548 results

Project Rose Lithium - Tantalum Mining Project

  • Location (Municipality of Baie-James, Quebec)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80005
  • Last Modified: 2021-01-19
  • Relevance: 797.95
  • Critical Elements Corporation is proposing the construction, operation and decommissioning of an open pit lithium and tantalum mine located approximately 38 kilometres north of Nemaska, in Quebec. As proposed, the project includes the operation of an open pit, waste and tailings impoundment area, an industrial ore processing facility and the option of transforming concentrate off-site. The mine would produce about 4,500 tonnes of ore per day over a 17-year life span.

Project Private Landowner Shoreline stabilization, Shore wall, Trent-Severn Waterway, Shoreline Works Permit 200127

  • Location (Trent-Severn Waterway National Historic Site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81298
  • Last Modified: 2021-01-19
  • Relevance: 797.86
  • In order to prevent erosion, the land owner is proposing to install rock slope protection by placing 15cm to 30cm rounded granite boulders along 30m of shoreline to protect against wave action from boat traffic. Rock is to be ported by barge and placed presumably by machine. Footprint is approximated to be 30m x 2.5m, for 75m². Rock will be in water during spring freshet at higher river levels and partly in water during the rest of the year. The proposed project takes place along the shore ...

Project Construction of an administrative office with annexed mechanical workshop

  • Location (Mashteuiatsh, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81289
  • Last Modified: 2021-01-19
  • Relevance: 797.67
  • The project consists of the construction and operation of new administrative offices and a mechanical workshop. The dimensions of the building will be 18 m wide by 27.5 m long (495 m2). The mechanical workshop will have a dimension of 324 m2 (18 m X 18 m) while the administrative offices will occupy the building an area of 167 m2 (9.15 m X 18.30 m) on two floors. Parking areas for employees are planned in front of the building as well as on the side of the land. The residual surface ...

Project Reconfigure Power Distribution at the Exercise Control Site

  • Location (CFB Suffield, Medicine Hat, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81294
  • Last Modified: 2021-01-19
  • Relevance: 797.29
  • The Department of National Defence at Canadian Forces Base (CFB) Suffield is to execute a project to connect CFB Suffield's Exercise Control (EXCON) site to 25kV utility power. This project will be coordinated with a separate project, in which FORTIS will be responsible for installing 25kV power lines from existing lines to the 25kV-to-120V/208 transformer at EXCON. The aim of this project is to install transformer pads and underground trenching for cables and to renovate the existing ...

Project Proposed Dredge Material Management Site, Lismore, Pictou County, NS

  • Location (The Lismore property is located on Shore Road (Hwy 245) in Lismore, Nova Scotia (PID #01010492)., Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81295
  • Last Modified: 2021-01-19
  • Relevance: 797.21
  • The Small Craft Harbours Branch of Fisheries and Oceans Canada proposes to undertake the development of a dredge material management site intended to be used to manage sediment material resulting from maintenance dredging activities conducted at Bailey's Brook Small Craft Harbour. The site may also receive sediment derived from maintenance dredging of nearby Small Craft Harbours such as Arisaig, Livingstone Cove, and Cribbons Point. The dredge material originating from each of the ...

Project New Dredge and Disposal Sites at Tracadie Small Craft Harbor

  • Location (Project is located in the entrance channel to Tracadie Bay. The Tracadie Small Craft Harbour is located at 467 Harbour Road in Grand Tracadie., Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81293
  • Last Modified: 2021-01-19
  • Relevance: 796.69
  • Dredging of the entrance channel to Tracadie Bay will be carried out with a cutter suction dredge with pipeline disposal to the proposed disposal site located approximately 400 meters to the east of the entrance channel. Dredging will be undertaken on an as-needed basis, but will typically occur after ice leaves the harbour in early April and prior to the opening day of fishing season on April 30th. Up to 15,000 m3 of sand may be dredged and ocean disposed annually.

