Search Registry

Registry Search Mobile

Registry Search

Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

Skip to Filters

514 results

Project Repair work on the facade of Pier 31

  • Location (Port of Quebec, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81106
  • Last Modified: 2020-10-28
  • Relevance: 10298.74
  • The STQ wishes to proceed with the repair of the façade of Pier 31, which it leases at the Port of Quebec. The repair length is of 255m.linear. Repairs involve installing steel plates at various locations where significant equipment losses are identified on the front. Concrete with anti-leaching concrete will then be done behind the installed steel plates. If repairs are not made in the very near future, significant equipment losses and significant subsidence could be observed. This is ...

Project Heart Lake BF 80752 Bridge Replacement

  • Location (Heart Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80936
  • Last Modified: 2020-10-28
  • Relevance: 10298.63
  • Heart Lake First Nation is proposing to replace a bridge over the Piche River on the Heart Lake First Nations Reserve No. 167. The Project is located within SW 01-070-11 W4M (approximately 15 km east of Highway 881 and 70 km northeast of Lac La Biche) and consists of Bridge File (BF) 80752 crossing the Piche River along an unnamed local road. An assessment of BF 80752 indicated that the bridge is in poor condition and near the end of its useful life, and requires either rehabilitation ...

Project Montana First Nation Emergency Road Repairs

  • Location (Montana First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81105
  • Last Modified: 2020-10-28
  • Relevance: 10298.6
  • Complete repairs to flood damaged roads and ditches at select locations and make improvements to help prevent additional flood damage at those locations. Work includes clearing/grubbing and reshaping existing ditches, installation of culverts and graveling existing roadways to raise road elevation and create road crown for drainage. A total of 16 locations have been identified for repairs within the road right of way.  The total approximate length of road improvements is 2.8 km. ...

Project Regional Assessment of Offshore Oil and Gas Exploratory Drilling East of Newfoundland and Labrador

  • Location (Canada-Newfoundland and Labrador Offshore Area, Newfoundland and Labrador)
  • Assessment Type: Regional Assessment
  • Status: In progress
  • Reference Number: 80156
  • Last Modified: 2020-10-28
  • Relevance: 10297.41
  • The Regional Assessment of Offshore Oil and Gas Exploratory Drilling East of Newfoundland and Labrador was completed in February 2020. The assessment sought to improve the effectiveness and efficiency of the assessment process for offshore exploratory drilling projects in the study area while at the same time ensuring that the highest standards of environmental protection continued to be applied and maintained. In response to the recommendations in the Regional Assessment Final Report, the ...

Project Bay du Nord Development Project

  • Location (Flemish Pass Basin, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80154
  • Last Modified: 2020-10-28
  • Relevance: 10296.88
  • Equinor (formerly Statoil Canada Ltd.), in partnership with Husky Oil Operations Limited, is proposing to install and operate a floating offshore oil and gas production facility in the Flemish Pass, approximately 450 kilometres east of St. John's, Newfoundland and Labrador, in the Atlantic Ocean. As proposed, the Bay du Nord Development Project would be in operation for approximately 30 years, with the potential for additional wells and tie-backs to the production facility.

Project CN rail bridge seismic retrofit project

  • Location (CN rail bridge seismic retrofit project, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81023
  • Last Modified: 2020-10-28
  • Relevance: 10295.35
  • Canadian National Railway Company (CN) proposes to complete seismic retrofit upgrades to the CN rail bridge located at Mile 118.7 on the Fraser River directly upstream of the Pattullo Bridge. Upgrades will require the installation of ten new 2750 millimetre diameter steel piles. Two piles each will be installed at pier 6, 7, 8, 9 and 10.  New piles will be connected to the in-water piers using steel girder collars, pile sleeves and caps. Piles will be driven in welded segments by impact ...

Project Shoreline Protection - Seawall Repairs

  • Location (St. Andrews Blockhouse National Historic Site, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81026
  • Last Modified: 2020-10-28
  • Relevance: 10295.35
  • An armoured stone seawall, located around the perimeter of the shoreline adjacent to the St. Andrews Blockhouse National Historic Site, provides protection against erosion from the water and wave action of the Passamaquoddy Bay. Recent inspection of the seawall identified a number of deficiencies that could result in potential failure of the structure and cause erosion to the site. The Shoreline Protection – Seawall Repairs project intends to rehabilitate the stone seawall by repairing ...

