
  • The proposed project involves the construction of an approximately 1,150 m2 community centre on previously developed land in McLeod Lake, British Columbia. The project location is between the Band Administration building and the Ah'da Centre on Ah'da Road. The site in question was cleared of trees in the early 1980's and currently houses four community buildings that will be relocated or modified prior to  construction activities. The newly constructed community ...

Project Radium Hot Springs Aquacourt Foundation Stabilization, Phase 2

  • Location (Kootenay National Park, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83680
  • Last Modified: 2022-06-30
  • Relevance: 413.01
  • Parks Canada is planning to undertake foundation repairs, including a culvert extension, at the Radium Hot Springs Aquacourt in Kootenay National Park. The foundation of the building is deteriorated and has been undermined by Sinclair Creek. The Aquacourt at Radium Hot Springs was constructed between 1949 and 1951 and the building is designated as a classified federal heritage building. The footprint of disturbance within the High Water Mark of Sinclair Creek is estimated at 604m2 as a result ...

Project Demolish and Upgrade Vertical Village - Garrison Wainwright

  • Location (Garrison Wainwright, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 83408
  • Last Modified: 2022-06-29
  • Relevance: 412.85
  • The Department of National Defence (DND) has proposed a project which involves the demolition and reclamation of structures, and construction of gravel pads. Construction is proposed for Summer/Fall 2022. Demolition and reclamation activities include: Remove concrete retaining blocks Remove and stockpile existing topsoil Contour existing subgrade Replacement of topsoil in immediate area (as appropriate) Seeding Installation of coco-matting for erosion ...

Project Chin Reservoir Expansion and Modernization Project

  • Location (Taber, Alberta)
  • Assessment Type: Request for designation
  • Status: In progress
  • Reference Number: 83562
  • Last Modified: 2022-06-29
  • Relevance: 411.55
  • The St. Mary River Irrigation District is proposing to expand and modernize the Chin Reservoir, an off-stream reservoir on the St. Mary main canal located south of Taber, Alberta. As proposed, the Chin Reservoir Expansion and Modernization Project would increase the reservoir's flood capacity, including relocation of the east dam, and upgrading existing reservoir structures to align with provincial dam safety regulations. The project would increase the reservoir's water storage capacity ...

Project Mitaanjigamiing First Nation Three-Phase Power Project

  • Location (Mitaanjigamiing First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83754
  • Last Modified: 2022-06-29
  • Relevance: 411.48
  • The Proposed Project Mitaanjigamiing First Nation (previously Stanjikoming First Nation) is located at the north-western arm of Rainy Lake, about 70 km north of the Town of Fort Frances. The proposed project involves upgrading the existing single-phase power line to three-phase power, including the installation of approximately 6 km of submarine cable from the south end of Stanjikoming Bay, Rainy Lake to the Water Treatment Plant on Mitaanjigamiing First Nation.

Project Improvement of the Nutashkuan Leisure Offer

  • Location (Nutashkuan, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83753
  • Last Modified: 2022-06-29
  • Relevance: 411.21
  • The Innu First Nation of Nutashkuan wishes to improve the recreational packages to the residents of their community by developing a stimulating living environment that meets the needs of the different age groups in the community. Among things, sports, relaxation, artistic and outdoor activities are targeted. For example, the existing infrastructure (Brad-Shimun Arena) will be reorganized during the summer to allow the practice of indoor volleyball in the space usually occupied by the skating ...

Project Tilt Cove Exploration Drilling Project

  • Location (300 kilometres southeast of St. John's, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80177
  • Last Modified: 2022-06-29
  • Relevance: 411.17
  • Suncor Energy Inc. is proposing to conduct an exploration drilling project within an offshore exploration licence in the Jeanne d'Arc Basin, located approximately 300 kilometres southeast of St. John's, Newfoundland and Labrador in the Atlantic Ocean. As proposed, the Tilt Cove Exploration Drilling Project would allow the proponent, over a nine-year period, to determine the presence, nature, and quantities of the potential hydrocarbon resource in exploration licence 1161.