Project Malpeque Small Craft Harbour Dredge and Disposal Zone Amendments

  • Location (Project is located in the entrance channel to the Malpeque Cove Small Craft Harbour, which is located on the Malpeque Wharf Road., Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81292
  • Last Modified: 2021-01-19
  • Relevance: 796.59
  • The Malpeque Cove Small Craft Harbour entrance channel is dredged multiple times annually as per conditions of a Disposal at Sea Permit that is issued annually by Environment and Climate Change Canada. Due to changing environmental conditions at the dredge site, a number of changes to the Disposal at Sea Permit are being requested for the 2021-22 season. Fisheries and Oceans Canada –Small Craft Harbours is requesting to expand the boundaries of both the "Dredge and Disposal ...

Project CCI Wireless o/a Corridor Communications Inc. - Antenna Structure - Del Bonita Border Crossing, Hwy 62, Del Bonita, AB

  • Location (Del Bonita Boarder Crossing, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81291
  • Last Modified: 2021-01-18
  • Relevance: 792.99
  • CCI Wireless o/a Corridor Communications Inc. proposes to add an antenna to an existing 10 metre radiocommunication tower to enhance communication to the Canada Border Services Agency office, adjacent to Provincial Highway No. 62, Del Bonita Border Crossing, Hwy 62, Del Bonita, AB. The addition will include a 0.6m parabolic antenna mounted at 10m transmitting in the 17-19GHz frequency bands. This tower may undergo future modifications or the addition/replacement of antennas.

Project Meander River Essential Power Upgrade Project

  • Location (Meander River, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81290
  • Last Modified: 2021-01-18
  • Relevance: 792.77
  • The Meander River Essential Power Upgrade Project (the "Project") will replace an existing single phase power system with a three phase power system to deliver sufficient and efficient energy to the Town of Meander River. The Project will follow the existing right-of-way of the current power system and includes approximately 5% new construction for a padmount transformer within the Town of Meander River. The scope of the project includes: Convert 60 km of 14.4 kV one (1) ...

Project Nuclear Power Demonstration Closure Project

  • Location (Rolphton, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80121
  • Last Modified: 2021-01-18
  • Relevance: 792.66
  • Canadian Nuclear Laboratories (CNL) is proposing to decommission the Nuclear Power Demonstration Waste Facility, a former nuclear generating station that operated until 1987. The facility is located in Renfrew County, Ontario, on the south bank of the Ottawa River approximately 225 kilometres northwest of Ottawa. The structures that currently remain onsite include the main reactor building, a diesel generator, a ventilation stack, a pressure relief duct, a guardhouse, foundations from ...

Project Canadian Nuclear Laboratories Access Road Upgrade

  • Location (Canadian Nuclear Laboratories, Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81243
  • Last Modified: 2021-01-18
  • Relevance: 790.72
  • In support of ongoing operations at the Canadian Nuclear Laboratories (CNL), the upgrade of an existing road is proposed at the Atomic Energy of Canada (AECL), Chalk River Laboratories (CRL) site.  The objective of the upgrade is to provide an alternate access route to CNL's Chalk River site and reduce the impact of heavy construction traffic through the Village of Chalk River.  The physical activities associated with the proposed project will occur from January 2021 to ...

Project Hiawatha First Nation Water Systems Upgrade

  • Location (Hiawatha First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81231
  • Last Modified: 2021-01-17
  • Relevance: 786.4
  • The proposed project includes the construction of a water treatment plant and a distribution system to treat groundwater from existing wells in the Discovery Zone and supply potable water to private dwellings and band-owned facilities along Hiawatha Line, Lakeshore Road, and Paudash Street. The purpose of this project is to provide residents with a safe and reliable drinking water supply that satisfies both provincial and federal drinking water quality standards and ...

Project Lake Louise Community Fire Guard

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81249
  • Last Modified: 2021-01-17
  • Relevance: 786.4
  • This project will reduce the threat of wildfire to the community of Lake Louise and surrounding areas and improve fire resistance in the Bow Valley. The guard will serve as a containment-line to support large-scale wildfire suppression activities and provide a continuous valley-wide forest-fuel break from the south slope of Mount St. Piran to the cleared ski area runs on Whitehorn Mountain. This will be achieved by conducting large scale, mechanical forest thinning, while utilizing natural ...