Project Construct Buildings and Washrack at Vernon Military Camp

  • Location (Vernon Military Camp, 3100 15th Ave, Vernon, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81103
  • Last Modified: 2020-10-27
  • Relevance: 10293.79
  • Several construction projects on the naturalized side of the camp are planned to start construction in April 2021. While it is likely not all of these projects requires an assessment, the others are added here because there is a potential that species at risk may use the area, and joint assessment allows for understanding of any cumulative impact. An ablution building with a 100 m2 footprint will be constructed inside the footprint of a previously existing building. A storage and maintenance ...

Project Grassy Mountain Coal Project

  • Location (Southwest Alberta, approximately 7 kilometres north of Blairmore, Alberta)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 80101
  • Last Modified: 2020-10-27
  • Relevance: 10293.01
  • Benga Mining Limited, a wholly owned subsidiary of Riversdale Resources Limited, is proposing to construct and operate an open-pit metallurgical coal mine near the Crowsnest Pass, approximately seven kilometres north of the community of Blairmore, in southwest Alberta. As proposed, the production capacity of the project would be a maximum of 4.5 million tonnes of clean coal per year, over a mine-life of about 25 years.

Project Upgrades at Richardson Beach, City of Kingston, Lake Ontario

  • Location (Richardson Beach, City of Kingston, Lake Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80762
  • Last Modified: 2020-10-27
  • Relevance: 10292.72
  • Located at a popular waterfront park, swimming, windsurfing and paddle boarding destination, the Richardson Beach shoreline improvement project will protect the existing shoreline from erosion and intensifying storm events and high water with new stone revetment, berms and a renovation of the existing concrete steps and walls. The project will include improvements to the existing public gathering spaces and improved access to the water for park users wanting to wade, for swimmers, for ...

Project Sand Pond National Wildlife Area, Nova Scotia - Proposed Habitat Enhancement Project

  • Location (Sand Pond National Wildlife Area, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81102
  • Last Modified: 2020-10-27
  • Relevance: 10292.71
  • Ducks Unlimited Canada is proposing to undertake a habitat enhancement project located at the Sand Pond National Wildlife Area. The scope of this project includes removal of a de-commissioned water control structure and concrete fish ladder in order to remove the infrastructure liability while improving fish passage upstream of this partial barrier. The project will not detract from the intended purposes of the structure while greatly enhancing fish passage into the upstream lakes and ...

Project Proposed Dredge Material Management Site, Toney River, Pictou County, NS

  • Location (The Toney River property is located along the Sunrise Trail (Hwy 6) in Toney River, Pictou County, NS (PID #65210932)., Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81062
  • Last Modified: 2020-10-27
  • Relevance: 10292.48
  • The Small Craft Harbours Branch of Fisheries and Oceans Canada proposes to undertake the development of a dredge material management site intended to be used to receive, store, and manage sediment material resulting from maintenance dredging activities conducted at Toney River Small Craft Harbour. Site works will involve the construction of an access road that will facilitate the transportation of dredge material from the harbour to the selected location within the proposed property that will ...

Project Sucker Creek Housing Project 2020 (4 Units)

  • Location (Sucker Creek First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81100
  • Last Modified: 2020-10-26
  • Relevance: 10289.97
  • Rural residential Housing. Supply and install 1400 sq ft prefabricated modular home with Poured concrete foundation piling system. Site servicing comprised of 1500 gal precast concrete water cistern, 2000 gal precast concrete sewage holding tank, 3 phase power, natural gas and driveway. Rubber tired backhoe, Skidsteer, John Deere 200 Trackhoe, and D5 Cat Crawler Tractor to be used for excavation, driveway construction, backfill and landscaping. Rural residential Housing. Supply and install ...