Project James Bay Lithium Mine Project

  • Location (100 kilometres east of James Bay, Quebec)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80141
  • Last Modified: 2022-06-29
  • Relevance: 410.99
  • Galaxy Lithium (Canada) Inc. is proposing the construction, operation and decommissioning of an open-pit lithium mine located approximately 100 kilometres east of James Bay and the Eastmain Cree Village, in Quebec. As proposed, the James Bay Lithium Mine Project would have an estimated mine life of 15 to 20 years, and produce on average 5,480 tonnes of ore per day. The project would include an open-pit mine and concentrator facility, tailings, waste rock, ore and ...

Project Hard Surface Replacement

  • Location (1050 Notre Dame Avenue, Sudbury, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83752
  • Last Modified: 2022-06-29
  • Relevance: 410.77
  • Replace the existing interlocking and damaged concrete on the sidewalks, curbs and walkways. Addition of a ramp that is compliant with AODA requirements. New layout of the MI parking lot to improve barrier-free accessibility and increase the number of parking spaces involving repainting of parking lines and some repaving. Through the preliminary design phase of this project, it was determined that the footprint of the above noted areas exceeded 1,000m2 (Approximately 1240m2 for paved walkways, ...

Project Georgina Island Fixed Link Project

  • Location (Lake Simcoe between Georgina Island to Town of Georgina in Ontario, Ontario)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: Suspended
  • Reference Number: 83539
  • Last Modified: 2022-06-29
  • Relevance: 410.62
  • The Chippewas of Georgina Island First Nation is proposing to construct and operate the Georgina Island Fixed Link Project, which consists of two permanent causeways, each with a continuous length of 500 to 1000 metres. As proposed, the causeways would be built in shallow water and would connect to each end of a new 1200 to 1500 metre-long bridge. Together, the causeways and the bridge would create a road connection spanning across Lake Simcoe from the southern end of Georgina Island to the ...

Project Îles-de-la-Madeleine Airport - Installation of a shelter and parking lot

  • Location (Iles-de-la-Madeleine Airport, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Terminated
  • Reference Number: 83476
  • Last Modified: 2022-06-29
  • Relevance: 410.42
  • The proposed project consists of installing a shelter and  a parking lot with ground anchors for aircrafts at the Iles-de-la-Madeleine airport. The area of the shelter is estimated at approximately 3250 square feet. The parking area is estimated at approximately 40,000 square feet. Resurfacing will be required, with either asphalt or concrete. The machinery used will be a bulldozer and a roller compactor. The work is scheduled for spring 2022.

Project Construction of New Building - Canadian Forces Base (CFB) Gander

  • Location (Canadian Forces Base (CFB) Gander, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 83378
  • Last Modified: 2022-06-28
  • Relevance: 408.59
  • The Department of National Defence (DND) has proposed a project which involves the construction of a new facility to house the 5 Canadian Rangers Patrol Group at 9 Wing, Canadian Forces Base Gander. Project activities are expected to include tree clearing, grubbing, removal of the topsoil/organic root mat layer down to native ground, construction of a new asphalt access road, and building construction. The proposed building has a 1002 square meter footprint and will be constructed along Navy ...

Project Upgrade Building B160 for Occupancy - 9 Wing Gander

  • Location (9 Wing Gander, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 83020
  • Last Modified: 2022-06-28
  • Relevance: 408.54
  • The Department of National Defence (DND) has proposed a project to upgrade Building B160, located at 9 Wing, Canadian Forces Base (CFB) Gander, Newfoundland and Labrador, for occupancy. Building B160 is a 465 square metre (m2) heavy equipment storage building that was constructed in 2011. At that time, Building B160 was equipped with a washroom, but as the existing water and sanitary sewer lines ended outside of the area of construction at Building B128 (Main Headquarters) on Fidelitas Street, ...

Project Lafarge Additional Barge Moorage in Victoria Harbour

  • Location (Victoria, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 83468
  • Last Modified: 2022-06-28
  • Relevance: 406.75
  • Lafarge is proposing to install three vertical steel pipe piles within the water lot to accommodate mooring of barges in Victoria, B.C. The Lafarge Victoria Terminal is located on the northern shoreline of the Upper Harbour in Victoria. The proposed project includes the installation of three 36-inch diameter vertical steel piles, and piles will be drilled by barge mounted equipment. Drill spoils will be surface loaded onto the barge for offsite disposal at an approved facility. There will be no ...