Project Imperial Oil Dartmouth Terminal Dock 3 Repairs & Mooring System Replacement

  • Location (Imperial Oil Dartmouth Terminal, 600 Pleasant Street Dartmouth, B2Y 3Z7, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81242
  • Last Modified: 2021-01-17
  • Relevance: 786.4
  • Structural repairs and upgrades to the existing steel and concrete piled dock at Imperial Oil's Dartmouth Terminal. The project in general, involves installing four new mooring buoys and permanent anchors that will replace the existing stationary mooring dolphins, repairs to the existing concrete loading dock structure, and repairs to the approach structure that connects the loading dock to the shore.

Project Establishment of Seasonal Travel Corridor

  • Location (Sable Island National Park Reserve, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81248
  • Last Modified: 2021-01-17
  • Relevance: 786.4
  • The existing main road from the South beach from the Sable Island Main Station traverses an active tern colony (May – August). Vehicle movements along this corridor creates disturbance to nesting birds, and can contribute to nest failure and chick mortality. To reduce these impacts, it is proposed that a seasonal, temporary crossing be developed to allow access to the south beach from Main Station. The proposed location is located approximately 1.8 km east of Main Station and passes ...

Project Schnitzer Steel Maintenance Dredging

  • Location (Schnitzer Steel Maintenance Dredging, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81246
  • Last Modified: 2021-01-16
  • Relevance: 782.13
  • The Proposed Project  JJM Construction, on behalf of Schnitzer Steel Canada Ltd., proposes to conduct maintenance dredging of up to approximately 2,500 cubic metres of material adjacent to 12301 Musqueam Drive, Surrey, BC. The applicant is seeking a multi-year permit to dredge periodically. Previous maintenance dredging within the same footprint and to the same depth was most recently conducted in September 2017.   The Project ...

Project Grassy Mountain Coal Project

  • Location (Southwest Alberta, approximately 7 kilometres north of Blairmore, Alberta)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 80101
  • Last Modified: 2021-01-15
  • Relevance: 781.94
  • Benga Mining Limited, a wholly owned subsidiary of Riversdale Resources Limited, is proposing to construct and operate an open-pit metallurgical coal mine near the Crowsnest Pass, approximately seven kilometres north of the community of Blairmore, in southwest Alberta. As proposed, the production capacity of the project would be a maximum of 4.5 million tonnes of processed coal per year, over a mine-life of about 25 years.

Project Laurentia Project: Port of Quebec Deep-Water Wharf - Beauport Sector

  • Location (Port of Quebec Beauport Sector (North Shore), Quebec)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80107
  • Last Modified: 2021-01-15
  • Relevance: 780.86
  • The Quebec Port Authority is proposing to extend the line of the existing wharf eastward by 610 metres in order to operate a deep-water terminal dedicated to containerized general cargo. The 31.7-hectare project would include the construction of a new berth and a retaining dike that would allow for the development of an additional 17 hectares of backshore space. The project also includes the construction of rail lines and road accesses, the reconfiguration of two outfalls and ...

Project Regional Assessment in the Ring of Fire Area

  • Location (Ring of Fire, Ontario)
  • Assessment Type: Regional Assessment
  • Status: In progress
  • Reference Number: 80468
  • Last Modified: 2021-01-15
  • Relevance: 780.72
  • The Regional Assessment will be conducted in the area centred on the Ring of Fire mineral deposits in northern Ontario, approximately 540 kilometres northeast of Thunder Bay and 1,000 kilometres north of Toronto. The Impact Assessment Agency of Canada will work with the Province of Ontario, Indigenous groups, federal authorities, non-government organizations and the public to determine the appropriate activities, outcomes and boundaries of the regional assessment.