Project Canadian Coast Guard Holland Rock Helipad Rebuild

  • Location (Holland Rock is located approximately 16 km south of Prince Rupert, BC, in Chatham Sound., British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81056
  • Last Modified: 2020-10-26
  • Relevance: 10289.05
  • Holland Rock is a site which contains shared infrastructure between Canadian Coast Guard and Environment and Climate Change Canada. The site consists of foundations remaining from a lightstation that burnt down in the 1946, a small concrete building housing electrical equipment and batteries, a marine navigational aid and weather tower and a collapsed wooden helipad on concrete footings. The Canadian Coast Guard is undertaking a project to construct a new helicopter landing pad at Holland ...

Project Establishing Shrubs in Protective Fenced Areas to Facilitate Forest Restoration on Sidney Island

  • Location (Gulf Islands National Park Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81014
  • Last Modified: 2020-10-25
  • Relevance: 10282.39
  • Many decades of high-intensity browsing by deer on Sidney Island has greatly reduced the abundance and diversity of plants in the forest understory. The result of this pressure is that the forest on Sidney Island has lost much of the species diversity and structural diversity it once had: fewer tree species are able to grow into saplings to replace older trees as they die, and the understorey has nearly disappeared. The forest will continue on this trajectory unless effective restoration work ...

Project Rabbit Creek Wildfire Reclamation

  • Location (Prince Albert National Park, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81015
  • Last Modified: 2020-10-25
  • Relevance: 10282.39
  • In May 2018 the Rabbit Creek Wildfire occurred in Prince Albert National Park and spread within and outside of the park. Heavy equipment was used to create fire control lines and to improve ground and aerial access to strategic areas. In addition to the dozer lines that were put in during the fire, heavy equipment was used along the border between the south boundary of the park and the Cookson Community Pasture to push back the forested edge to protect a newly repaired fence that had been ...

Project Kootenay National Park (KNP) Avalanche Mitigations, Whymper Remote Avalanche Control Systems (RACS)

  • Location (Kootenay National Park, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81012
  • Last Modified: 2020-10-25
  • Relevance: 10282.39
  • Parks Canada is proposing to install four Remote Avalanche Control System (RACS) units on Mt Whymper. Currently Parks Canada Agency performs avalanche control by placing explosives from helicopters in starting zones of Mt Whymper. However, control by helicopter is often limited by poor visibility and wind in the starting zones, effecting timing and efficiency of avalanche control, and exposing workers to challenging flying conditions and explosives use. The rationale for RACS in these paths is ...

Project East Block Interior Roads Stream Crossings Upgrades

  • Location (Grasslands National Park, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81013
  • Last Modified: 2020-10-25
  • Relevance: 10282.39
  • Grasslands National Park is proposing to upgrade low-level stream crossings in the East Block of Grasslands National Park. These crossings are located along vehicle access routes that are maintained for local access, emergency response, and for operational purposes. Current condition of stream crossings will be assessed and upgrade options will be evaluated and implemented. Rock Creek in the East Block is habitat for the plains minnow, a species listed on Schedule 1 of the Species at Risk Act. ...

Project Marathon Palladium Project

  • Location (Marathon, Ontario)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 54755
  • Last Modified: 2020-10-25
  • Relevance: 10282.39
  • Generation PGM Inc. is proposing to construct, operate and decommission an open pit palladium mine approximately 10 km from Marathon, Ontario. The proposed project would include three to four open pits, an ore processing plant, tailings and mine rock storage facilities, site access roads, a transmission line, explosives factory and magazines, water management facilities, ancillary mine infrastructure and associated activities. The rate of production would be approximately 22,000 tonnes per day ...

Project Fraser Mills Foreshore Improvements

  • Location (Fraser Mills Foreshore Improvements, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81009
  • Last Modified: 2020-10-24
  • Relevance: 10278.17
  • Beedie Fraser Mills LP are proposing foreshore improvements to an approximate 600 metre length of waterfront on the north side of the Fraser River in Coquitlam, known as Fraser Mills. The proposed works within the port authority jurisdiction relate to landscaping, storm water, and the existing wharf. The proposed upland residential development (the Fraser Mills Waterfront Village development site), is within the jurisdiction of the City of Coquitlam, and does not form part of this application ...