Project Keswick Post Office Site Remediation

  • Location (Keswick, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80959
  • Last Modified: 2022-06-28
  • Relevance: 406.31
  • This project involves remediation of contaminated soil and groundwater under the paved area of the property, which has been historically impacted by petroleum hydrocarbons from a former underground storage tank (previously removed). An environmental consultant will be on-site during the remediation and will oversee the contractors and conduct sampling activities. Impacted soil and liquid material (as necessary) will be excavated, trucked and disposed of at approved disposal facilities in ...

Project Parking Lot and Roadway Reconstruction at Mail Processing Plant (MPP) Halifax, NS

  • Location (6175 Almon Street, Halifax, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83750
  • Last Modified: 2022-06-28
  • Relevance: 406.3
  • Canada Post is proposing to reconstruct in phases the parking lot and roadway of the existing parking surface at the Canada Post Halifax mail processing plant in Halifax, Nova Scotia. The work will include removal of the existing asphalt and concrete surfaces and subgrade with reconstruction of new asphalt roadways and parking and concrete dock loading area trailer parking. The work also involves replacing and repairing existing portions of damaged storm and sanitary sewers as necessary as ...

Project Trois-Rivières Port Facilities Expansion Project (Terminal 21)

  • Location (Trois-Rivières, Quebec)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80102
  • Last Modified: 2022-06-28
  • Relevance: 406.26
  • The Trois-Rivières Port Authority is proposing a port expansion project to increase the transhipment and storage capacity of the port at its facilities located in Trois-Rivières, Quebec. The project would include the construction of a 96,510-square-metre multipurpose terminal at the western end of the port's existing facilities, in continuity with the existing solid and liquid bulk terminal. This new terminal would extend the port's maritime range by 716.4 metres ...

Project Reconstruction of runway threshold 29 and rehabilitation of traffic lanes Golf and Hotel at Québec City Jean Lesage International Airport (YQB)

  • Location (Québec City Jean Lesage International Airport (YQB), Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 83655
  • Last Modified: 2022-06-28
  • Relevance: 406.2
  • The project consists of carry out regulatory works for the reconstruction of threshold 29 and the rehabilitation of traffic lanes Golf and Hotel. The project is necessary to maintain quality, efficient and safe airport infrastructure. Excavation, drainage, pavement construction and replacement of the beaconing system and airport electrical equipment are planned. Works phasing: 2022 (June to Septembre) : Seuil 29 2023 (June to Septembre) : Golf Phase 1 2024 (June to Septembre) : ...

Project Wharf Reconstruction at Feltzen South Small Craft Harbour, Lunenburg County, NS

  • Location (The Feltzen South SCH is located in the community of Feltzen South, Lunenburg County, and is accessible from Feltzen South Road via highway 322 from Highway 3., Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 83238
  • Last Modified: 2022-06-28
  • Relevance: 405.73
  • The Small Craft Harbours Branch of Fisheries and Oceans Canada proposes to undertake the reconstruction of the ell section of the existing breakwater wharf located at Feltzen South Small Craft Harbour (SCH),  Lunenburg County, Nova Scotia.  Work will be conducted with the use of heavy equipment such as haul trucks and excavators to complete the removal of the old section of the wharf and construct the new section. The proposed project involves removal of the existing wharf section, ...

Project New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46

  • Location (Lake Manitoba First Nation, MB, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83668
  • Last Modified: 2022-06-28
  • Relevance: 404.26
  • Broadband Communications North Inc. is proposing a new 36.5 metre telecommunication tower at Lake Manitoba First Nation located on Dog Creek Reserve No. 46. The tower will be built to provide wireless internet services for the community's businesses and members. The wireless service will be provided by a 5 GHz system using sector antennas and fibre backhaul. In the future, the tower may have other antennas and other radiocommunication equipment added or replaced.

Project Accommodation for Wing Headquarters - 9 Wing Gander

  • Location (9 Wing Gander, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 83050
  • Last Modified: 2022-06-27
  • Relevance: 404.04
  • The Department of National Defence (DND) has proposed a project to construct a new headquarters building. Construction of the new headquarters will consolidate 9 Wing headquarters' functions. The project consists of constructing an approximately 806m2 headquarters building, which will be one story on a slab, to house 9 Wing command, comptroller, and administrative staff. Parking areas will be constructed on the north and south sides of the new headquarters with a lane connecting the two ...