Project Replacement of the Britt Weather Radar

  • Location (8 Station Road, Britt, Ontario, P0G 1A0, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81200
  • Last Modified: 2021-01-15
  • Relevance: 780.56
  • The purpose of the project is to decommission the existing Britt Weather Radar, located in Ontario, and install a new weather radar system in its place. The new Britt radar will continue to provide   coverage for Northern Ontario and will consist of a 28 m open lattice steel tower with an 11.8 m diameter radome at the top (sphere covering the antenna) for a total height of approximately 41 m including lightning protection rods. The new radar will operate at frequency of ...

Project Replacement of the Aldergrove Weather Radar

  • Location (26600 8th Avenue, Langley, BC V0X 1A0, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81190
  • Last Modified: 2021-01-15
  • Relevance: 780.54
  • The purpose of the project is to decommission the existing Aldergrove, BC Weather Radar and install a new weather radar system in its place (a property owned by Transport Canada). The geographic coordinates of the proposed new radar are 49.016458 N, -122.487406 W. The new radar will continue to provide coverage for southwestern British Columbia and will consist of a 28-metre open lattice steel tower with a 11.8-metre diameter radome at the top (sphere housing the antenna) for a total height of ...

Project Pre-Fabricated Office Installation

  • Location (Rouge National Urban Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81288
  • Last Modified: 2021-01-15
  • Relevance: 779.47
  • Two locations in Rouge National Urban Park will be repurposed to serve as office headquarters for park staff. Each location, will have less 1 acre repurposed to include staff parking, driveway and footing to receive the pre-fabricated office. The first location, 363 Old Finch, is in the Toronto region of Rouge National Urban Park, repurposing the foundation of a vacant house. The second location, 9182 York Durham Line, is in the Markham region of Rouge National Urban Park, adjacent to the ...

Project Replacement of the Carvel Weather Radar

  • Location (1529 Parkland Hwy, Carvel, Alberta, T0E 0H0, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81223
  • Last Modified: 2021-01-15
  • Relevance: 777.92
  • The purpose of the project is to decommission the existing Carvel Weather Radar, located in Alberta, and install a new weather radar system in its place. The new Carvel radar will continue to provide coverage for the Edmonton area and will consist of a 22 m open lattice steel tower with an 11.8 m diameter radome at the top (sphere covering the antenna) for a total height of approximately 35 m including lightning protection rods. The new radar will operate at frequency of ...

Project Tofino CCG SAR Station - Float Reconstruction

  • Location (Tofino CCG SAR Station, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81240
  • Last Modified: 2021-01-15
  • Relevance: 777.92
  • The Department of Fisheries and Oceans Canada is planning to reconstruct the existing aging treated timber float at the Tofino Canadian Coast Guard Search and Rescue station.  The proposed project involves a like for like reconstruction of the existing 21.4 m x 6.1 m treated timber float.  The reconstructed timber float will be within the same footprint as the existing float, reusing the existing mooring piles, mitigating the need for pile driving.

Project Bella Bella CCG SAR/C&P Field Office Float and Mooring Pile Repairs

  • Location (Bella Bella CCG SAR/C&P Field Office, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81241
  • Last Modified: 2021-01-15
  • Relevance: 777.92
  • The proposed project scope involves a like for like reconstruction of approximately 33.0m x 3.0m of existing timber floats. The reconstructed timber float will be within the same footprint as the existing floats.  The mooring piles on site are combination of steel pipe pile and creosote treated timber pile, any deteriorated mooring piles will be replaced like for like should they be of a safety concern.

Project Canadian Coast Guard Purfleet Point Front and Rear Range Rebuild

  • Location (Lower Fraser River of the Vancouver Regional District, New Westminster, Annacis Island, British Columbia, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81286
  • Last Modified: 2021-01-14
  • Relevance: 776.03
  • Based on an ongoing review process, the Canadian Coast Guard identifies locations where fixed aids to navigation are required to be constructed, maintained, modified, or relocated and seeks the assistance of qualified consultants and contractors in providing these services. This project area is within the Lower Fraser River at the southwest end of Annacis Is. The project proposes to remove and rebuild 2 navigational aids in the Fraser River and remove 1 abandoned aid  structure.  ...