Project Ogilvie Culvert Decommissioning

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80993
  • Last Modified: 2020-10-23
  • Relevance: 10276.5
  • The approximate 116-year old concrete culvert arch structure has not been used for process water discharge for many years. The concrete structure is reaching the end of its service life and should be decommissioning by permanently filling it in to ensure safety users of the culvert, CN and Neighbouring companies. The culvert is located at the rear east side of the ADM facility situated at 950 Mill Street, Montreal, Quebec and at the south-west corner of the Windmill-Point Basin.

Project Great Sandhills Railway Switching Operation at North West Terminal Project

  • Location (1 kilometre east of Unity, Saskatchewan)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80998
  • Last Modified: 2020-10-23
  • Relevance: 10275.59
  • Great Sandhills Railway Ltd. is proposing to expand the existing North West Terminal, a grain handling facility located one kilometre east of Unity, Saskatchewan and serviced by the Canadian National Railway (CN) and the Canadian Pacific Railway (CP). As proposed, the Great Sandhills Railway Switching Operation at North West Terminal Project would include three loop tracks, two shop tracks, a wye track, and a repair shop. The new tracks would reduce congestion on the mainline by allowing CN and ...

Project Regional Assessment in the Ring of Fire Area

  • Location (Ring of Fire, Ontario)
  • Assessment Type: Regional Assessment
  • Status: In progress
  • Reference Number: 80468
  • Last Modified: 2020-10-22
  • Relevance: 10272.33
  • The Regional Assessment will be conducted in the area centred on the Ring of Fire mineral deposits in northern Ontario, approximately 540 kilometres northeast of Thunder Bay and 1,000 kilometres north of Toronto. The Impact Assessment Agency of Canada will work with the Province of Ontario, Indigenous groups, federal authorities, non-government organizations and the public to determine the appropriate activities, outcomes and boundaries of the regional assessment.

Project Place du Portage III Renewal Project

  • Location (Place du Portage III, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81098
  • Last Modified: 2020-10-22
  • Relevance: 10271.9
  • This project includes the complete renewal of the entire Place du Portage III (PDP III) in order to update the office space to meet Government of Canada Workplace Fit-Up Standards for PSPC's headquarters. The scope of the project also includes new entrances, updated public spaces and retail location, a new building envelope, new mechanical and electrical systems, updates to the IT&AV and seismic structure. The renewal of the complex will improve accessibility for all users, reduce ...

Project Reconstruction of Albert Street, Queen Street, Slater Street and Bronson Avenue

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81097
  • Last Modified: 2020-10-22
  • Relevance: 10271.64
  • The City of Ottawa is completing the preliminary and detailed design of the Reconstruction of Albert Street, Queen Street, Slater Street and Bronson Avenue. A portion of the project will involve a property known as 550 Albert Street which is Federal Land owned by the National Capital Commission (NCC). The project will include the replacement of portions of the existing sewers, roads, and watermains, as well as the rearrangement and reconstruction of the street right-of-way with Slater ...

Project Deconstruction of 12 Buildings, Canadian Forces Ammunition Depot (CFAD) Bedford, Canadian Forces Base (CFB) Halifax, Nova Scotia

  • Location (Canadian Forces Ammunition Depot (CFAD) Bedford, Canadian Forces Base (CFB) Halifax, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81096
  • Last Modified: 2020-10-21
  • Relevance: 10268.56
  • DND is proposing to carry out deconstruction of the following 12 buildings located within the administrative area of CFAD Bedford: BM30/33, BM89, BM154, BM156, BM157, BM158, BM159, BM161, BM163, BM165, BM166 and BM167. Building footprints range from approximately 10 square metres (m2) to 550 m2. The proposed project is expected to consist of hazardous materials abatement, building demolition including removal of below grade structures, offsite disposal of hazardous and construction and ...

Project Muskowekwan Lagoon & Sewage Pumping Station

  • Location (Muskowekwan IR 85, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81094
  • Last Modified: 2020-10-21
  • Relevance: 10268.3
  • Design and construct a new lagoon and Sewage Pumping Station on Muskowekwan IR 85 within Sec15 TP27 R15 W2M (lagoon & sewage pumping station), Sec14 TP27 R15 W2M (sewage force main), and Sec 11 TP27 R15 W2M (sewage force main & sewage pumping station). Total area of the lagoon will be 16ha.  Force mains will be buried to a minimum of 3m cover.  Sewage pumping stations will use an area of 0.1ha each (2).  The lagoon will treat raw sewage.  It has been design to meet ...