Project Bella Coola Ferry Terminal Berth Upgrades

  • Location (Bella Coola, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83749
  • Last Modified: 2022-06-27
  • Relevance: 403.15
  • This project is for replacement of the existing ferry turning dolphin.  Project Activities include the replacement of existing, deteriorated infrastructure and installation of new components in the marine environment. Project components are as follows: • Remove existing concrete platform, timber fender wall, and associated steel piles. • Install four (4) new 1219 mm (48 in) outer diameter steel piles with anodes. • Relocate existing steel pile dolphin. • Install ...

Project Nanaimo to Protection Island Submarine Cable Replacement Project

  • Location (Nanaimo, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80592
  • Last Modified: 2022-06-27
  • Relevance: 403.14
  • BC Hydro proposes to install two 25 kV submarine distribution cables across McKay Channel between the City of Nanaimo and Protection Island for power supply to Protection Island replace existing aging infrastructure.  The two cables will extend from Mafeo Sutton Park in Nanaimo across Mckay Channel through Pirates Park on Protection island and will be located in subsurface conduit at each land side area and then exit conduit in deep water and lay on the seabed.   

Project Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project

  • Location (Okanagan Indian Band, Salmon River, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 83482
  • Last Modified: 2022-06-27
  • Relevance: 402.65
  • Fortis BC is replacing a segment of their natural gas transmission pipeline on Okanagan Indian Band 1 at the Salmon River Crossing (5) site near the intersection of highway 97 and the Salmon River Road. Approximately 8m of pipeline has become exposed at a river crossing due to scour and erosion. Key features of the project include: Preparation of work staging area Horizontal Directional Drilling of a new pipeline segment, approximately 26m below the Salmon River   Decommissioning ...

Project Canadian Forces Sailing Association (CFSA) Waterlot Remediation Program

  • Location (CF Sailing Association Waterlot, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81633
  • Last Modified: 2022-06-27
  • Relevance: 402.57
  • The CFSA waterlot is approximately 35,000 m2 (3.5 ha) in size and contains six docks and two floating barges. Contaminants of concern (COCs) encountered in the CFSA waterlot during the most recent investigation confirmed the presence of metals, PAHs, and PCBs at concentrations exceeding the maximum numeric remedial action objectives (NRAOs).  PSPC is proposing to remove the existing marina structures and remediate the contaminated sediment within the CFSA waterlot.  The Project is ...

Project Troilus Mining Project

  • Location (Municipality of Baie-James, Quebec)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 83658
  • Last Modified: 2022-06-27
  • Relevance: 402.43
  • Troilus Gold Corp. is proposing the construction and operation of a new open-pit gold and copper mine located approximately 70 kilometres northwest of the Cree community of Mistissini and approximately 170 kilometres north of Chibougamau, Quebec. As proposed, the Troilus Mining Project would include a new mill complex and new waste rock and overburden piles. The project would also include the mining of two former open pits and the reuse and expansion of the existing waste rock and overburden ...

Project Mohawks of the Bay of Quinte - Elder and Disabled Care Home Construction

  • Location (Mohawks of the Bay of Quinte First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80977
  • Last Modified: 2022-06-27
  • Relevance: 402.37
  • The Mohawks of the Bay of Quinte First Nation propose the construction of a new 128 bed Elder and Disabled Care home on the Tyendinaga Mohawk Territory.  The facility will be approximately 8,000 square metres in size and will be connected to municipal water an sanitary services provided by the Town of Desoronto.  Natural gas will be provided by connecting to Enbridge infrastructure and fibre-optic communications will be provided by 7th Gen Communications.

Project Big Tancook Ferry Terminal Construction Project

  • Location (Big Tancook, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83516
  • Last Modified: 2022-06-27
  • Relevance: 402.03
  • Nova Scotia Public Works is developing a new vehicle ferry link to the Tancook Islands (Big Tancook Island and Little Tancook Island) from a new mainland-based ferry wharf and parking/staging area, accessible via Route 329 (Lighthouse Route) and the Gates Fish Plant Road, Blandford, Nova Scotia.   The proposed Project will provide the needed infrastructure for the docking of a new 18-car ferry and passenger boarding/disembarking to replace the current walk-on ferry that currently ...