Project Cunard Bypass Trestle Bridge

  • Location (1325 Lower Water Street, Halifax, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81279
  • Last Modified: 2021-01-14
  • Relevance: 776.01
  • Southwest Properties is proposing to construct a temporary trestle bridge across Halifax Port Authority lands adjacent to a construction area along the Halifax waterfront. The temporary trestle bridge will allow pedestrians to access the boardwalk while the Cunard building is under construction. The trestle bridge will consist of 12 timber piles supporting timber cross bracing, wheel guard, and decking and will occupy an area of 84 m2 within Halifax Port Authority lands.

Project Rogers Cell Tower Installation CFB Kingston

  • Location (Fort Henry Heights, CFB Kingston, Kingston, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81285
  • Last Modified: 2021-01-14
  • Relevance: 775.88
  • Rogers is proposing to install a 40 metre high monopole cell tower as part of the federal initiative to make sites available on federal property. The cell tower will be placed on undeveloped land in a 10 metre by 10 metre fenced area with no ancillary structures. Construction is planned for mid to late 2021 with an estimated duration of 4-6 weeks. In the late 1990s, subsurface soil excavations in the vicinity of the project area uncovered soil contamination. This is the primary environmental ...

Project Area E Road Upgrade, Op REASSURANCE, Camp Adazi, Latvia

  • Location (Multinational Maintenance Compound, Camp Adazi, Kadaga, Latvia, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: In progress
  • Reference Number: 81284
  • Last Modified: 2021-01-14
  • Relevance: 775.41
  • The project consists of repairing and resurfacing an 800 metre, two-way gravel ring road within the space known as Area E at Camp Adazi. Pre-cast concrete slabs may be placed at the entrances and exits of the compounds with access to this road. This project requires minimal ground work and aims to improve road conditions.

Project Algonquins of Pikwakanagan - Water Supply and Treatment System

  • Location (Algonquins of Pikwakanagan First Nation, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81228
  • Last Modified: 2021-01-14
  • Relevance: 773.75
  • The proposed project involves the construction of a slow sand filtration Water Treatment Plant (WTP) with a distribution system to service parts of the Algonquins of Pikwakanagan community. This includes the detailed construction and alignment of all system components including an intake supply line from the Bonnechere River, construction of a water treatment plant and low lift station located at Lot 1-2 at the end of Chibekana Inamo road, and the distribution system to supply piped water with ...

Project Cedar LNG Project

  • Location (Kitimat, British Columbia)
  • Assessment Type: Impact assessment by substitution
  • Status: In progress
  • Reference Number: 80208
  • Last Modified: 2021-01-14
  • Relevance: 773.75
  • Cedar LNG Export Development Ltd. is proposing to construct and operate a floating liquefied natural gas (LNG) processing facility and marine export terminal near Kitimat, British Columbia. The proposed project would process and liquefy natural gas to produce approximately 3 to 4 million tonnes of LNG per year and include storage capacity for up to 250,000 cubic metres of LNG. The proposed project would have a lifespan of at least 25 years.

Project Teal-Jones Maintenance Dredging

  • Location (Teal-Jones Maintenance Dredging, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81238
  • Last Modified: 2021-01-14
  • Relevance: 773.75
  • The Proposed Project  Teal-Jones Group proposes to conduct maintenance dredging of up to 4,000 cubic metres of accumulated sediment and wood waste from their industrial water lot. The average target depth is -1.9 meters Local Low Water (LLW). Maximum depth will be -4 meters LLW at the eastern, deeper parts of the proposed footprint and will be 1 meter in the shallower parts of the ...

Project Trout Brook Culvert Rehabilitation, Cape Breton Highlands National Park

  • Location (Cape Breton Highlands National Park, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81236
  • Last Modified: 2021-01-14
  • Relevance: 773.75
  • Trout Brook (also known as Anthony Aucoins Brook) culvert was originally constructed in the 1950s, running beneath the Cabot Trail. The existing pipe has been identified for remediation. As this is a perched culvert, there is lost aquatic connectivity. A major focus of the remediation work will aim to provide aquatic connectivity, accommodate fish passage, and either extend or renew the design life of the culvert. Design options for the new culvert are currently undergoing discussion; however, ...