Project Muskowekwan Water Treatment Plant Upgrades

  • Location (Muskowekwan IR 85, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81095
  • Last Modified: 2020-10-21
  • Relevance: 10268.29
  • The project will include the construction of a new water treatment plant (WTP) and the connection of a water supply well for Muskowekwan First Nation located on NW 12-27-15 W2M.  The WTP building will sit upon a new underground concrete storage reservoir.  Total area of the building is 616 sq. m.  Total area of facility, including gravel surfaces and truck load out is 0.32 ha (3200 sq. m).  Building construction is typical wood frame construction , with brick veneer.  ...

Project Boiler Upgrade

  • Location (Building 351, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81093
  • Last Modified: 2020-10-21
  • Relevance: 10268.09
  • The project is to change the existing fuel boiler to a natural gas one, install a new gas line to the building and excavate and remove the underground fuel tank (22,765 L). The land is owned by Transport Canada and is leased by DND according to an MOU between the two departments. Building 351 has historically been heated using an oil-fired boiler system which utilized furnace oil, stored in an UST several metres east of the building, as a fuel source. Following a recent review of heating ...

Project Removal of Pad-Mount Transformer and Switchgear

  • Location (DND Data Centre, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81092
  • Last Modified: 2020-10-21
  • Relevance: 10267.92
  • Project intent is to remove the redundant pad-mounted transformer and switchgear outside the DND Data Centre. The project area is expected to be about 70m2, and is outside of the building envelope. The building itself has a footprint over 1000m2. In summary the contractor will: • Perform locates around work area; • Lift 15kV transformer from pad and remove from site; • Remove protective bollards and pad; • Saw cut section of asphalt and excavate to depth required to ...

Project Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area

  • Location (Vaseux-Bighorn National Wildlife Area, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81091
  • Last Modified: 2020-10-21
  • Relevance: 10267.91
  • The Canadian Wildlife Service is proposing to undertake the decommissioning and replacement of an existing boardwalk within the Vaseux-Bighorn National Wildlife Area. The Vaseux-Bighorn National Wildlife Area is one of 10 national wildlife areas identified under the Connecting Canadians to Nature initiative that supports connecting Canadians to the natural world. The scope of the project includes removing the existing 292 m2 boardwalk and replacing it with a new boardwalk within the ...

Project Comfort Cove Building Demolition

  • Location (Comfort Cove, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81087
  • Last Modified: 2020-10-21
  • Relevance: 10267.09
  • DFO, Canadian Coast Guard is proposing to remove the abandoned building located at the former Loran C site in Comfort Cove, NL. This decommissioned site consists of a site building, access road, and related civil infrastructure. In preparation for transfer of this property back to Government of NL, the site building and all associated structures must be removed as well as complete removal of civil infrastructure. The current scope includes demolition and removal of the ...

Project Telus Communications Inc. Radiocommunication Antenna Addition on Sechelt Band Lands No 2 Reserve, Sechelt BC

  • Location (5411 Reservoir Road Sechelt BC, Sunshine Coast area on the Sechelt Band Lands No 2 Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81086
  • Last Modified: 2020-10-20
  • Relevance: 10263.37
  • TELUS Communications Inc. is proposing the installation of a new antenna on the existing tower structure, for a microwave radio communication link from Sechelt BC to Cawley Point BC in the Sunshine Coast area. The Sechelt system is located on the Sechelt Band Lands No 2 Reserve, and the installation will include a 1.8m diameter microwave antenna mounted at the top of an existing 36m radiocommunication antenna tower. This system will carry  high capacity Ethernet network traffic ...

Project Canadian Coast Guard Clam Bay Pile Sites Navigation Aids Rebuild

  • Location (The sites are located within Clam Bay between Thetis and Penelakut Islands on the East Coast of Southern Vancouver Island, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81085
  • Last Modified: 2020-10-19
  • Relevance: 10260.97
  • The Canadian Coast Guard identifies locations where aids to navigation (nav-aids) are required to be constructed or modified to better provide their service and to improve the safety to those who maintain them. The Project aligns with the CCG and Federal Infrastructure Initiative's goal of providing safe, economical, and efficient services for marine navigation and is critical for Canadian Coast Guard mandate of providing safe and accessible waterways. It has come to the Canadian Coast ...