Project FedEx Facility Parking Lot Expansion

  • Location (FedEx, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83747
  • Last Modified: 2022-06-27
  • Relevance: 401.87
  • Development of the Site located at 2190 Derry Road East, Mississauga, Ontario consists of expansion of the existing parking lots both east and north of the Site, which is to be undertaken in two phases. Convert existing grassed areas into asphalt paved parking lot. The new parking area will be 6,945m2 increasing the parking spots to 365 spots for employees and 60 new VAN parking spots. Installation of new catchbasins as required to maintain water quantity and quality control measures. 

Project Simpson River Pit Toilet Installation

  • Location (Kootenay National Park of Canada, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83746
  • Last Modified: 2022-06-27
  • Relevance: 401.73
  • Parks Canada is proposing to install a 2-hole concrete construction-style accessible, inclusive privy at the Simpson River trail head. The privy is to be installed to improve visitor experience for meeting basic needs for sanitary washroom facilities, and reduce ecological damages created due to the lack of sanitary facilities at this site. Construction area zone is 50 square meters, approximately 7 m3 of material will be excavated and is located less than 50 meters away from the nearest ...

Project Rehabilitation of the Chambly Canal Levee B8-18

  • Location (Chambly Canal National Historic Site of Canada, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83743
  • Last Modified: 2022-06-27
  • Relevance: 401.6
  • Stabilization and repair work is planned on the Chambly Canal levee B8-18 in the Fryer Island area. The levee has significant erosion and subsidence problems. This section of the levee has the particularity of having a body of water between the canal and the Richelieu River, which is frequented by several animal species. The work is planned for the fall of 2022, after the canal has been closed to navigation and the water in the canal has been lowered, and outside the most sensitive periods for ...

Project Wharf Reconstruction at Upper Whitehead Small Craft Harbour, Guysborough County, NS

  • Location (Upper Whitehead SCH is located in the community of Whitehead, Guysborough County, Nova Scotia, on the southeast coast. It is accessible from Whitehead Road via Highway #316., Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83744
  • Last Modified: 2022-06-27
  • Relevance: 401.6
  • The proposed harbour improvements project at Upper Whitehead SCH will include the construction of a launching ramp and containment cell/service area. The launching ramp will extend northeast into the harbour basin while the containment cell will be constructed directly south of the existing wharf.  The new launching ramp will be approximately 34 m long by 6 m wide consisting of a combination of cast in place and pre cast concrete slabs covering approximately 155 m2.  The harbour ...

Project Bigstone Cree Nation High School Waterline Project

  • Location (Wabasca, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83671
  • Last Modified: 2022-06-27
  • Relevance: 399.96
  • Bigstone Cree Nation plans to install a water pipeline to the high school to increase water conveyance capacity. The proposed project will involve installation of a new  250 mm water pipeline that is 950 m in length via horizontal directional drilling. The new water pipeline will be connected to the existing 150 mm pipeline at the school site to form a loop that can increase the reliability of water distribution.

Project Milton Logistics Hub Project

  • Location (Milton, Ontario)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: Completed
  • Reference Number: 80100
  • Last Modified: 2022-06-27
  • Relevance: 399.96
  • The Canadian National Railway Company is proposing the construction and operation of a logistics hub, designed to transfer containers between trucks and railcars. The project would include a railway yard with more than 20 kilometres of track and be located in Milton, Ontario, about 50 kilometres west of Toronto.

Project Snootli Hatchery - New Stock Assessment Division Office and Warehouse

  • Location (Snootli Hatchery, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 83662
  • Last Modified: 2022-06-26
  • Relevance: 395.71
  • This project includes the construction of a small office and combined warehouse space on a greenfield site adjacent to the Snootli Creek Hatchery main office building. Approximately 12 Cottonwood trees will be cleared for the footprint of the building. The office and warehouse space will be approximately 220 m2 and will include a small kitchen and washroom, some office space, and conditioned warehouse space with a large roll-top door. The foundation will be slab on-grade with strip footings. ...

Last UpdatedDisplay Filters