Project Muskeg Lake Cree Nation - Construction of commercial/retail building

  • Location (ASIMAKANISEEKAN ASKIY 102A, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81281
  • Last Modified: 2021-01-13
  • Relevance: 771.24
  • The Proposed Project Muskeg Lake Cree Nation - Construction of commercial/retail building Muskeg Lake Cree Nation is planning to build a 6000 square foot commercial/retail building adjacent to the Lakeside Medical building in a corner lot located at the corner of 105th Street East and Joseph Okemasis Drive in Saskatoon Saskatchewan. Planned businesses for the building are food/beverage services with drive-thru services along  with insurance, and related medical services. Construction ...

Project Pacific Enterprise Science Centre (PESC) Foreshore Maintenance

  • Location (Pacific Enterprise Science Centre (PESC), British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81233
  • Last Modified: 2021-01-13
  • Relevance: 769.63
  • The proposed project is the removal of natural debris that has accumulated along the foreshore area next to the wharf and the replacement of the existing rip rap rock shore wall that currently exists.  This project will take place within the existing dry, inter-tidal footprint of the current foreshore area.  This project is necessary for the safety and security of boats utilizing the neighbouring wharf.

Project Update Fuel Tank System

  • Location (Place du Portage IV, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81280
  • Last Modified: 2021-01-12
  • Relevance: 768.33
  • Correction of deficiencies detected in the technical report of a specialist consultant. These deficiencies are compared to the code CSA B139, CCME 2003 and to the SOR 2008-197 regulations and concern the oil tank system registered with Environment Canada under the number EC-00035826 which has a total capacity greater than 5000L. The consultant will ensure that the corrections are made so that the system becomes compliant with the codes CSA B139-2009 and CSA B139-2019, CSA-C282-09, CCME 2003, ...

Project Sturgeon Lake First Nation - Renovation for gas bar and convenience store

  • Location (Sturgeon Lake First Nation - Prince Albert Strip Mall, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81278
  • Last Modified: 2021-01-12
  • Relevance: 767.73
  • The Proposed Project Sturgeon Lake First Nation - Renovation for gas bar and convenience store The Sturgeon Lake First Nation plans a renovation of an existing commercial unit in a Prince Albert Strip Mall for a gas bar and convenience store. There will be a double walled split underground storage tank with 50,000L gas and 15,000L diesel fuel capacity to service the gas station. Existing water and sewer connections are to City of Prince Albert Infrastructure. Recycling and Solid ...

Project Bay du Nord Development Project

  • Location (Flemish Pass Basin, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80154
  • Last Modified: 2021-01-11
  • Relevance: 764.16
  • Equinor (formerly Statoil Canada Ltd.), in partnership with Husky Oil Operations Limited, is proposing to install and operate a floating offshore oil and gas production facility in the Flemish Pass, approximately 450 kilometres east of St. John's, Newfoundland and Labrador, in the Atlantic Ocean. As proposed, the Bay du Nord Development Project would be in operation for approximately 30 years, with the potential for additional wells and tie-backs to the production facility.

Project Heating System Conversion - Building 280 and 281

  • Location (HMCS Champlain property inside a developed area of Chicoutimi district, in the city of Saguenay., Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81276
  • Last Modified: 2021-01-11
  • Relevance: 764.11
  • This project consists of work execution, labor, materials/supplies and tools needed for the heating system conversion of building 280 and 281, from gas to electrical. Work includes but is not limited to replacement of gas boilers by electric boilers, including piping system and related insulation and also includes cancellation of former natural gas network connection. Structural work is planned, including roofing work for the disassembly of the air intake and chimney, replacement of partitions, ...

Project HMP0005 - Honoré Mercier Bridge, Repairs to piers and mobile bearing cases, painting, and reinforcement of steel components, phase 3

  • Location (Kahnawake, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81212
  • Last Modified: 2021-01-11
  • Relevance: 763.94
  • The goal of the project "HMP0005 – Honoré Mercier Bridge, Repairs to Piers and Mobile Bearing Cases, Painting, and Reinforcement of Steel Components, Phase 3" is to continue to replace the corrosion protection coating of the steel structure, repair and reinforce the reinforced concrete piers and structural steel, and repair or replace the bearing cases in the section of the Honoré Mercier Bridge that is under federal jurisdiction. This repair and replacement work ...

Project Marathon Palladium Project

  • Location (Marathon, Ontario)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 54755
  • Last Modified: 2021-01-11
  • Relevance: 763.82
  • Generation PGM Inc. is proposing to construct, operate and decommission an open pit palladium mine approximately 10 km from Marathon, Ontario. The proposed project would include three to four open pits, an ore processing plant, tailings and mine rock storage facilities, site access roads, a transmission line, explosives factory and magazines, water management facilities, ancillary mine infrastructure and associated activities. The rate of production would be approximately 22,000 tonnes per day ...

Project Ya Ha Tinda Ranch Solar Array

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81227
  • Last Modified: 2021-01-10
  • Relevance: 757.58
  • Parks Canada is proposing the installation of a 24kW Photovoltaic (PV) Solar Array and microgrid at the Ya Ha Tinda Ranch in an effort to green operations and reduce current generator use at the site. The array is intended to lessen fuel consumption and greenhouse gas emissions created from the use of diesel generators that power the site due to its remote location. It is anticipated the new solar array and supporting microgrid will cut operating costs and reduce CO2 emissions by ~78 tonnes ...

Project Norway House Cree Nation Water Intake Replacement and Lagoon Cell Decommissioning

  • Location (Norway House Cree Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81224
  • Last Modified: 2021-01-10
  • Relevance: 757.58
  • Norway House Cree Nation community requires an upgrade to the raw water intake system for the WTP and decommissioning of the old wastewater lagoon Cells #1 and #2. The existing raw water intake fish screen in Jack River will be replaced with a Z-alloy screen to prevent the accumulation of zebra mussels. A chlorine disinfectant line will be installed alongside the existing intake pipe and attached at the end of pipe to keep the interior of the intake pipe clear of zebra mussels and ...

Project Amendment to the construction hours and permit expiry date for the approved Sediment Remediation and Dike Construction

  • Location (Amendment to the construction hours and permit expiry date for the approved Sediment Remediation and Dike Construction, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81275
  • Last Modified: 2021-01-08
  • Relevance: 752.84
  • The Proposed Amendment  Advisian on behalf of Anthem Duncan Developments LP have proposed to carry out physical works related to the approved Project Permit No. 16-179: Sediment Remediation and Dike Construction beyond the standard construction hours (Condition 24 of the permit), and have also requested to extend the permit expiry date from February 28, 2021 to February 28, 2022.  Low tide in February may ...

Project Wasamac Gold Mine Project

  • Location (Wasamac, Quebec)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80879
  • Last Modified: 2021-01-08
  • Relevance: 751.56
  • Monarch Gold Corporation is proposing the construction, operation, decommissioning and abandonment of an underground gold mine located in the Abitibi-Témiscamingue region, approximately 15 kilometres from downtown Rouyn-Noranda, Quebec. As proposed, the Wasamac Gold Mine Project would have a mine life of 11 years and an ore production capacity of 6053 tonnes per day. The project would include the operation of an underground mine, the construction of an ore processing plant ...

Project Private Landowner Shoreline stabilization, Trent-Severn Waterway, Shoreline Works Permit 190274

  • Location (Trent-Severn Waterway National Historic Site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81274
  • Last Modified: 2021-01-08
  • Relevance: 751.33
  • In order to prevent erosion, the land owner is proposing to stabilize the shoreline by using irregular size river rock at a 3:1 slope. The project will result in 381m of shoreline coverage with 150 cubic meters of river rock/rip-rap. The proposed project takes place along the shore of Balsam Lake in southern Ontario, in waters falling under the jurisdiction of Parks Canada and administered by Ontario Waterways, the Trent-Severn Waterway. The proposed project is located within an area identified ...