Project Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation

  • Location (Sakimay IR 74, Shesheep IR 74A, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81083
  • Last Modified: 2020-10-19
  • Relevance: 10260.65
  • The project area is comprised of the Designated Cottage Area within Shesheep IR 74A and Sakimay IR 74. The area is not a new development, but the renewal of leases including an inventory of vacant lots on a previously developed cottage lot area. The scope of the project includes the continued construction (as applicable), operation and maintenance of a cottage and/or other dwellings (i.e. mobile home, camper trailer), on a cottage lot (residential/recreational lease) situated on ...

Project Halifax Stanfield Runway 14-32 Terrain Removal

  • Location (Enfield, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80465
  • Last Modified: 2020-10-19
  • Relevance: 10260.14
  • At Halifax Stanfield International Airport, three areas of terrain near Runway 14-32 require modification to adjust grading and elevations.  The adjustment of the terrain will include removal and off-site disposal of approximately 8,000 m3 of pyritic slate bedrock, which underlies much of the airport property.  Off-site disposal will occur at an approved facility, following analytical testing of the material to confirm the absence of contaminants.  The areas will be reinstated ...

Project Webequie Supply Road Project

  • Location (McFaulds Lake area - Eastern limit, Ontario) (Webequie First Nation - Western limit)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80183
  • Last Modified: 2020-10-19
  • Relevance: 10259.64
  • Webequie First Nation is proposing the construction and operation, including maintenance, of a 107-kilometre all-season road connecting the Webequie Airport and the McFaulds Lake area in northern Ontario. The corridor would be approximately 35 metres in width in order to accommodate a two-lane gravel surface industrial supply road and could enable future infrastructure development such as transmission lines and broadband. As proposed, the Webequie Supply Road Project would connect Webequie ...

Project Marten Falls Community Access Road Project

  • Location (Marten Falls, Ontario) (Northern end of Painter Lake forestry road)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80184
  • Last Modified: 2020-10-19
  • Relevance: 10259.63
  • Marten Falls First Nation is proposing the construction and operation, including maintenance, of an all-season multi-use community access road approximately 190 to 230 kilometres in length, connecting the northern end of Painter Lake forestry road to the community of Marten Falls. Marten Falls is located at the junction of the Albany and Ogoki rivers, approximately 170 kilometres northeast of Nakina, Ontario. As proposed, the Marten Falls Community Access Road Project could ...

Project Junior Commissariat Officers' Quarters - Recapitalization Project

  • Location (Niagara National Historic Sites, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81003
  • Last Modified: 2020-10-18
  • Relevance: 10253.89
  • The recapitalization of the Junior Commissariat Officers' Quarters, a federally Recognized Heritage Building, is part of a series of Federal Infrastructure Initiative projects initiated in 2015 at Butler's Barracks National Historic Site. The Junior Commissariat Officers' Quarters is structurally unsound in certain areas, and renovations to the structure will be substantial including the replacement of the roofing system, stabilization and repointing of the chimneys, ...

Project Demolition of Office Building and Parking Canopies

  • Location (Demolition of Office Building and Parking Canopies, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81082
  • Last Modified: 2020-10-16
  • Relevance: 10248.63
  • The proposed project  RDM Enterprises Ltd. are proposing to demolish a two-storey 2,660 square foot (~250 square metres) office building and two parking canopies with footprints of approximately 16,150 square feet (~1500 square metres) and 8,600 square feet (~800 square metres) at their facility at 10897 Timberland Road in Surrey BC. The structures will be removed by way of contents removal, possible hazardous products and materials removal and subsequent mechanical demolition for ...

Project Frog Lake Waste Management Transfer Station

  • Location (Frog Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81081
  • Last Modified: 2020-10-16
  • Relevance: 10248.55
  • A new waste management transfer station will be built to replace the existing facility at Frog Lake, Alberta.  The new facility will provide more effective management and separation of waste materials and improved safety and security.  In doing so they will reduce tipping fees and give the Frog Lake First Nation more control over the operations.  the project will include a 1.3ha site adjacent to the existing wastewater lagoons, an upgraded access road, a security fence and ...

Project Telus Roehampton CP Rail Yard Mobility

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81080
  • Last Modified: 2020-10-16
  • Relevance: 10247.8
  • Telus is proposing to connect fiber service to a mobility shelter on a CP Rail Yard, including replacing an existing pole and pedestal, connecting conduit to existing pedestals, and adding new 1-100mm HDPE conduit through directional drilling to tie into an existing line and pedestal in the Town of Banff near Mountain Goat Lane and Lynx Street

Project Star Blanket Water Treatment Plant Upgrades

  • Location (Star Blanket First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81079
  • Last Modified: 2020-10-15
  • Relevance: 10244.89
  • The Proposed Project Design and construct a new water treatment plant for Star Blanket First Nation to be located on S10 TP23 R11 W2M. The new plant will include concrete reservoir with a capacity of 420,000 liters, one new well with pump and raw water supply line, bio-filter pre-treatment, membrane final treatment and distribution pumping. The plant will provide 2.0 lps of treated water. The buiding size is approximately 500 m2. The new building is located just north west of the old water ...

Project Kehewin Treatment Centre - 2020-3825

  • Location (Kehewin Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81036
  • Last Modified: 2020-10-15
  • Relevance: 10244.38
  • The Kehewin Treatment Centre will fill a need for shelter and access to social resources for the Kehewin Cree Nation. Proposed site: On reserve lands directly east beside the Kehewin Health Centre, near Eagles Landing Convenient Store along the north side of Highway 657. "Construction" includes placing 6 ATCO trailers from ATCO Structures on the empty grass lot (previously disturbed) within the core area of the community. The trailers will serve as a quarantine zone by providing ...

Project Dock Removal - Georgian Bay Islands National Park

  • Location (Georgian Bay Islands National Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81075
  • Last Modified: 2020-10-15
  • Relevance: 10244.28
  • The crib structure for several of our docks has been severely damaged from high water and ice over the past two years. The locations of these docks are Honey Harbour, Tonch South and Tonch East and one dock in Frying Pan Bay. These docks are unusable and a safety concern. Removal of the dock and cribs will be done through contract using a barge with excavator. The complete structure will be removed including the wooden frame and large stones within the crib. New docks for these locations are in ...

Project Golden Ears Forcemain (GDEFM) Project

  • Location (Golden Ears Forcemain Project, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80995
  • Last Modified: 2020-10-15
  • Relevance: 10242.42
  • The proposed project Metro Vancouver proposes to design, construct, and install twin sewer forcemains beneath the Fraser River to connect the new Golden Ears Pump Station, located north of the Fraser River, to the expanded Northwest Langley Wastewater Treatment Plant. This project is a component of a larger long-term servicing plan for Metro Vancouver to divert waste from Maple Ridge and Pitt Meadows to an upgraded Northwest Langley Wastewater Treatment Plant (NLWWTP) in the Township of ...

Project Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning

  • Location (Montreal Lake IR 106B, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81076
  • Last Modified: 2020-10-14
  • Relevance: 10241.3
  • Construction of the Solid Waste Transfer Station at S31-T52-R27-W3M and decommissioning of the existing disposal site. Approximately 500 lin.m. of perimeter chain link fence surrounding the site. New access roadways and 125m x 125m built up gravel pad serving as the transfer station area. Concrete retaining walls for ramp disposal area and separation of non-household waste materials. Used oil storage tank, used battery storage container and 30 cu.yd. waste bins will also remain on site ...

Project Tunnel Repairs

  • Location (National Defence Medical Centre Dental Wing, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81066
  • Last Modified: 2020-10-14
  • Relevance: 10241.17
  • Repair of existing underground tunnel located in vicinity of National Defence Medical Centre Dental Wing and Central Heating Plant. Project scope is excavation and exposure of the tunnel structure, and resealing of the tunnel's expansion joints. Specific project activities will include excavating to expose the exterior walls of the existing concrete tunnel, repairing the joints, followed by returning the soil back into place with dressing. It is expected that this project will be ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Assessment Status Display Filters

Date modified: